City of Aurora

FASTRACKS & TOD OPPORTUNITIES

SCI East Corridor Stakeholder’s Meeting

March 28, 2013 1

I-225 Corridor

Dayton

Montview

Gateway

Peoria-Smith East

Corridor

Abilene

City Center

13th Ave.

Fitzsimons/ Colfax

Florida

Iliff

Nine Mile

Growth Happens

Six Completed Plans:

• Gateway Park East

• Iliff

• Abilene

• Fitzsimons-Colfax and

13th Avenue

• Peoria-Smith

• Florida

In Process:

• Nine Mile

I-225 Corridor

Dayton

Montview

Gateway

Peoria-Smith East

Corridor

Abilene

City Center

13th Ave.

Fitzsimons/ Colfax

Florida

Iliff

Nine Mile

Station Area Plans

I-225 LRT Planning Workshop

Aurora Plans and Policies

• Aurora Comprehensive Plan

• Station Area Plans

• TOD Zoning

• Urban Street Standards

• Urban Park Standards

I-225 Corridor Project Timeline

I-225 Corridor Project Timeline

2008 Station

Area Plan

Pauls Corporation Project

DIA Proposal

Station

Platform Location

Peoria-Smith Station area

East Rail – I-225 LRT Station

Peoria-Smith

Fundamental Concept

I-225 LRT Planning Workshop 17

Peoria-Smith

Land Use Framework

I-225 LRT Planning Workshop 18

Peoria-Smith

I-225 LRT Planning Workshop 19

Peoria-Smith Transfer Station

I-225 LRT Planning Workshop 20

Peoria-Smith Transfer Station

I-225 LRT Planning Workshop 21

TIP Projects : Peoria-Smith

I-225 LRT Planning Workshop 22

Regional Grade

Separation Project

Peoria-Smith Station: Issues

• Compatible canopy design • “Amenities”

– bathrooms – services

• Construction coordination – Peoria Crossing – TIP project

• Potential LRT rail car storage • Parking

– structure – remote lot

24 I-225 LRT Planning Workshop