FREMONT UNIFIED S C H O O L D I S T R I C T
Centerville Middle School ConversionDrama Program Performance Space
January 22, 2020
Site Plan
2
Approved by the Board on June 26, 2019
Drama Classroom - Existing
3
Drama Classroom:• 1580sf; 450sf
performance area• Storage shared with
backstage area • Existing raised stage
and seating configuration not in DSA approved plans
• Light and sound table within seating area
• Curtain separates stage and seating area
4
Option 1 – Original Schematic Design Presented to the Board 11/20/19Highlights:
• Acoustic improvements to MPR for larger performances
• Locker rooms expanded in Bldg G
• Art room in Bldg D
• Drama room moves to Bldg D
5
Option 1 - Drama Classroom and Lockers Presented to the Board 11/20/19
Drama Classroom:• 1200sf; 430sf performance area; and 45-55 seat
capacity• 165sf of usable storage• No backstage area• No curtain
Locker Room Expansion:• (2) Locker Rooms at 1968 sf ea:
• 772 Day Use Lockers ea• 255 PE Use Lockers ea
• (2) Offices at 248 sf ea• (2) Storage at 255 sf ea• (2) Multi Occupant Restrooms and (2) Single
Occupant/Gender Neutral Restrooms
MPR:• Acoustic improvements and portable lighting for
larger drama performances
Design for drama meets approved Middle School Educational Specifications
Scope of work is within current project budget
Option 2 – Site Plan
6
Highlights:• Hardcourt space
extended • Square footage added to
Bldg G• Drama remains in Bldg G• Locker rooms expanded
in Bldg G• No improvements to
MPR
7
Option 2 – Building Floor PlansDrama Classroom:• 1580sf; 450 sf performance area; 50-60 seating capacity• 418 sf for backstage and storage• Curtain location in approximately same location as existing
Locker Room Expansion:• (2) Locker Rooms at 1,702 sf ea:
• 772 Day Use Lockers ea• 255 PE Use Lockers ea
• (2) Offices at 320 sf ea• (2) Storage at 265 sf ea• (2) Multi Occupant Restrooms and (2) Single Occupant/Gender Neutral
Restrooms
MPR:• No improvements
Hardcourts:• Expansion to account for addition to Bldg G
Additional Cost: $3M
Items to note:• Drama remains in current space• Smaller square footage for lockers than in SD option, no impact to locker
count• Creates additional flex lab in Bldg D
Option 3 – Site Plan
8
Highlights:• Locker rooms
expanded in Bldg G• Drama moves to Bldg
D with larger sf• Art moves from Bldg D
to new modular • No improvements to
MPR
9
Option 3 – Building Floor PlansDrama Classroom:• In Bldg D, D2 and D3 combined to create larger space• 2,360 sf; 653 sf performance area; 85-95 seating capacity• Curtain locations to be developed• 240 sf for side stage• 318 sf for storage
Locker Room Expansion:• (2) Locker Rooms at 1,964 sf ea
• 772 Day Use Lockers ea• 255 PE Use Lockers ea
• (2) Offices at 250 sf ea• (2) Storage at 255 sf ea• (2) Multi Occupant Restrooms and (2) Single Occupant/Gender Neutral Restrooms
Art Room:• Moves to new modular• 1,440 sf
MPR:• No improvements
Additional Cost: $3.9M
Items to note:• Drama room will have low ceiling and suboptimal sight lines• Drama program does not have history in this type of space
10
Option 3 – Side View
Next Steps
11
• Complete Design Development phase
• Develop phasing plan with Contractor, Construction Manager, and Site
• Continue coordination of schedule, phasing, cost and constructability
Reference Slides
12
Centerville MS CampusOriginal Design Direction/Goals for Conversion Project:• Student centric spaces for 6-8• 2 story Development• Update Centerville presence in community• Minimize Portables• Safe Student Drop-off• Outdoor learning spaces
Community/Board Input at 10/24/18 Meeting:• Expansion of Playfields• Space for Emergency Supplies• 2 story Development• Classrooms in New Construction• Minimize New Portables• Safe Student Drop-off
Updated Input from the District since then:• Old Enrollment Projections: 1822 • Updated Enrollment Projections: 1545*
*Based on Jan 2019 Report to 2024/2025• Incorporation of Ed Specs 13