Post on 27-Apr-2020
YEAR:2008-09
Block Village Approved Revised(if available)
1 2 3 4 5 6 7 8 9 10A SINGHAT BLOCKi) Generala) Communication (IVR)1 Constn. Of IVR from Lanchah to Mongjang SGT Lanchah 4.00 4.00 4.00 4.00 Completed
2 Constn. Of IVR from Theigotang to Hiangtam (V)
do Theogotang 3.00 3.00 3.00 3.00 Completed
3 Constn. Of IVR from Hengjang to Hiangtam (K)
do Hengjang 4.00 4.00 4.00 4.00 Completed
4 Constn. Of IVR from Suangdai to Ngaljang do Suangdai 4.00 4.00 4.00 4.00 Completed
5 Impvt. Of Link Road between L. Kanan & Behiang
do L. Kanan 3.00 3.00 3.00 3.00 Completed
6 Constn. Of IVR from Hengjang to Songjang do Hengjang 4.00 4.00 4.00 4.00 Completed
7 Cosntn. Of IVR from Suangdoh to Sialbu via Chingai
Suangdoh 10.00 10.00 10.00 10.00 Completed
b) BRIDGES
8 Constn. of S/Bridge over Tuilak river between Lungthul(L)& Sialbu
SGT Lungthul (L) 7.32 7.32 7.32 7.32 Completed
9 Constn. of S/Bridge over Tuivel river between Pakmual and Behiang (V)
SGT Pakmual & Behiang
6.00 6.00 6.00 6.00 Completed
10 Constn. of S/Bridges over Kangkap river between Kangkap and Ngaljang
SGT Kangkap & Ngalzing
6.00 6.00 6.00 6.00 Completed
11 Constn. of S/Bridges over Tengkhol stream between Tongjang and Lungjang
SGT Tongjang & Lungzing
6.00 6.00 6.00 6.00 Completed
c) Community Building
BORDER AREA DEVELOPMENT PROGRAMME(BADP)
(Rs. in lakhs)Name of the District:CHURCHANDPURSl.No. Name of the schemes/projects Location
COMPLETED SCHEMES/PROJECTS TAKEN UP UNDER BADP (YEAR-WISE/DISTRICT-WISE/BLOCK-WISE/DEPTT-WISE/SECTOR-WISE)
Amount released by MHA
Amount utilised
RemarksProject Cost Amount Sanctioned
Block Village Approved Revised(if available)
1 2 3 4 5 6 7 8 9 10
Sl.No. Name of the schemes/projects Location Amount released by MHA
Amount utilised
RemarksProject Cost Amount Sanctioned
12 Constn. Of Community Hall at Tuima (Kangkap) SGT Tuima (Kangkap)
5.00 5.00 5.00 5.00 Completed
13 Constn. Of Community Hall at Tuikuimuallum do Tuikuimuallum 5.00 5.00 5.00 5.00 Completed
14 Constn. Of Community Hall at Sialbu do Sialbu 5.00 5.00 5.00 5.00 Completed
15 Constn. Of VA house at Hiangtam (V) do Hiangtam (V) 3.00 3.00 3.00 3.00 Completed
d) Education/ Playground
16 Constn. Of Tribal Girl Hostel at Singngat HQ do Singngat HQ 20.00 20.00 20.00 20.00 Completed
17 Constn. Of Playground at Suangphu do Suangphu 3.00 3.00 3.00 3.00 Completed
18 Constn. Of Playground at Theigotang do Theigotang 3.00 3.00 3.00 3.00 Completede) Agriculture & Allied
19 Community Fishery farm at Hengjang do Hengjang 2.00 2.00 2.00 2.00 Completed
20 Banana Plantation at Tonjang do Tonjang 3.50 3.50 3.50 3.50 Completed
f) MI DAMS
21 Constn. Of B/S Dam at Tengkol stream at Jangnuam for Nengkhanmang Lourup
do Jangnuam 3.00 3.00 3.00 3.00 Completed
22 improvement of M.I. Dam at Ngasuan river near Tonjang
Tonjang 5.00 5.00 5.00 5.00 Completed
g) Health & sanitation
23 Provision for treatment & purchase medicine etc in medical emergencies in remote border areas.
do 5.00 5.00 5.00 5.00 Completed
h) WATER SUPPLY
24 Constn. Of RWS at L.Kanan do L.Kanan 3.00 3.00 3.00 3.00 Completed
25 Constn. Of RWS at Mongjang do Mongjang 3.00 3.00 3.00 3.00 Completed
i) BEHIANG CLUSTER
COMMUNICATION :
26 Construction of IVR from Songjang to Aishi do Songjang 5.00 5.00 5.00 5.00 Completed
27 Constn. Of IVR from L. Kanan to Behiang(V) do L.Kanan 5.00 5.00 5.00 5.00 Completed
AGRICULTURE & ALLIED
Block Village Approved Revised(if available)
1 2 3 4 5 6 7 8 9 10
Sl.No. Name of the schemes/projects Location Amount released by MHA
Amount utilised
RemarksProject Cost Amount Sanctioned
28 Plantation of Lemon at Pakmual do Pakmual 3.00 3.00 3.00 3.00 Completed
29 Plantation of Ginger at Suangdoh do Suangdoh 2.00 2.00 2.00 2.00 Completed
SUANGDOH CLUSTER
j) COMMUNICATION :
30 Constn. Of IVR from Sialbu to Lungthul (L) with 4m.span slab culvert over Sialbu stream
do Sialbu & Lungthul
6.00 6.00 6.00 6.00 Completed
Total (Singhat): 146.82 0.00 146.82 146.82 146.82 0.00
B THANLON BORDER BLOCK
a) Infrastructure
COMMUNCIATION
31 Constn. Of IVR from Thuangtam to Umtal Thanlon Thuangtam & Umtal
6.00 6.00 6.00 6.00 Completed
32 Constn. Of IVR from Umtal to Mualkui do Umtal & Mualkui
5.00 5.00 5.00 5.00 Completed
33 Construction of road from Mong-on to Vaipheimual
do Mong-on & Vaipheimual
6.00 6.00 6.00 6.00 Completed
b) BRIDGES/SLAB CULVERT
34 Constn. Of S/Bridge over Tuikui river between Pangmual and Khuanggin
do Pangmual & Khuanggin
7.00 7.00 7.00 7.00 Completed
c) Social sectorCOMMUNITY DEVELOPMENT
35 Constn. Of VA House at Songtal do Songtal 6.00 6.00 6.00 6.00 Completed
36 Constn. Of VA House at Thuangtam do Thuangtam 6.00 6.00 6.00 6.00 Completed
37 Constn. Of VA House at Tongkham do Tongkham 5.00 5.00 5.00 5.00 Completed
38 Constn. Of Community Hall at Sumtuh do Sumtuh 8.00 8.00 8.00 8.00 Completed
39 Constn. Of VA House at Phailenbung do Phailenbung 4.00 4.00 4.00 4.00 Completed
40 Cosntn. Of VA House at Phaitong do Phaitong 5.00 5.00 5.00 5.00 Completed
41 Cosntn. Of Community Hall at Thuangtam do Thuangtam 4.50 4.50 4.50 4.50 Completed
42 Construction of V.A. House at Pamjal do Pamjal 5.00 5.00 5.00 5.00 Completed
Block Village Approved Revised(if available)
1 2 3 4 5 6 7 8 9 10
Sl.No. Name of the schemes/projects Location Amount released by MHA
Amount utilised
RemarksProject Cost Amount Sanctioned
43 Construction of V.A. House at Mong-on do Mong-on 5.00 5.00 5.00 5.00 Completed
44 Construction of Community Hall at Mualkui do Mualkui 5.00 5.00 5.00 5.00 Completed
45 Construction of Community Hall at Kaihlam do Kaihlam 4.50 4.50 4.50 4.50 Completed
46 Construction of Villaga Authority House at Phaipheng
do Phaipheng 4.50 4.50 4.50 4.50 Completed
MARKET SHED
47 Cosntn. Of Market shed at Songtal do Songtal 8.00 8.00 8.00 8.00 Completed
b) Education Sector
48 Constn. Of Tribal Girl Hostel Building at Thanlon HQ
do Thanlon 20.00 20.00 20.00 20.00 Completed
c) Agriculture & Allied Sector
MI DAM
49 Cosntn. Of MI Dam at Sumtuh do Sumtuh 6.00 6.00 6.00 6.00 Completed
50 Constn. of Community Fishery pond at Sumtuh
do Sumtuh 6.00 6.00 6.00 6.00 Completed
51 Constn. of Community Fishery pond at Khajang
do Khajang 6.00 6.00 6.00 6.00 Completed
d) Health & sanitation Sector
52 Provision for treatment & purchase medicine etcin medical emergencies in remote border areas.
do Whole Bolck 5.28 5.28 5.28 5.28 Completed
Water Supply
53 RWS at Umtal do Umtal 3.00 3.00 3.00 3.00 Completed
54 RWS at Khajang do Khajang 3.00 3.00 3.00 3.00 Completed
Total (Thanlon): 143.78 143.78 143.78 143.78
Total (Churachandpur District): 290.60 290.60 290.60 290.60
YEAR:2008-09
Block Village Approved Revised(if available)
1 2 3 4 5 6 7 8 9 10
I:TENGNOUPAL BLOCK :A. Education Sectors
Constn of Hostel Building1 Constn. Of Girls Dormitory for
Moreh Govt. High SchoolTPL Moreh 6.00 6.00 6.00 6.00 Completed
Constn. Of Library Building:1 Constn. Of Library cum Recreation
Centre at Moreh Ward No. 3TPL Moreh 8.00 8.00 8.00 8.00 Completed
Constn. Of Playground2 Constn. of Play ground at Angbrasu
VillageTPL Angbrasu 5.00 5.00 5.00 5.00 Completed
3 Constn. of Play ground at Sairel Shaisim
TPL Sairel Shaisim
5.00 5.00 5.00 5.00 Completed
4 ,-do- at New Mongjang/ Khomunnom
TPL New Mongjang
5.00 5.00 5.00 5.00 Completed
5 ,-do- at Khudengthabi TPL Khudengthabi
4.00 4.00 4.00 4.00 Completed
B. Agricultural & Allied Sectors6 Construction of MI Dam across
Phaisan stream for Phisan LoubukTPL Lamlong
Khunou5.00 5.00 5.00 5.00 Completed
7 Constrn. Of MI Dam 7 canal across Kangoitong stream for kangoitong Loubuk
TPL Lamlong Khunou
5.00 5.00 5.00 5.00 Completed
Amount utilised
Remarks
BORDER AREA DEVELOPMENT PROGRAMME(BADP)COMPLETED SCHEMES/PROJECTS TAKEN UP UNDER BADP (YEAR-WISE/DISTRICT-WISE/BLOCK-WISE/DEPTT-WISE/SECTOR-WISE)
Name of the District:CHANDEL (Rs. in lakhs)Sl.No. Name of the schemes/projects Location Project Cost Amount
SanctionedAmount released by MHA
8 MI Dam across Anchapso river for M Piba Loubuk
TPL Saibol 2.00 2.00 2.00 2.00 Completed
9 -do- Mangkarok Lok for AS Piba Loubuk
TPL Saibol 4.00 4.00 4.00 4.00 Completed
10 -do- Ngachan Lok to Mayonmi Loubuk
TPL Yangkhul 4.00 4.00 4.00 4.00 Completed
11 -do- Tuiphei Lok for Kochai and Angkham Loukon
TPL Kharou Khunou
5.00 5.00 5.00 5.00 Completed
Plantation12 Banana Plantation at Rilram Centre TPL Rilram
Centre3.00 3.00 3.00 3.00 Completed
C. Health & SanitationConstruction of Water Reservoir at:
13 Chellep TPL Chellep 3.00 3.00 3.00 3.00 Completed
14 N. Gamnom TPL N. Gamnom 3.00 3.00 3.00 3.00 Completed
15 Near Good Shepherd English School, Moreh.
TPL Moreh. 3.00 3.00 3.00 3.00 Completed
D InfrastructureSectorRoad & Culvert
16 Levelling of IVR at Kambang Khullen
TPL Kambang Khullen
2.00 2.00 2.00 2.00 Completed
17 Levelling of IVR at Leibi TPL Leibi 2.00 2.00 2.00 2.00 Completed
18 Contn. of IVR from Yongkhul to Ngachan
TPL Yongkhul & Ngachan
4.00 4.00 4.00 4.00 Completed
19 Constn. of Slab culvert with Singling at Moreh Heinou Makhong, Meitei Leikai
TPL Moreh Heinou
Makhong
4.00 4.00 4.00 4.00 Completed
20 Construction of road from Lamlong Khunou to Tatyang
TPL Lamlong Khunou
5.00 5.00 5.00 5.00 Completed
21 IVR from Rilram Center to Kharou Khullel
TPL Kharou Khullel
3.00 3.00 3.00 3.00 Completed
22 IVR from B. Bongjang to L. Molphei
TPL B. Bongjang 3.00 3.00 3.00 3.00 Completed
23 Constn. of IVR from T. Yangnom Village to Maojang
TPL T. Yangnom 5.00 5.00 5.00 5.00 Completed
24 Constn. of IVR from Chongjang to Ch. Tengnoupal
TPL Chongjang 3.00 3.00 3.00 3.00 Completed
25 Constn of IVR from T. Khonomjang to T. Jangnom/ Khokahjang
TPL T. Khonomjang 5.00 5.00 5.00 5.00 Completed
26 Construction of IVR from S.M. Lhangjol to Maipi Mangsom
TPL Lhangjol 3.00 3.00 3.00 3.00 Completed
27 Construction of IVR from D. Mounaphai to border of New leikot
TPL D. Mounaphai
6.00 6.00 6.00 6.00 Completed
28 Construction of IVR from Govajang to Gamgilok stream
TPL Govajang 5.00 5.00 5.00 5.00 Completed
29 Constn. of IVR from Kwatha to kwatha khunou
TPL Kwatha 5.00 5.00 5.00 5.00 Completed
30 Construction of drain at Moreh Ward No.6
TPL Moreh Ward No.6
4.00 4.00 4.00 4.00 Completed
31 Construction of IVR from Saibol to Yangoupokpi through Tuisomjang Anchapao River 15 km.
TPL Saibol, Yangoupokpi
8.00 8.00 8.00 8.00 Completed
32 Construction of IVR from Choktong to Waksu
TPL Choktong 3.00 3.00 3.00 3.00 Completed
33 Construction of IVR from Chellep to Leitan
TPL Chellep 3.00 3.00 3.00 3.00 Completed
34 -do- Lokchao (New Champhai) Maipi Mongsom
TPL Maipi Mongsom
3.00 3.00 3.00 3.00 Completed
35 Construction of IVR from Kambang Khunou to Leibi
TPL Kambang Khunou
5.00 5.00 5.00 5.00 Completed
36 Construction of IVR from Kharaou Khunou to Durringphai
TPL Kharaou Khunou
6.98 6.98 6.98 6.98 Completed
37 Construction of IVR from Langkhongching to Lungwarkhong
TPL Langkhongching
3.00 3.00 3.00 3.00 Completed
38 Construction of IVR from Moirangthel to Khoirangalthel
TPL Moirangthel 6.00 6.00 6.00 6.00 Completed
Ring Wells39 Construction of Ring Wells at
Moreh Ward o 4 & 5TPL Moreh Ward
No. 4 & 54.00 4.00 4.00 4.00 Completed
40 Construction of ring well at Moreh Ward No. 1
TPL Moreh Ward No. 1
2.00 2.00 2.00 2.00 Completed
41 Construction of Bridge/Suspension Bridg over Tuikhulok stream at K. Moulshang village.
TPL K. Moulshang
5.00 5.00 5.00 5.00 Completed
Social SectorConstruction of Community Hall at:
42 Maipi Mangsong TPL Maipi Mangsong
5.00 5.00 5.00 5.00 Completed
43 L. Phunchong TPL L. Phunchong 5.00 5.00 5.00 5.00 Completed
44 ,-do- New Laikot TPL New Laikot 5.00 5.00 5.00 5.00 Completed
45 ,-do- Jangoupokpi TPL Jangoupokpi 5.00 5.00 5.00 5.00 Completed
46 ,-do- Muslim Basti Moreh TPL Muslim Basti Moreh
5.00 5.00 5.00 5.00 Completed
Market Shed
47 Constn. of Market Shed for Ima Keithel (Variety Vegetable Market side)
TPL Moreh 7.00 7.00 7.00 7.00 Completed
Rest House48 Construction of Public Rest House
at Kambang Khullen TPL Kambang
Khullen 6.00 6.00 6.00 6.00 Completed
49 Construction of Waiting Shed at Kambang Khullen
TPL Kambang Khullen
2.00 2.00 2.00 2.00 Completed
Construction of Workshed at:50 1. Leibi TPL Leibi 5.00 5.00 5.00 5.00 Completed
51 2. H. Mongjang TPL H. Mongjang 5.00 5.00 5.00 5.00 Completed
52 3. Yangoutubi TPL Yangoutubi 4.00 4.00 4.00 4.00 Completed
Total (Tengnoupal): 231.98 231.98 231.98 231.98II:CHAKPIKARONG BLOCK:A. Education Sector:Constrn./Extension of Classroom at:
53 a) K. Savumpa village CKG K. Savumpa 4.00 4.00 4.00 4.00 Completed
54 b) Songjang CKG Songjang 4.00 4.00 4.00 4.00 Completed
55 c) Sehlon CKG Sehlon 4.00 4.00 4.00 4.00 Completed
56 d) Khengjoy CKG Khengjoy 4.00 4.00 4.00 4.00 Completed
Construction of Playground at:57 a) Tuitung CKG Tuitung 2.00 2.00 2.00 2.00 Completed
58 b) P. Chehjang CKG P. Chehjang
2.00 2.00 2.00 2.00 Completed
59 c) Moltuk CKG Moltuk 3.00 3.00 3.00 3.00 Completed
60 d) S. Sijang CKG S.Sijang 3.00 3.00 3.00 3.00 Completed
B. Health Sector:
C. Agri. & Allied Sectors:1 Horticulture:
61 a) Estt. of Lemon and Orange Farm at Gelmol.
CKG Gelmol 3.00 3.00 3.00 3.00 Completed
62 b) Estt. of Orange and banana farm at Khengjoy.
CKG Khengjoy 3.00 3.00 3.00 3.00 Completed
63 c) Cultivation of Banana and lemon at Leisan
CKG Leisan 3.00 3.00 3.00 3.00 Completed
2 Construction of MI Dam/BS Dam and canal:
64 a) across Thelna Lok for K. Bethel Loukol.
CKG K. Bethel 5.00 5.00 5.00 5.00 Completed
65 b) across Twidel stream Joldam village.
CKG Joldam 5.00 5.00 5.00 5.00 Completed
66 c) across Shilok stream at Thingphai village
CKG Thingphai 5.00 5.00 5.00 5.00 Completed
67 d) across Gova lok stream at K, Selhei village.
CKG K. Selhei 5.00 5.00 5.00 5.00 Completed
68 e) across Khangtung lok stream at Pannajang village.
CKG Pannajang 4.00 4.00 4.00 4.00 Completed
69 f) across Kana River at the confluence of Thelna at Aigejang.
CKG Aigejang 5.00 5.00 5.00 5.00 Completed
70 g) across Sonbuk stream at Khunmunom village.
CKG Khunmunom
5.00 5.00 5.00 5.00 Completed
D.INFRASTRUCTURE:Construction of IVR from:
71 a) Chaljang to Chacham Lok. CKG Chaljang 5.00 5.00 5.00 5.00 Completed
72 b) T.S. Lajang to K. Savumpa village
CKG TS. Lajang & K, Savumpa
5.00 5.00 5.00 5.00 Completed
73 c) T.L. Maojang to Hollenjang. CKG TL. Maojang
3.00 3.00 3.00 3.00 Completed
74 d) Aibol Jankhomang to Twisa. CKG Aibol Jamkhomang
3.00 3.00 3.00 3.00 Completed
75 e) T. Monglen to Tuidam. CKG T.Monglen 8.00 8.00 8.00 8.00 Completed
76 f) SL. Changpol to Old Changpol CKG SL Changpol 6.00 6.00 6.00 6.00 Completed
77 g) Aisi to Gunjil CKG Aisi 5.00 5.00 5.00 5.00 Completed
78 h) T. Nampao to Beleijang CKG T Nampao 6.00 6.00 6.00 6.00 Completed
79 i) Heiphai to Jangnom CKG Heiphai 5.00 5.00 5.00 5.00 Completed
80 j) S. Bongjoy to Sejang Theose CKG S. Bongjoy 5.00 5.00 5.00 5.00 Completed
81 k) LH Jhangnomphai to Lajang village
CKG LH Jangnomphai
5.00 5.00 5.00 5.00 Completed
82 l) Khengjang to BRTF road towards Old Somtal.
CKG Khengjang 4.00 4.00 4.00 4.00 Completed
83 m) T. Tuivang to Namku stream towards Khumkot.
CKG T.Tuivang 4.00 4.00 4.00 4.00 Completed
84 n) Moldenom to Wailou CKG Moldenom 3.51 3.51 3.51 3.51 Completed
Construction of Bridge/Suspension bridge:
85 a) Repairing of Tuivang bridge at yangoulen.
CKG Yangoulen 3.00 3.00 3.00 3.00 Completed
86 b) Repairing of Govadung bridge at Molcham
CKG Molcham 2.00 2.00 2.00 2.00 Completed
87 c) Suspension bridge over Langkep river in between Gamphazol & Thingphai village.
CKG Gamphazol, Thingphai
8.00 8.00 8.00 8.00 Completed
88 d) Suspension bridge over Khoidung river in between S Lamphei and Tuidim village.
CKG S Lamphei, Tuidam
4.00 4.00 4.00 4.00 Completed
89 e) Repairing of of wooden bridge over Twito river at Molcham
CKG Molcham 2.00 2.00 2.00 2.00 Completed
a) Wailou CKG Wailou 4.00 4.00 4.00 4.00 Completed
90 b) Sailam CKG Sailam 4.00 4.00 4.00 4.00 Completed
91 c) LV Champhai CKG LV Champhai 4.00 4.00 4.00 4.00 Completed
92 d) T. Yangnom CKG T. Yangnom 4.00 4.00 4.00 4.00 Completed
Completed
a) Jangmol CKG Jangmol 4.00 4.00 4.00 4.00 Completed
E.SOCIAL SECTOR:194 a) Hengshi CKG Hengshi 5.00 5.00 5.00 5.00 Completed
95 b) PS Konjang CKG PS Konjang 5.00 5.00 5.00 5.00 Completed
96 c) Bolchang CKG Bolchang 5.00 5.00 5.00 5.00 Completed
97 d) Tuidam CKG Tuidam 5.00 5.00 5.00 5.00 Completed
98 e) T. Leiyang Khopi CKG T Leiyang Khopi
5.00 5.00 5.00 5.00 Completed
99 Construction of Community Hall at Nabil
CKG Nabil 5.00 5.00 5.00 5.00 Completed
100 Estt. of Rice Mill at the focal village of Changpol for the Cluster.
CKG Changpol 10.00 10.00 10.00 10.00 Completed
101 Construction of Playground at TS Lajang.
CKG TS Lajang 3.00 3.00 3.00 3.00 Completed
102 Construction of Market Shed at Changpol.
CKG Changpol 5.00 5.00 5.00 5.00 Completed
Total (Chakpikarong Block) 223.51 223.51 223.51 223.51Total:Chandel District 455.49 455.49 455.49 455.49
A Security related works
Construction of Community Hall at :
CLUSTER PROGRAMME
Construction of Workshed at:
93 Construction of Market shed at
i) Manipur PoliceI Ukhrul District
IA Chingai Block1 Construction of compund wall fencing
with one steel gate for Chingai Police , P.S.
Chingai Chingai 25.00 25.00 25.00 25.00 Completed
2 Construction of 20 SM barracks, Chingai, P.S.
Chingai Chingai 19.23 19.23 19.23 19.23 Completed
3 Construction of type three quarters, Chingai, P.S.
Chingai Chingai 13.34 13.34 13.34 13.34 Completed
IB Kasom Khullen Block
4 Construction of Kitchen-cum-Dining Hall and Toilet blocks at Kasom Khulen P.S.
Kasom Kl. Kasom Khulen
12.43 12.43 12.43 12.43 Completed
Total Police 70.00 70.00 70.00 70.00ii) Assam Rifles
Ukhrul DistrictKasom Khullen Block
5 Construction of 350 mtr retaining wall on landslide prone road strech near Khonglo Bridge on road Sorde to Kasong
Kasom Kl. Kasong 20.50 20.50 20.50 20.50 Completed
6 Construction of 400 mtr PCC rd on landslide prone stretch near Khonglo Brdige on rd Sorde-Kasong.
Kasom Kl. Kasong 5.00 5.00 5.00 5.00 Completed
Chandel District
Tengnoupal Block
7 Widening of road from Rilram centre to Saibol
TPL Rilram Centre and Saibol
34.50 34.50 34.50 34.50 Completed
Total (Assam Rifles) 60.00 60.00 60.00 60.00B. Training/ Monitoring, etc 5.70 5.70 5.70 5.70
Total:Ccpur,UKL&CDL, 1357.00 1357.00 1357.00 1357.00C. Addl for New Somtal Rehab(2nd Instal) 176.37 176.37 176.37 176.37
Grand Total:2008-09. 1533.37 1533.37 1533.37 1533.37
YEAR:2008-09
Block Village Approved Revised(if available)
1 2 3 4 5 6 7 8 9 10I : Ukhrul Blocka) Education
1 Constn. of kitchen and toilet for Govt. Hostel at Wino tang. (Hostel already constructed under BADP, 2007-08)
Ukhrul Ukhrul 3.00 3.00 3.00 3.00 Completed
2 Dev. Of playground at Nungshong Khullen.
Ukhrul Nungshong Kl. 2.00 2.00 2.00 2.00 Completed
3 Dev. Of playground at Somdal. Ukhrul Somdal 3.00 3.00 3.00 3.00 Completed
b) Health & sanitation4 Constn. of water tank at Chingsou. Ukhrul Chingshou 3.00 3.00 3.00 3.00 Completed
5 Constn. of water tank at Mapum. Ukhrul Mapum 3.00 3.00 3.00 3.00 Completed
6 Constn. of Public Convenience at Somdal
Ukhrul Somdal 4.44 4.44 4.44 4.44 Completed
7 Constn. of Dam and M.I. at Arthei Lok, Ukhrul.
Ukhrul Ukhrul 2.00 2.00 2.00 2.00 Completed
8 Land reclamation at Khangai Kulon Ngalu, Lunghar village.
Ukhrul Lunghar 4.00 4.00 4.00 4.00 Completed
9 Constn. of dam over Shongsho stream and canal of 2.5 Kms atLunghar.
Ukhrul Lunghar 4.00 4.00 4.00 4.00 Completed
10 Constn. of dam at Masoyam paddy field, Sihai Khullen..
Ukhrul Sihai Kl. 2.00 2.00 2.00 2.00 Completed
11 Constn. of cultivation tank cum fishery tank at Losunanangkho at K. Phungtha.
Ukhrul K. Phungthar 2.00 2.00 2.00 2.00 Completed
Amount utilised
Remarks
c) Agri & alleid sector including M.I.
BORDER AREA DEVELOPMENT PROGRAMME(BADP)COMPLETED SCHEMES/PROJECTS TAKEN UP UNDER BADP (YEAR-WISE/DISTRICT-WISE/BLOCK-WISE/DEPTT-WISE/SECTOR-WISE)
Name of the District:UKHRUL (Rs. in lakhs)Sl.No. Name of the schemes/projects Location Project Cost Amount
SanctionedAmount
released by MHA
12 Constn. of water harvesting pond at K. Wallely Atorakhong.
Ukhrul K. Wallely 4.00 4.00 4.00 4.00 Completed
13 Constn. of rain water harvest pond at Khongreira at Halang.
Ukhrul Halang 6.00 6.00 6.00 6.00 Completed
14 Tree plantation at community land, Khamasom.
Ukhrul Khamasom 4.00 4.00 4.00 4.00 Completed
15 Embankment of irrigation channel at Khawor paddy field at Kasomkong, Halang.
Ukhrul Halang 3.00 3.00 3.00 3.00 Completed
16 Constn. of river embankment at Tallui, Changkong.
Ukhrul Talloi 3.00 3.00 3.00 3.00 Completed
17 Constn. of RCC weir dam and MI channel over Mazik Lui at Shirui.
Ukhrul Shirui 3.00 3.00 3.00 3.00 Completed
18 Constn. of Check Dam at Shakan Sawa at Sihai Khullen
Ukhrul Shihai Kl 3.00 3.00 3.00 3.00 Completed
19 Constn. of Check Dam at Marangra Khannai Kong west at Langdang Khullen.
Ukhrul Langdang Kl 3.00 3.00 3.00 3.00 Completed
d) Infrastructure
20 Constn. of IVR from Zingsui to Roni. Ukhrul Zingsui, Roni 2.00 2.00 2.00 2.00 Completed
21 Constn. of Jeepable road from Shirui junction to Shirui Jr. H/S.
Ukhrul Shirui 2.00 2.00 2.00 2.00 Completed
22 Constn. of IVR from Lunghar to Shongcha.
Ukhrul Lunghar 4.00 4.00 4.00 4.00 Completed
23 Constn. of suspension bridge over Rantha river in between Sihai Khunou and Sihai Khulle.
Ukhrul Sihai Kn & Kl. 7.00 7.00 7.00 7.00 Completed
24 Shingling and drainage from Sashim to BRTF Camp with culverts.
Ukhrul Ukhrul 5.00 5.00 5.00 5.00 Completed
25 Constn. of IVR from Alungtang to Kashalazeng, Ukhrul.
Ukhrul Ukhrul 4.00 4.00 4.00 4.00 Completed
26 Impvt. of link road at Wino Tang, Ukhrul near TNL ground.
Ukhrul Ukhrul 3.00 3.00 3.00 3.00 Completed
27 Constn. of IVR Nungshong Khunou to Kamjong road junction.
Ukhrul Nungshong Kn.
3.00 3.00 3.00 3.00 Completed
28 Constn. of wooden bridge (Jeepable) over Chihui river at Choithar.
Ukhrul Choithar 3.00 3.00 3.00 3.00 Completed
29 Constn. of IVR from Nungshong Khullen to Luinaothuk Aze.
Ukhrul Nungshong Kl. 4.00 4.00 4.00 4.00 Completed
e) Social sector.
30 Constn. of community hall ar Rusheah (Ronshak) village
Ukhrul Ronshak 3.00 3.00 3.00 3.00 Completed
31 Constn. of Common shelter for Old age people at Tallui (Tolloi).
Ukhrul Tolloi 4.00 4.00 4.00 4.00 Completed
32 Constn. of Primary School Mid Day Meal store house at Phungreitang.
Ukhrul Ukhrul 6.00 6.00 6.00 6.00 Completed
33 Constn. of Public Guest House at Halang.
Ukhrul Halang 6.00 6.00 6.00 6.00 Completed
34 Constn. of Vocational Training Centre of TSL at Ukhrul.
Ukhrul Ukhrul 6.00 6.00 6.00 6.00 Completed
Total (Ukhrul Block) 123.44 123.44 123.44 123.44II : Chingai Block
a) Education35 Dev. Of playground at New
Kharasom.Chingai Kharasom 3.00 3.00 3.00 3.00 Completed
36 Dev. Of playground at Jessami Chingai Jessami 3.00 3.00 3.00 3.00 Completed37 Constn. of playground at Challou Chingai Challou 3.00 3.00 3.00 3.00 Completed38 Constn. of Public Convenience at
NungbiChingai Nungbi 3.00 3.00 3.00 3.00 Completed
39 Dev. Of playground at Kuirei village. Chingai Kuirei 2.00 2.00 2.00 2.00 Completed
b) Health & Sanitation
40 Constn. of water tank at Tusom Khullen.
Chingai Tusom Kl 3.00 3.00 3.00 3.00 Completed
41 Constn. of public toilet at Awang Kasom.
Chingai Awang Kasom 5.00 5.00 5.00 5.00 Completed
c) Agri & allied sector
42 Constn. of public irrigation (pick up weir) at Rachai Khullen.
Chingai Razai Kl 4.00 4.00 4.00 4.00 Completed
43 Constn. of public irrigation (pick up weir) at Zarui, New Tusom..
Chingai New Tusom 3.00 3.00 3.00 3.00 Completed
44 Constn. of river embankment at New Tusom.
Chingai New Tusom 3.00 3.00 3.00 3.00 Completed
45 Constn. of river embankment atTina river, Kharasom.
Chingai Kharasom 3.00 3.00 3.00 3.00 Completed
46 Constn. of irrigation canal at Atchazeda over Challou river.
Chingai Challou 3.00 3.00 3.00 3.00 Completed
47 Constn. of minor irrigation work (pucca canal) at Marem.
Chingai Marem 3.00 3.00 3.00 3.00 Completed
48 Constn. of fishery pond at Ngahui village
Chingai Ngahui 2.00 2.00 2.00 2.00 Completed
49 Constn. of river embenkment at Kuirei Ngahor Vaira river.
Chingai Kuirei 2.00 2.00 2.00 2.00 Completed
50 Constn. of CC Weir dam and M.I. canal at Lemor Lok, Kuirei.
Chingai Kuirei 2.00 2.00 2.00 2.00 Completed
51 Constn. of MI at NIRA river, Phungcham village.
Chingai Phungcham 2.00 2.00 2.00 2.00 Completed
52 Constn. of Minor Irrigation and Weir Dam at Kashim Ron, Ngahui village.
Chingai Ngahui 2.00 2.00 2.00 2.00 Completed
53 Constn. of CC Weir dam over Alozala river and M.I. channel.
Chingai Chingjaroi Kl 2.00 2.00 2.00 2.00 Completed
54 Embankment of irrigation channel at Chaoye Luisa Rangazak Kong, Lori Kajui.
Chingai Lori Kajui 3.00 3.00 3.00 3.00 Completed
55 Constn. of RCC weir dam over Aching Khaluirui Kong, Razai Khunou.
Chingai Razai Kn. 3.00 3.00 3.00 3.00 Completed
56 Constn. of RCC weir dam over Likhao river ti irrigate paddy field (for 70 families) at Challou village.
Chingai Challou 3.00 3.00 3.00 3.00 Completed
57 Constn. of dam and M.I. channel at Paoyilui, Chingjaroi C.V.
Chingai Chingjaroi CV. 3.00 3.00 3.00 3.00 Completed
58 Community Fishery farm at Davidla Nevia, Kuingai village.
Chingai Kuingai 3.00 3.00 3.00 3.00 Completed
59 Community Fishery farm at Areo Marakvan, Chingai village.
Chingai Chingai 3.00 3.00 3.00 3.00 Completed
d) Infrastructure
60 Constn. of IVR from Luireishimphung to BRTF road.
Chingai Luireishimphung
4.00 4.00 4.00 4.00 Completed
61 Constn. of IVR (road) from Nungbi Khullen to Wanja paddy field.
Chingai Nungbi Kl. 3.00 3.00 3.00 3.00 Completed
62 Impvt. of road from Namrei BRTF road to RKL complex.
Chingai Namrei 4.00 4.00 4.00 4.00 Completed
63 Constn. of wooden bridge over Yaorei river towards Salt well at Wahong.
Chingai Wahong 5.00 5.00 5.00 5.00 Completed
64 Constn. of circular road at Kuirei from Pukhri to Manarenra.
Chingai Kuirei 4.00 4.00 4.00 4.00 Completed
65 Constn. of IVR from Ngahui to Kamsamron river.
Chingai Ngahui 4.00 4.00 4.00 4.00 Completed
66 Constn. of suspension bridge over Challou river at Huishu.
Chingai Huishu 13.00 13.00 13.00 13.00 Completed
67 Constn. of IVR from Awang Kasom to Poi.
Chingai Awang Kasom 4.00 4.00 4.00 4.00 Completed
e) Social sector.
68 Constn. of community hall at Razai Khunou.
Chingai Razai Kn. 4.00 4.00 4.00 4.00 Completed
69 Constn. of Public Toilet of 4 units with water tank (Two Nos.) one at Headman;s Compound and one at Panraphei Market site.
Chingai Chingai 5.00 5.00 5.00 5.00 Completed
70 Constn. of community hall at Poi village.
Chingai Poi 4.97 4.97 4.97 4.97 Completed
71 Constn. of Public Guest House cum V.A. Court with Toilet facility at Marem Khullen.
Chingai Marem Kl. 5.00 5.00 5.00 5.00 Completed
72 Constn. of Guest House cum V.A. Court at Kuingai village.
Chingai Kuingai 4.00 4.00 4.00 4.00 Completed
Total (Chingai Block) 134.97 134.97 134.97 134.97
III : Kamjong Block
a) Education73 Constn. of Library Hall at Kamjong. Kamjong Kamjong 5.00 5.00 5.00 5.00 Completed
74 Constn. of primary school building (3 rooms) at Phange.
Kamjong Phange 6.00 6.00 6.00 6.00 Completed
75 Constn. of RCC school building (4 rooms) at Grihang.
Kamjong Grihang 8.00 8.00 8.00 8.00 Completed
76 Constn. of primary school building (4 rooms) at Kangpat Khunou
Kamjong Kangpat Kn. 8.00 8.00 8.00 8.00 Completed
77 Constn. of addl. Classrooms of Maokot Jr. H/S
Maokot 5.00 5.00 5.00 5.00 Completed
78 Dev. Of play field at Kachouphung (K) Kamjong Kachouphung K.
3.00 3.00 3.00 3.00 Completed
79 Dev. Of playground at Khoikai. Kamjong Khoikai 3.87 3.87 3.87 3.87 Completed
b) Health & sanitation
80 Constn. of watewr tank at Grihang. Kamjong Grihang 3.00 3.00 3.00 3.00 Completed
81 Constn. of watewr tank at Phange. Kamjong Phange 3.00 3.00 3.00 3.00 Completed
82 Constn. of water tank / reservoir with distribution system at Kholuishiya Kong, Khayang.
Kamjong Khayang 5.00 5.00 5.00 5.00 Completed
c) Agri & allied sector
83 Land reclamation and MI at Mapi wet land at Chatric Khullen.
Kamjong Chatric Kl 4.00 4.00 4.00 4.00 Completed
d) Infrastructure
84 Constn. of IVR from Kongkan to Namya river, Baily bridge and 5 slab culverts.
Kamjong Konhkan 10.00 10.00 10.00 10.00 Completed
85 Constn. of IVR from Kangpat to Zingshophai (Charo).
Kamjong Kangpat 4.00 4.00 4.00 4.00 Completed
86 Constn. of IVR from Grihang to Neinem Shimphung at Grihang.
Kamjong Grihang 10.00 10.00 10.00 10.00 Completed
87 Constn. of IVR from Pihang to Khoikai with one wooden bridge.
Kamjong Pihang, Khoikai
5.00 5.00 5.00 5.00 Completed
88 Constn. of wooden bridge (Jeepable) over Lusha Kong at Khayang.
Kamjong Khayang 3.00 3.00 3.00 3.00 Completed
89 Constn. of suspension bridge at kachouphung (K).
Kamjong Kachouphung K.
4.00 4.00 4.00 4.00 Completed
90 Constn. of IVR from Kachouphung (K) to Gampal.
Kamjong Kachouphung K.
4.00 4.00 4.00 4.00 Completed
91 Constn. of IVR from Chamu towards Kachouphung (T)
Kamjong Chamu 7.00 7.00 7.00 7.00 Completed
92 Constn. of IVR from Kachouphung (T) towards Khayang village.
Kamjong Kachouphung (T)
7.00 7.00 7.00 7.00 Completed
(e) Social Sector
93 Constn. of community hall at Chahong Phalung
Kamjong Chahong Phalung
5.00 5.00 5.00 5.00 Completed
94 Constn. of Guest House at Phungtha. Kamjong Phungtha 5.00 5.00 5.00 5.00 Completed
95 Constn. of community hall / Village Court at Roni village.
Kamjong Roni 5.00 5.00 5.00 5.00 Completed
96 Constn. of community hall at Chahong Khunou.
Kamjong Chahong Kn. 5.00 5.00 5.00 5.00 Completed
97 Constn. of Community Hall at Phaimol Kamjong Phaimol 5.00 5.00 5.00 5.00 Completed
Total (Kamjong Block) 132.87 132.87 132.87 132.87IV : Kasom Khullen Block
a) Education98 Constn. of Jr. H/S Hostel (7 rooms) at
Mawai.Kasom Kl. Mawai 10.00 10.00 10.00 10.00 Completed
99 Constn. of Hostel building at Nambashi Kl.
Kasom Kl. Nambashi Kl 10.00 10.00 10.00 10.00 Completed
b) Health/ Sanitation Completed
100 Constn. of one main water reservoir / tank at K. Ashang Khullen Aze.
Kasom Kl. K. Ashang Kl. Aze
4.00 4.00 4.00 4.00 Completed
c) Agri & allied sector
101 Medicinal & Herbal plantation Farm at Shimui Chihang, Mawai.
Kasom Kl. Mawai 3.00 3.00 3.00 3.00 Completed
d) Infrastructure
102 Constn. /Impvt. of IVR with shingling and drainage from Kasom Khunou to Khunthak village.
Kasom Kl. Kasom Kn. 5.00 5.00 5.00 5.00 Completed
103 Constn. of IVR from Mawai towards Tuyungbi.
Kasom Kl. Mawai 4.00 4.00 4.00 4.00 Completed
104 Constn. of IVR from K. Ashang Khullen to PWD junction.
Kasom Kl. K. Ashang Kl 4.00 4.00 4.00 4.00 Completed
105 Constn. of IVR from K. Ashang Khullen Aze to Tuidap B.P. No.8.PWD junction.
Kasom Kl. K. Ashang Kl Aze
10.00 10.00 10.00 10.00 Completed
106 Constn. of IVR from Lairam Khullen to Taret Lok.
Kasom Kl. Lairam Kl. 10.00 10.00 10.00 10.00 Completed
e) Social sector.
107 Constn. of community hall at Nambashi.
Kasom Kl. Nambashi 3.93 3.93 3.93 3.93 Completed
108 Constn. of community hall at K. Ashang Khullen Aze.
Kasom Kl. K. Ashang Kl Aze
4.00 4.00 4.00 4.00 Completed
109 Constn. of community hall at Nambashi Horton.
Kasom Kl. Nambashi Horton
4.00 4.00 4.00 4.00 Completed
110 Constn. of community Centre at Nambashi Khunou..
Kasom Kl. Nambashi Kn. 4.00 4.00 4.00 4.00 Completed
111 Constn. of community hall at Nambashi Valley.
Kasom Kl. Nambashi V.. 4.00 4.00 4.00 4.00 Completed
112 Constn. of Cultural hall at K. Ashang Khullen.
Kasom Kl. K. Ashang Kl. 4.00 4.00 4.00 4.00 Completed
Total (Kasom Kl. Block) 83.93 83.93 83.93 83.93
TOTAL:UKHRUL DISTRICT 475.21 475.21 475.21 475.21
YEAR:2008-09
Block Village Approved Revised(if available)
1 2 3 4 5 6 7 8 9 10
A Security related worksi) Manipur Police
I Ukhrul DistrictIA Chingai Block
1 Construction of compund wall fencing with one steel gate for Chingai Police , P.S.
Chingai Chingai 25.00 25.00 25.00 25.00 Completed
2 Construction of 20 SM barracks, Chingai, P.S. Chingai Chingai 19.23 19.23 19.23 19.23 Completed
3 Construction of type three quarters, Chingai, P.S. Chingai Chingai 13.34 13.34 13.34 13.34 Completed
IB Kasom Khullen Block
4 Construction of Kitchen-cum-Dining Hall and Toilet blocks at Kasom Khulen P.S.
Kasom Kl. Kasom Khulen 12.43 12.43 12.43 12.43 Completed
Total Police 70.00 70.00 70.00 70.00ii) Assam Rifles
Ukhrul DistrictKasom Khullen Block
5 Construction of 350 mtr retaining wall on landslide prone road strech near Khonglo Bridge on road Sorde to Kasong
Kasom Kl. Kasong 20.50 20.50 20.50 20.50 Completed
6 Construction of 400 mtr PCC rd on landslide prone stretch near Khonglo Brdige on rd Sorde-Kasong.
Kasom Kl. Kasong 5.00 5.00 5.00 5.00 Completed
Chandel District
Tengnoupal Block
7 Widening of road from Rilram centre to Saibol TPL Rilram Centre and Saibol
34.50 34.50 34.50 34.50 Completed
Total (Assam Rifles) 60.00 60.00 60.00 60.00
Location Project Cost Amount Sanctioned
Amount released by MHA
Amount utilised
Remarks
BORDER AREA DEVELOPMENT PROGRAMME(BADP)COMPLETED SCHEMES/PROJECTS TAKEN UP UNDER BADP (YEAR-WISE/DISTRICT-WISE/BLOCK-WISE/DEPTT-WISE/SECTOR-WISE)
SECURITY RELATED WORK (Rs. in lakhs)Sl.No. Name of the schemes/projects