Cryomodule Integration Plans

Niklas Templeton - STFC - UK Collaboration

On Behalf of the Cryomodule Design Team

26th LARP Hi Lumi Collaboration Meeting, 19th May 2016

logo

area

Content

Overview & Schedule

Cavity String Assembly

Top Plate Assembly

Support & Alignment

Thermal Shield Assembly

Warm Magnetic Shield

Vacuum Vessel Integration

Cryomodule in SPS

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 2

logo

area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3

SPS Test Prototype Cryomodule

3mm Thick MuMetal

Magnetic Shield OFHC Copper Thermal

Shield (50-70K)

Fundamental

Power Coupler

Vacuum Vessel

2.8 x 0.92 x 1.1 m

Cryogenic

Service Module

Dressed Cavity

in 2K

Helium Tank

Frequency Tuner

Mechanism

logo

area

Build, Test & Installation

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 4

logo

area 5

Revised Planning

First Re-Baselining after C&S Review I US cavities delayed

CERN cavity production (DQW) for SPS is adopted as baseline

Impact on SPS is significant

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans

logo

area

Cavity String Assembly

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 6

Assembled in SM18 ISO4 Clean Room

9 Cavity string components loaded on

to assembly trolley using manual crane

Components are individually positioned

and aligned

Sequential positioning with respect to

pervious flange

String is closed (aligned in Z direction)

Gate valves closed for Cryomodule

integration

logo

area

Assembled Cavity String

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 7

Common Support Plate

Vacuum Gate Valves

Beam Pipe

Tuner Frame

Fundamental Power Coupler

Dressed Cavity in Helium Tank

High Order Mode Absorbers

FSI

RF Probe

logo

area

logo

area

Cryomodule Assembly Welding of Cryogenic lines BCAM Assembly

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 8

logo

area

logo

area

Cryomodule Assembly

Top Plate Assembly

Top Plate Integration

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 9

Vacuum Vessel

Top Plate

Warm Magnetic Shield

Upper Assembly

Thermal Shield

Upper Assembly

logo

area

logo

area

Flexure

Mounts

Fundamental

Power Coupler

Waveguide-

Coax Transition

Cryomodule Assembly

Cavity Support & Alignment

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 10

Kinematic Adjustment

Tuner Mechanism

Dressed Cavity Support System

Common

Adjustment Plate

with 5-Point Support

logo

area

logo

area

Cryomodule Assembly

HOM Coaxial Connection

Thermal Shield Assembly

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 11

6 x HOM Coaxial lines with thermal

intercepts

2mm thick OFE

Copper Panels

Sheet Metal

Stiffeners

Brazed Copper

ETP Pipe

Split Cover

Plates

Contoured for

MLI Envelop

Conduction

Cooled End Caps

U-Panel with

Access Windows

4 x Flexure Mounts

Cu-SS Pipe

Transitions

logo

area

logo

area

Cryomodule Assembly

Lifting Frame with 2000 kg

capacity – 3 m stroke

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 12

Drop Down Assembly

Warm Magnetic

Shield Integration

• No connection possible

between upper & lower

MuMetal assemblies

• Shield relies on loose

contact and overlapping

joints for field attenuation

logo

area

logo

area

Final Cryomodule Assembly

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 13

Waveguide

Cryo Jumper

Blow off

Valve

Jack Supports

Lifting Points

BCAM

Vacuum

Gauges

Access

Windows

Top Plate + Cavity String &

Vacuum Vessel Assembly

1.1

m

logo

area

Tooling & Assembly Overview

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 14

SM18 External Clean Room Mounting Area

logo

area

General layout – SPS Point 6

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 15

logo

area

Cryomodule in SPS

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 16

logo

area

Cryomodule Summary

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 17

logo

area

logo

area

Thank You!

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 18

On Behalf of Cryomodule Design Team

Acknowledgements: R. Calaga, O. Capatina, T. Capelli, T. Jones, P. Minginette, M. Sosin,

G. Vandoni, C. Zanoni

logo

area

logo

area

Additional Slides

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 19

logo

area

logo

area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 20

BCAM

BCAM

Reflection shielding

Vacuum viewport

logo

area

logo

area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 21

logo

area

Vacuum tank Tolerances

Top view

±6 m

m

±4 mm

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 22

logo

area

Top Plate Integration

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 23