Post on 07-Aug-2018
8/20/2019 Contract Change Order No. 18 Redacted
1/17
Citv of Carmel-bv-the-Sea
PUBLIC WORKS DEPARTMENT
POST OFFICE BOX CC, CARMEL-BY -THE-SEA, CA 93921
(831) 620-2070
CONTRACT CHANGE ORDER NO_ 18
CONTRACT AWARDED BY: City Council DATE
OF
AWARD Apr 7, 2015
~ ~ O ~ J ~ ~ T ~ ~ ~ ~ s ~ t _ T~ ~ ~ ~ ~ ~ e ~ n _ o ~ v ~ ~ t i ~ o ~
________
____
____________________
_________
SHEET
_____
_
o_f_
____
PROJECT ID#: 13-70903 Purchase Order#: 76-004428
TO: Otto
Construction
Company; 2150 Garden Road, Suite A-1, Monterey, CA 94940
,CONTRACTOR
You are
hereby requested
to make the
herein described
changes
from the
plans and
specifications
or do
the
following
described
work not included in the plans and specifications
on
this
contract
.
NOTE: THIS CHANGE IS NOT EFFECTIVE UNTIL FULLY EXECUTED.
Chan
Description:
1 CHANGES TO CONTRACT PLANS AND SPECIFICATIONS.
Deletion: Credit labor and materials related
to
the following: Reference RFP #25, Bulletins #14
&
14.1, and PCO #42
Rev1
(Otto's tracking number). Summary of Work; multiple items related
to Driveway Revisions and difficulty
in
drilling driveway piers.
Agreed Lump Sum ... .. . .... ..
..............................................
....... ......... ........ .. .
2 CONTRACT PRICE
Total decrease in contract price
3 CONTRACT TIME
Twenty Five (25) additional working days
$ (12,203.00)
Decrease
Original Contract Price
Approved Cost Changes to Date
Total
of
all Contract Changes
includ this Order
Sum net change in Contract Price
is
$ 1 462,236.00
$ 97,524.00
$
321.00
of the original Contract Price 5.8%
We the undersigned contracto
r
have given careful consideration to the change proposed
and
hereby agree if his proposal is
approved that we will provide all equipment furnish all materials except as may otherwise be noted above and perform all services
necessary for the work above specifi
ed
and
will accept
as
full payment therefore the price shown above.
Contractor:
Otto Construction Company
Signed
:
I
f he contractor does not sign acceptance of this order his attention is dir
ec
ted to the requirements
of
the
Submitted
:
ea
$
(12,203.00)
$ (12,203.00)
25
8/20/2019 Contract Change Order No. 18 Redacted
2/17
TT
Pr o
je ct
Forest
Th
eater Renovation
Description
of
Change
Below
and t t c h ~ d _ p l
mg is
related to RFP 25 amendment No. 1,
Bulletin
14
&
14.1 and Pricing is related to
the
reduction
of
the quantity of
driveway piers,
wall
height
and
stone veneer.
The additional
work
is
relate
the raising of
grade at
the
lower
pathways and discovered stone per RFI 2
Excludes
change in footing design
(Bulletin
14
&
14.1) at
section
of
already
poured
wall
at
the
acceptable parking
area.
Will
be
addressed in
separate
change
order
.
Excludes engineering
,
permits, surveyor,
detailing/shop
drawings and
undiscovered existing conditions.
Excludes
General Conditions costs,
to be
discussed at a
later date
.
CHANGE ESTIMATE ITEM
COST
M/U %
MIUTOTAL
GC DIRECT COSTS
GC
DIRECT LABOR
GC DIRECT MATERIALS
GC
DIRECT EQUIPMENT
GC OTHERIINDIRECTS
GC
MARKUP
ON DIRECT
COST
GC
MARKUP ON DIRECT LABOR
GC MARKUP ON DIRECT MATERIAL
GC MARKUP ON DIRECT EQUIPMENT
GC MARKUP ON DIRECT OTHERIINDIRECTS
GC SUBCONTRACT(S) OR OTHERS'
Patania Masonry
GC
FEE ON
SUBCONTRACT(S)
- 3,830
-
,046
7,
419
-$991
($3,830)
($6,046)
$7,419
($991)
($8,755)
- 8,755
0.0%
0.0%
0.0%
0.0%
0.0%
0
0
$0
0
0
Related RFI
42 Rev1
25
14.1
25
DATE: 12/03/15
TOTAL L, M,
&
E DIRECT COST -$3,448
TOTAL MARKUP ON DIRECT COST
0
TOTAL SUBCONTRACT
COST
- 8
,755
TOTAL
GC FEE
ON SUBCONTRACT( )
0
8/20/2019 Contract Change Order No. 18 Redacted
3/17
8/20/2019 Contract Change Order No. 18 Redacted
4/17
OJ
TO
' '
D ~ 5 t r l , . :m
RFP2
5
U220 &1.f 5
ldt « d .
a
nd a( l.( lfl
Dol
.::" , I
ti. Ec :- va o } r o:OT.(
l l l Gr.t,. 1 C B.c:kh.•
;o tlo
, ' '
)IIF'A
fC
.
'" 'l" '-1
0 2 _ . lOO U . ~ n t
sn.art
01\••
CI Ptt 1i
~ ~ ~ P• t uce
} t -«.4-:J.'P-
4f
C.J •
1\flf .n
1'
• l ' l . ' P ' . c
"lO• j• P.a
i') . , r • F . · ~ s N . . , : / 0
~ ~ . -
R . . - . . . c r o ~ ·
..u.JP·1')\c;
Stral,t.t 1 f t Ortha r ' l po FW
t ~ t
Lf.
i:J. I )I
l;,.
"
) h •• 'l
O·,,T ' f " " ' f l f \ I .
~ · Y I
' t ~ 20
0 r;, : f f'Cetl
rrg
f l : o ~ F · ~ )
1£
• . , .•
•
·( .
'< ol
'
,,.,.t
& G
.do
r' J.'
. , . 'O(' IUtt f '
II
~ : . . , ~ ~ · , . v ~ t ' f l t i . ' . I ' U L F
'"- f
-"11
.....,...
' 1 -:\
F
-1
P . .&;("'
.. l ln t
i
Of .
L
U n " . . , ' " ' " ./,;.
1
1l- P t . r ~ 1
t i l : PS
YJ.II ' f
.o·
Co nc'' ' ' wa
J VI t .. u t\)•J&
O l l i ~
Con
e . SC01n 0"10 .-eM
214 F
. C. C,,,•'t' ~ l
.,
"
tr<
tie.
,, ,.
i ) "A l
~ " " 1 1 1 . F
I
:;:r
_
:;r-
(. ••·
•o
;
;o;c,
(o t ',
- · 'iio4lfCV . J . . _ _ L ~ 2
Hr•j l ,
ICY
~ . 0 4
13"Jlo
__
; ,1 )
~ \ 1 I f
4 1 ~ · . .
t:
(
l ?t
• '.J
.C"'
r
c -::r_ ·
"
H·;c.; r :":
1'Ur't. U' \1 \ t • t t
) l . ~ (
...a,
})
:
.;;
. ~ '
f1
,H..2)
i ..
"
.,
; c ~ .
tnt )
i11
1)
t
l C )
j ( } . , ~ CY
~
A m O .o"'f
""'
I
_ .J
( l
urt
thr:C\Hit
A -,
,m
U
l l tHct l
1
1 U
_o
i T . •
""
1411
(41)
t 1 ~ : )
f
4j,
P?1)
6 , 3 9 ~
_'J(.t'
::'IC;'} .(;Y
~ r . l : J
1 4
8/20/2019 Contract Change Order No. 18 Redacted
5/17
DDITION L
WORK
UTHORIZ TION
ATTENTION
C('f.J I
:> ll ..t l
r:ll'
: I A I
o l . O G t
I
t
8/20/2019 Contract Change Order No. 18 Redacted
6/17
P O
42 Additional Time equest Summaries
Driveway Revisions Discovered Bedrock 21 Days
• Existing bedrock discovered Wednesday September 23, 2015. RFI 75 drafted and submitted
same day (9/23/15). Received new potential footing design 10/12/15 Cost of labor, material
and equipment was
not
beneficial to the project
or
the city. Bulletin 14.1 received 11/4/15
o Thirty-seven (31 usiness days
from
discovery
of
bedrock
o Requesting Twenty-one
Drilling Piers 4 Days
• Existing soil conditions
would not
allow required piers
to
install
per
plan
s
Section
of
piers was
removed
from lower
retaining wall per Bulletin 14.1. Contrac
tor
drilled piers per Bulletin 14
and original plans to best
of
ability. Not all piers could be drilled to required depth. Specialized
equipment was brought in.
o Four (4) days delay
8/20/2019 Contract Change Order No. 18 Redacted
7/17
OTTO
ONSTRU TION
To: Andrew Vanderford
CITY OF CARMEL BY THE SEA
P.O. Box CC
Carmel By the Sea, CA 93921
Ph: 831-620-2078
R I
I
RFI : 75
Date: 9/23/2015
2150 GARDEN ROAD, SUITE A-1
MONTEREY, CA 93940
Ph
: 831 657-9805
Job: 15-3141-00 FOREST THEATER RENOVATIONS
Phone: 831 )620-2078
CC: Monique Wood (Cody Anderson Wasney), Jilian Cadouri (Cody Anderson Wasney). Oscar Cisneros (Otto Construction), Matt
Wetmore (Otto Construction)
Subject:
Exposed Bedrock at Driveway
Drawing:
A0.4
Cost Impact: TBD
Request:
Spec Section: 310000
Schedule Impact: TBD
Date Required: 9/30/2015
During excavation of the footings for the stone walls along the driveway, contractor exposed a large area of bedrock at the south
most end of driveway. This bedrock intersects with our footing, piers and driveway. For the footings, Contractor is proposing to
jackhammer down to elevation per plans until reaching bottom of footings. Then in lieu of the piers at these locations, Contractor
proposes to dowel into the bedrock. Please verify with specialist and confirm acceptable.
Due to the unknown size of this area of bedrock, there is a possibility of hitting bedrock again when excavating
fo
r piers further up
the driveway. In this situation, Contractor is unsure of direction to take. It would be physically diffic
ul
t to dowel inside t
he
small, and
possibly deep excavation required for the piers. See attached map. Please advise.
Requested by: Scott Vander Heyden
OTTO CONSTRUCTION
Response:
See Attached Detail for Revised Footing with key at driveway . There is one design for 3 retained
soil and another with 1.5 retained soil.
The detail shows concrete shel f to support stone
veneer
notify RPSE if contractor prefers
to
use bolted
ledger angle to support stone on the driveway side.
8/20/2019 Contract Change Order No. 18 Redacted
8/17
8/20/2019 Contract Change Order No. 18 Redacted
9/17
Rinne
&
Peterson
ST R U
CT UR
AL E N G IN
EE
R S
C RMEL FOREST THE TER
Sheet No R I
75 -
By MSB
Dote 11/12/15
Keyways not included
in
PCO
~ 2
\6\1
f l ~ C V K e . P t l . / > < ; \ L ; . : ;
OC(.vRS ? . A ~ P t
II
II
0 ~ \ \ l t : I N ~
il
- - - -
f k \ 1 1 ~
r
·-
l'h"OX ~ ~ r
-
,_
I
5@
12"
o.c.
VERT
EA FACE
X
~
2
'
I
5
@ 16" o.c.
HORIZ EA FACE
- 0
I
-·
-·
#5@
12 O.C. EA WAY
TOP & BOT
STD HOOK AT
TOP
& BOT
TRANSVERSE
w
w
) .
F l t l . t . ~ .
h
0 ~ $
1
D.4.
BARS
-
•
:=
•
•
-·
.
•
•
•
- :
8/20/2019 Contract Change Order No. 18 Redacted
10/17
BULLETIN
NO.:
PROJECT NAME:
PROJECT
No.:
ISSUED
TO
' CODY ANDERSON W SNEY
14.1
P
er
location
cl
a
rificat
i
on
Carmel Forest
Theater
14017
Otto Construction
2150 Garden
Road,
Su
i
te
A 1
Monterey,
CA
93940
ARCHITE CTS
ISSUE DATE:
RFI No.:
ISSUED BY·
CC
ULLETIN
11
/4/
15
Jilian
Cadouri
Andrew Vanderford
All
materials
and work
hereinafter
shall
conform to
all the
requiroments
of he project
Drawings and Specifications.
except
as otherwise
described.
Choose
one
of
h
e
ollowing)
D
D
DESCRIPTION
Item
No. 01
Exec ute promptly the nstr
uct
ions given herein, which in
terpret
the
Contract
Documents or order minor c
hanges
in t
he
Work without
change
in
Contrac
t Sum
or
Contract Time.
If
you
cons
ider that a change n Contract Su mor Contract
Ti
me
is required, submit an itemized proposal to he Architec t immediately and before proceeding
with
this Work. If your
proposal is found tobe sa
tisfactory
and in proper order.
th
is
Bulletin
will be
superseded
by aChange Order.
II.
Changes
described
horein are being
considered
for
incorporation
in
to
h
eWork .
Submit an
it
emized quotat
i
on, in
format
required by
the Contra
ct Documents.
indicating
your proposed
changes
to the Contract Sum or Contract Time.
Do no
t
proceed wi
th
th
echanges described herein
unt
i
further
written instruct ions are iss
ue
d
by
the Architect.
Ill. In order
to
expedite
the Work and avoidor minimize de
lays
in the Work wh ich may affect
Cont
ract Sum or Contract
Time, t
he
Contract Documents
are
hereby
amended
as
described below . Poceed with this
work
promptly and subm it
final
costs
fo
r
Work
involved and change in
Contract Time
(if
any), for
incl
usion in
asubsequent
Change Order.
See attached markup
for
approximate pier locations
a
lon
g
dr
i
veway. On
east edge
of
driveway,
first
pier
to
occur where elevation
of
driveway
surface
is above surround
i
ng grade, as shown. Piers
to
continue
at
6'
-0
o.c.
Where driveway
elevation
is lower than or equal to surrounding grade, provide 6 curb only a
nd
regrade
away from
driveway as
necessary.
Delete
piers
from scope as
shown in
red.
On west
e
dge, piers
to occur
at 6'-0 o.c. starting
at
base of driveway
,
including where sandstone occurs.
8/20/2019 Contract Change Order No. 18 Redacted
11/17
* 1=5
@
12 O .C. H ORIZ.
_
OW LS
W
~ O O K @ T O P I £
3 '-6 LAP . . 0 PIER
* 1:3 S PIRA-L AT
3
PITCH
'12 ..,..OP It
BO
T :0:---1
S ~ E
V ERT. BARS
1 12 C L R
S TA IRS / S .O.G .
OR EX
: .
GRA-DE
q .
4
· 4
. 4
8/20/2019 Contract Change Order No. 18 Redacted
12/17
8/20/2019 Contract Change Order No. 18 Redacted
13/17
CODY
NDERSON W SNEY ARCHITE CTS
U ETIN
BULLETIN
NO.
14Dr
iveway Revisions
PROJECT NAME: Carmel
Forest
Theater
ISSUE DATE:
9/16/
15
RFI
No.:
PROJECT No.:
ISSUED
TO
14017
Otto Construction
2150 Garden Road, Suite
A-1
Monterey, CA
93940
ISSUED BY. Jilian
Cadour
i
CC Andrew Vanderford
All mate
rials
and
work
hereinafter shall
conform
t all the
requirements
of he project Drawings and Specifications, except
as
otherwise described.
Choose
one
of he following}
D
DESCRIPTION
Item No.
01
I
Execute
promptly t
he
instructions given
he
r
ein,
which
in
terpret the Contract
Documents
or order minor changes
in
the
Work
without change in Contract Sum or Contract Time . If you
consider
that a
change
in Contract
Sum
or ContractTime
is required
submit
an itemized proposal to the
Architect
immediately and before proceeding
with
this Wor
k
If your
proposal is found to
be
sa t
isfac
tory and in
pr
oper order, this Bulletin will
be superseded by
aChange
Order.
II. Changes described
herein
are
being considered for incorpor
ation
i
nto
the Work
.
Submit
an
i
te
mized
qu
otation, in
format requir
ed by
the
Contrac
t Docum
en
ts, i
nd
icating your proposed
changes to
t
he Contrac
t
Sum
or Contract
Time
.
Do not proceed
wi
th t
he
changes
described
here in
un
ti further writt
en
inst
ru
cti
ons are
issued by
th
e
Archit
ect.
Ill.
In
order toexpedi
te th
eWork
and
avoid or min imize
de
l
ays
in
th
eWork which m
ay
affect Contract
Sum
or
Contract
Time,
the
Contract Documents are
hereby
amended
as
described below . Proceed with th is
work
promptly and submit
final costs for Work involved and change in
Contrac
t Time
(if
any), for inclusion in a subsequent Change
Ord
e
r
Driveway
and
Stai
r
Layout
See
attached
CA-30.1 for
r
evised driveway
and
stai
r
layout.
S
ee attached
C1.1
or
r
evised
wall
he
ights
and
stair eleva
t
ions. Reduced wall heights allow
a
reduction
in
pier foot
i
ng
d
epth and rebar
size. See
attached
CA-30
2
for
revised detaii4/A6.7.
Stone
Wall
Per
attached
CA-30, omit sec
t
ion
of stone wall at top of
dr
iveway.
Omi
t
ballar
d light
at this
l
ocation.
Grad
in
g
adjacen
t
to dr
iveway
See
C1 1
for
revised
grading adjacent
to
driveway
to
soften retaining wall
.
Omit
plante r
wall (delete detail
4/A6.6)
.
REVIEWED
8/20/2019 Contract Change Order No. 18 Redacted
14/17
I
L o ~ . ~
Cody nderson Wasney rch i tec
t s,
Inc
455 L a m b e r t
Ave
n u e • P a I o A I t o, CA 94306
6 5 o . 3 2 a . 1 a 1 a ·
Fax
3 2 a . 1 a a a
C
opy
righ
C
2012 by CODY ANDERSON WASNEY ARCHI
TECT
S. INC.
J
FOREST
THE TER
Pr ojcici Naiiie · · · · ·
14017
PicitccfNu oo r
0
~ i . f c r o n
s
nee
£ : ~ r . - 1 1
CA 30.0
iiie · · ·
. -·-·· •. ... - - - Shoct
NUrrib r
8/20/2019 Contract Change Order No. 18 Redacted
15/17
·
iJI•Y
· ..
l
:
o
: > y \:_.
~
8/20/2019 Contract Change Order No. 18 Redacted
16/17
STONE
VE JEER,
SEE
3
/
DR
IVEWAY/AC
PA'v1 '
l
i:t5 12
O.C. HOR
IZ .
i:t3 SP.
RAL
A : 3 P IT
CH
W 1
11
2 TURNS
TOP It
1 11
2
CL R
STA IRS / S.O.G.
OR
EXT
.
GRA?E
q
8/20/2019 Contract Change Order No. 18 Redacted
17/17
•
t
1
t
t
l
·
.
.
I
e
•
I
:
:
1
;