Condenser Erection

Post on 07-Apr-2015

286 views 4 download

description

This is the gist of erection sequence of condenser.

Transcript of Condenser Erection

Outline of Condenser waterbox

Neck

N1

N2

side view front view

Tube water flow

hotwell

Tube module

Facts1 pass 2 flowHeat transfer area 35500 sq. m32000 tubes

29900 0.711 mm thick2080 1 mm thick

Cooling water flow 64000 cu. m per hr P = 0.5MPa(g) or 0.01MPa(abs) T = 20-43 deg c

ModulesCondenser is transported in 30 large size

assembly units Heaviest assembly unit 40 T

N1 blockNeckN2 blockLPH 1HotwellCondenser tube moduleWaterboxConnection to condenser

Resources Variablesneed 22 men

1fitter+(5rigger+8helper)+(4welder+4helper)

Duration 12-15 monthsConsumables welding rods 200 cases

5 box /case

TestsLeak test

Hydro test

DPT 100%

Radiography of joints 10%