CEMEX REDWOOD CITY CEMENT TERMINAL EQUIPMENT UPGRADE & MODIFICATION PROJECT.

Post on 15-Jan-2016

226 views 0 download

Tags:

Transcript of CEMEX REDWOOD CITY CEMENT TERMINAL EQUIPMENT UPGRADE & MODIFICATION PROJECT.

CEMEXCEMEXREDWOOD CITY CEMENT TERMINALREDWOOD CITY CEMENT TERMINAL

EQUIPMENT UPGRADE & MODIFICATION PROJECTEQUIPMENT UPGRADE & MODIFICATION PROJECT

CEMEXCEMEXREDWOOD CITY CEMENT TERMINALREDWOOD CITY CEMENT TERMINAL

EQUIPMENT UPGRADE & MODIFICATION PROJECTEQUIPMENT UPGRADE & MODIFICATION PROJECT

RMC Pacific Materials Purchased The Terminal From Ideal Cement

March 1, 2005 – CEMEX Officially Purchased RMC Standard Procedure During An Acquisition Includes

Formation Of A Post Merger Integration (PMI) Team• Evaluation Of Facility Operations And Procedures &

• Recommendations To Bring Facility In Compliance With CEMEX Standards

Improve Operations, Safety, Environmental And Community Service Improve Customer Service.

CEMEXCEMEXREDWOOD CITY CEMENT TERMINAL REDWOOD CITY CEMENT TERMINAL

UPGRADE OBJECTIVESUPGRADE OBJECTIVES

Convert Storage Silo Dedicated For Fly Ash To Cement Truck Load-Out System Upgrade And Improvement

• Upgrade Existing Truck Loading System With Up To Date Equipment And Add An Additional Load-out Spout That Will Expedite Load Times By Half;

• Install A Second Two Spout Truck Loading System; &

• Centralize Nearly All Of The Cement Storage And Loading To One Vicinity Of The Terminal That Is Away From The Pacific Shores Complex.

CURRENT TERMINAL ENTERANCE CURRENT TERMINAL ENTERANCE & TRAFFIC PATTERN& TRAFFIC PATTERN

Stockhouse D

Current Loadout

Phase 1 Loadout System

Phase 2 Loadout System

PROJECT OVERVIEW

PROPOSED TRAFFIC PATTERN PROPOSED TRAFFIC PATTERN & LOADING SYSTEM LOCATIONS& LOADING SYSTEM LOCATIONS

New Traffic Pattern

Phase 2 Loadout System

Phase 1 Loadout System

Artist conception of Phase 1 ModificationModern 2 Nozzle Loadout System Replaces Single Nozzle system

PROPOSED IMPROVEMENTPROPOSED IMPROVEMENT

PROPOSED IMPROVEMENTPROPOSED IMPROVEMENT

Artist conception of Phase 1 & 2 ModificationsViewed Facing The New Phase 2 Loadout System

Phase 2

Phase 1

PROPOSED IMPROVEMENT (cont.)PROPOSED IMPROVEMENT (cont.)

Move Truck Loading From The Small Bulk Tanks To Stock House – D;

Utilize Four Storage Silos In Stock House – D As Both Storage And Load-Out;

Replacing Inventory From Adjacent Silos Reduces Time Required To Re-fill System;

Reduce Energy Consumption And Operating Cost; Reduce Truck Loading And Waiting Time; Installation Of Modern Equipment Minimizes Emissions;

PROPOSED IMPROVEMENTS (cont.)PROPOSED IMPROVEMENTS (cont.)

Minimizes The Number Of Trucks Waiting On Seaport Blvd. Which Would Move Cement Trucks Inside The Terminal;

Moves A Majority Of The Truck Loading Operations Away From Property Line Adjacent To Pacific Shores;

Centralize Cement Storage – Minimize Transfer Of Cement From Stock House – D To Small Bulk Tanks

Pave Roads • Minimize Fugitive Dust During The Dry Season• Minimize Mud Track Out During Wet Weather Season

Any Questions?