Post on 24-Jun-2020
"Alternatives to more overhead lines - transmission and
distribution planning in today's environment"
Colloquium organised by
the institution of Electrical EngineersProfessional Group committee P9 (Power system operation and planning)
and co-sponsored by Pll (Power system measurement, protection and control)
and the South East Midland Centre
to be held at Radcliffe House, University of Warwick, Coventry on
Tuesday, 23 March 1993
PROGRAMME
9.00 Registration
Session one chairman: J A K Douglas (Merz & McLellan)
9.45 Chairman's opening remarks
1 9.50 "Transmission planning in today's environment":
E G Cleobury (National Grid)
2 10.30 "Security standards and investment incentives":
Dr B W Wharmby (Office of Electricity Regulation)
11.10 COFFEE
Session Two chairman: J Lorriman (Chairman, South East Midland
centre)
3 11.25 "Customer service supply availability": C F Edge(Midlands Electricity)
4 12.05 "Distribution planning and generation integration":A s Jhutty (Kennedy & Donkin Power)
12.45 LUNCH
Session Three chairman: J Lorriman (Chairman, South East Midland
centre)
5 2.00 "Some considerations for planning of Flexible
Transmission system Enhancements (FACTS)":
H L Thanawala (GEC Alsthom Transmission & Distribution
Projects)
6 2.40 "Impact of modern SF6 circuit breakers on substation
design": S M Ghufran Ali (Merz & McLellan)
3.20 TEA
Session Four Chairman: J A K Douglas (Merz & McLellan)
7 3.35 "Protection and control aspects of improved utilisation
of existing overhead lines": w J Laycock (NEI ReyrolleProtection), Dr J R McDonald (University of
Strathclyde) and J A Downes (National Grid)
8 4.15 "Experience with ABC": J W Hipwell and W C sayer
(Southern Electric)
5.00 CLOSE
The IEE is not, as a body responsible for the views or opinions expressed
by individual authors or speakers.
© 1993 The Institution of Electrical Engineers.Printed and published by the IEE, Savoy Place, London WC2R 0BL, UK
163/37/35 REFERENCE NO: 1993/160