OBJECTIVES OF ENERGY CELL
• CREATE ENERGY ECO-SYSTEM.• CREATE AWARENESS ABOUT ENERGY.• TRAINING ON ENERGY RELATED SUBJECTS.• BUILT CORE COMPETANCE IN ENERGY.• STUDY NATIONAL/STATE ENERGY POLICIES &
REPRESENT FOR INDUSTRIES GREVENCES.• UPDATE CMIA MEMBERS ON ENERGY RELATED
DEVELOPMENTS.• INDUSTRY – ACADEMIC INTERACTIONS TO NURTURE
ENERGY RELATED SKILL-SETS TO BECOME ENERGY AMBASSADORS.
• EXPLORE RENEVABLE ENERGY AS ALTERNATIVE ENERGY SOURCE.
3
ENERGY CELL FORMATIONCMIA SUBJECT EXPERT/ENTHUSIAST-5.ENGG. COLLEGE REPRESENTATIVES FROM 5 COLLEGES.
FROM EACH COLLEGE,
1 FACULTY MEMBER 5 STUDENTS
ENERGY CLUSTERS FORMATION IN INDUSTRY.
4
ENERGY CELL ACTION PLAN
1. QUARTERLY TRAINING PROGRAMME/ CONFERENCES ON.
ENERGY SAVING MEASURES IN LPG/OIL FIRED
INDUSTRIAL HEATING SYSTEM. OPTIMISE INDUSTRY ELECTRICITY BILL BY UTILISING
PF/ TOD / L.F INCENTIVES. ENERGY EFFICIENT LIGHTING SOLUTIONS. SOLAR THERMAL HEATING & PV ROOF TOP
SOLUTION FOR INDUSTRIAL APPLICATIONS. SAVINGS RELATED TO COMPRESSED AIR
SYSTEMS.2. FORTNIGHTLY ENERGY BULLETIN
CIRCULATION THROUGH CMIA NETWORK .
5
ISO 50001 IMPLEMENTATION. • ENERGY POLICY OF EACH INDUSTRY.• APPOINTMENT OF ENERGY MANAGER.• BENCHMARKING S.E.C. • BENCHMARKING OF ANNUAL ENERGY COST.• EMS-ENERGY MANAGEMENT SYSTEM.• CONDUCT ENERGY AUDITS.
ENERGY CLUSTER ACTIVITIES
NEED OF TIME FOR INDUSTRY1. MARKET COMPETETIVENESS.2. LOWEST PRODUCT COST.
605/09/2012
BACKGROUND DURING LAST 30 YEARS INDUSTRY HAS SEEN THREE
RECESSIONARY PERIODS.A. 1990 - 1992B. 1997 - 2000C. 2009 - 2013
DURING EVERY RECESSION, INDUSTRY HAS LEARNT LESSONS. i) R. M. COST REDUCTION.ii) VALUE ENGINEERING OF PRODUCTS.iii) REVERSE ENGINEERING IN PROCESSES.iv) INNOVATIVE METHODS FOR PRODUCTIVITY IMPROVMENTS (TPM, KAIZEN, )V) LEAN MANUFACTURING-VA/NVA,LOSSES/WASTAGES, MAN/MACHINE UTILISATION.
705/09/2012
BUT WHAT IS MISSING ????
REDUCTION OF ENERGY COST /PRODUCT
805/09/2012
WHY ENERGY SAVING ?
1. EXPLOITATION OF NATURAL RESOURCES FOR HUMAN ENERGY NEEDS. 2. DIMINISHING FOSSIL FUELS. 3. SCARCITY – LOAD SHADING. 4. GROWING ENERGY DEMAND. 5. INCREASING COST 15-20% P.A 6. IMPACT ON PRODUCT PRICE
905/09/2012
WHAT IS HAPPENING AROUND US ? 1. GLOBAL LEVEL = GLOBAL WARMING, KYTO PROTOCOL,
GREEN ENERGY, CARBON CREDITS.
1005/09/2012
PAT• KEY EQUIPMENT EFFICIENCY EVALUATION .
• BASE LINE DATA COLLECTION.• AREA WISE POTENTIAL FOR ENERGY CONSERVATION.
• SETTING TARGET - SEC / PRODUCT.• VERIFICATION IN BASE LINE ENERGY AUDIT BY DESIGNATED ENERGY AUDITORS (DENA).
• VALIDATION BY BEE.
SUCCESS STORIES OF AURANGABAD
• BAL-NATIONAL ENERGY MANAGEMENT AWARD-2013.• GPL : ENERGY CONSERVATION AWARD• GOODYEAR : EMS SINCE 10 YERS.
• NPPM : 6 YEARS NATIONAL AWARD FOR ENERGY CONCERVATION (1990-2000) 1105/09/2012
1. FINE PROCESS CONTROL 2. UTILITY AUTOMATION 3. ENERGY MANAGEMENT SYSTEM4. ADOPTING ISO 50001
HOW TO REDUCE ENERGY COST / PRODUCT ?
1205/09/2012
13
Energy Management
System
THE ENERGY MANAGEMENT CONCEPT
14
15
Energy Management & Sub Station SCADAProcess Automation SCADA
PROCESS
Proc
ess
Dev
ice
Com
mun
icat
ion
PROCESS PLC
Digital Outputs
Analogue Input
Analogue output
Digital Inputs
FT
SUBSTATION EQUIPMENTS
RTU
Boiler
HVAC
Chiller
AIR
FUEL
wATER
Compressor
FT
FT
FT
FT
TT
FT
PT
ELECTRICITY
FTP
T
FT
TT
Ethernet Hub
UTILITY
16
ADOPTING ISO 50001
1705/09/2012
18
TECHNOLOGY ADVANTAGE
SMART EQUIPMENT WITH COMMUNICATION SMART MULTIFUNCTION METERS WITH COMMUNICATION AND BUILT IN DI/DO MOTOR MANAGEMENT RELAYS SMART PROTECTION SYSTEMS NUMIRIC RELAYS BUILT IN DI/DO FAST AND LOW COST COMMUNICATION DEVICES. AVAILABILITY OF INTEGRATED IN SYSTEM
WHAT IMPORTANT IS PROPER CUSTOMIZATION FOR CUSTOMER NEEDS ?
1905/09/2012
NEED OF HOUR FOR INDUSTRY
DEFINE YOUR ENERGY POLICY APPOINT ENERGY MANAGER PUT EMS SYSTEM IN PLACE REDUCE ENERGY COST / PRODUCT CHANGE OF MINDSET
2005/09/2012
LET’S UNDERSTAND
EVERY WATT COUNTS.
EVERY CALORIE MUST BE PRODUCTIVE.
2105/09/2012
22
THANK YOU
MOB: +91 9325002911
SURESH TODKAR