Post on 04-Jun-2018
CARRIGGLAS, LONGFORD, CO. LONGFORD, IRELANDTel: +353 (0)43 33 41445 • Fax: +353 (0)43 33 45904
Email: info@kssl.ieWeb: www.kssl.ie
CARRIGGLAS, LONGFORD, CO. LONGFORD, IRELAND
DESIGN • FABRICATION • ERECTION • CLADDING
DESIGNFABRICATION
ERECTIONCLADDING
Elan Corporation, AthloneProject Manager: PM GroupEngineer: Donnelly Troy / Fluor Daniel EelTonnage: 4,000 Tonnes
Abbotts Intl., LongfordProject Manager: PM GroupEngineer: McElroy AssociatesTonnage: 3,000 Tonnes
McHale Park, CastlebarEngineer: KSSL (In-House)Tonnage: 525 Tonnes
O’Connor Park, TullamoreEngineer: Dermot O’Keefe & AssociatesTonnage: 350 Tonnes
Dalymount Park, Bohemians FCEngineer: Lohan & Donnelly Consulting EngineersTonnage: 380 Tonnes
WORKFORCEThe combination of our staff’sexpertise and experience combinedwith the use of advanced state-of-the-art equipment and technologyat our Longford plant ensuresproduction to the higheststandards.
SERVICESOur range of services include:• In-house structural design anddetailing
• Fabrication• Erection• Cladding• Metal decking• Stud welding• Fire protection painting• Beam camber machine• Site Safety Officer
Elan, Athlone
Bailie Foods, Bailieborough
McHale Park, Castlebar
Irish Cement, Drogheda
ISO 9001 Quality ManagementSystem – 987
ISO 14001 EnvironmentalManagement System – 987
BelmontNursingHomeEngineer:Lohan&DonnellyConsultingEngineersTonnage:525Tonnes
Structural Steel
Metal Decking
StudWelding
Fire Protection
����
Structural Steel
Metal Decking
StudWelding
Fire Protection
����
Tesco Ireland, NationwideEngineer: Michael Punch & Partners /
Niall Fitzsimons & AssociatesContractor: J. Mannings & Sons / Precision
ConstructionTonnage: 2,000+ Tonnes
TF Royal Theatre, CastlebarEngineer: GGP Consulting EngineersTonnage: 1,000 Tonnes
Dunnes Stores, NationwideEngineer: John Campbell & AssociatesContractor: Ascon / SisksQuantitySurveyors: Eugene Beglan & AssociatesTonnage: 3,000+ Tonnes
VERSATILITYThe company policy of continuallyupdating equipment and installingadvanced technology, as itbecomes available, ensuresprogressive development at alltimes to meet our customerrequirements.
With a weekly productioncapacity in excess of 250 tonnes,our combined facility to fabricate,erect and clad any project offersthe most comprehensive serviceavailable in the industry.
QUALITYCONTROLWe have been awarded thecoveted ISO 9001 QualityManagement Systems and ISO14001 EnvironmentalManagement System.
TECHNOLOGYAdvanced computerisation playsan important part in our Researchand Development Department.
Our in-house design team haveCSC Fastrak design software andStrucad detailing software whichdirectly links to our saw, drill andplate lines.
OTHER PROJECTSOur growing list of satisfied clientsinclude:
OPW – National Folk Park, Castlebar
Shannon Airport – Air Traffic Control
An Post – Portlaoise and Galway
Prison Services – Portlaoise,Castlerea,Wheatfield andMountjoy
Green Bio Fuels –Wexford
Irish Rail – Clongriffin andAdamstown
Kepak – Ireland and UK
Irish Cement, DroghedaEngineer: Mott McDonald /
White Young GreenTonnage: 3,500 Tonnes
Lagan Cement, KinnegadEngineer: Mott McDonald / ORSTonnage: 2,000 Tonnes
Structural Steel
Metal Decking
StudWelding
Fire Protection
����
Structural Steel
Metal Decking
StudWelding
Fire Protection
����
Structural Steel
Metal Decking
StudWelding
Cladding
����
Structural Steel
Metal Decking
StudWelding
Cladding
����
CARRIGGLAS, LONGFORD, CO. LONGFORD, IRELAND
DESIGN • FABRICATION • ERECTION • CLADDING
Bailie Foods, BailieboroughEngineer: Malone O’ReganTonnage: 550 Tonnes
Westport HouseEngineer: Ove ArupsValue: €350,000
Aerialview of
workshop
2 No. Sawand DrillingLines
CARRIGGLAS, LONGFORD, CO. LONGFORD, IRELAND
DESIGN • FABRICATION • ERECTION • CLADDING
Blackrock ClinicEngineer: White Young GreenArchitect: Scott TallonWalker /
CCH ArchitectsQuantitySurveyors: J.C. Hogan & AssociatesTonnage: 2,100 Tonnes
Kiernan StructuralSteel Ltd.Workshop
Steel StockStorage Area
Paint Spray Shop
Peddinghaus StructuralBurning & Coping Line
Structural Steel
StudWelding
Fire Protection
���