Corporate Performance Management

Post on 16-Nov-2014

1.683 views 1 download

Tags:

description

Linking Six Sigma and Balance Score Card in order to reaching high Corporate Performance Management (CPM) level.

Transcript of Corporate Performance Management

•Corporate Performance ManagementBy Linking Balanced Scorecard and Six Sigma

Prepared by TECHNOLEADResearch & Development Dept.

•22 September 2005

Agenda

• About CPM

• CPM roadmap by linking BSC and 6σ

• Recommendations

• Conclusion

2www.TECHNOLEAD.com

1 .About CPM

• Why CPM?

• Core Components1. Strategy

2. People

3. Measures

4. Process Excellence

5. Information Technology

3www.TECHNOLEAD.com

2. CPM roadmapby linking BSC and 6σ

4www.TECHNOLEAD.com

www.TECHNOLEAD.com 5

2. CPM roadmapby linking BSC and 6σ

• Set Strategy: BSC Goals & objectives

2. CPM roadmapby linking BSC and 6σ

• Set Strategy: BSC

• Define VOC: 6σ Customer satisfaction & CTQ

6www.TECHNOLEAD.com

www.TECHNOLEAD.com 7

2. CPM roadmapby linking BSC and 6σ

• Set Strategy: BSC

• Define VOC: 6σ

• Deploy KPIs: BSC and 6σ Measures & metrics

www.TECHNOLEAD.com 8

2. CPM roadmapby linking BSC and 6σ

• Set Strategy: BSC

• Define VOC: 6σ

• Deploy KPIs: BSC and 6σ

• Improve Processes: BSC and 6σ Analysis, improvement & control

2. CPM roadmapby linking BSC and 6σ

• Set Strategy: BSC

• Define VOC: 6σ

• Deploy KPIs: BSC and 6σ

• Improve Processes: BSC and 6σ

• Facilitate IT Solutions Integration & acceleration

9www.TECHNOLEAD.com

3. Recommendations

• Avoiding CPM pitfalls

• Enhancing CPM implementation

• Future directions

10www.TECHNOLEAD.com

4. Conclusion

11www.TECHNOLEAD.com

Thank you