OUTLINEOUTLINE
THREE INTEGRAL COMPONENTTHREE INTEGRAL COMPONENT
TSUNAMI WARNING SYSTEM IN TSUNAMI WARNING SYSTEM IN INDONESIAINDONESIA
ALERT DISSEMINATIONALERT DISSEMINATION
PROGRESS REPORTPROGRESS REPORT
The Three Integral Components Tsunami Warning and Mitigation System
TECHNICAL / OPERATIONAL WORKSTECHNICAL / OPERATIONAL WORKS BMG, BAKOSURTANAL, BPPT, DJGSMBMG, BAKOSURTANAL, BPPT, DJGSMLIPI, KOMINFO, POLICE, LOCAL GOV.LIPI, KOMINFO, POLICE, LOCAL GOV.
CAPACITY CAPACITY BUILDINGBUILDING
LIPI, BPPT, ITBLIPI, BPPT, ITB
RISTEK, BMGRISTEK, BMG
GLOBALGLOBAL REGIONALREGIONAL NATIONALNATIONAL
War
nin
g
Guid
ance
Mitigation
Hazard
Assessm
ent
Source: Int’l Tsunami Information Center; March 2005
I
II
BAPPENAS
MITIGATION - MITIGATION - REHABILITATIONREHABILITATION
EMERGENCY RESPONSEEMERGENCY RESPONSEBAKORNAS PB, BAKORNAS PB,
MINISTRIES, LOCAL MINISTRIES, LOCAL GOVERNMENTGOVERNMENT
III
IPROJECT COMPONENT : TECHNICAL / OPERATIONAL WORKS
• BMG, Meteorological and Geophysical Agency
• BAKOSURTANAL, National Coordinating Agency for Survey and Mapping
• BPPT, Agency for Assessment and Application Technology
• DJ_GSM, Geology & Mineral Resources
• KOMINFO Communication & Information
• LIPI, Indonesian Science Institute
1. Establishment of Monitoring System
2. Data Processing and Analysis
3. Result Dissemination
- Seismograph
- Accelerograph
- Tide Gauge
- GPS Network
- DART Buoys
EARTHQUAKE MONITORING
SEA MONITORING
CRUSTAL DEFORMATION
IIPROJECT COMPONENT : ASSESSMENT/
CAPACITY BUILDING
1. Modeling
2. Simulation
3. Workshop/ Symposium
4. Training
5. Education Program
MINISTRY OF RESEARCH AND TECHNOLOGY
• INDONESIAN SCIENCE INSTITUTE
• NATIONAL RESEARCH INSTITUTIONS
• UNIVERSITIES
III
1. a. Transportation b. Mobilization2. a. Roads b. Bridges c. Social Buildings
d. Public Building3. School Buildings4. Hospitals
DEPT. OF TRANSPORTATION
1. Nat’l Dev. Planning Agency
2. Nat’l Coordinating Board for Disaster Managemen
DEPT. OF PUBLIC WORK
DEPT. OF COMM. & INFO
DEPT. OF EDUCATION
DEPT. OF HEALTH
NATIONAL EFFORT ON REHABILITATION
& RECONSTRUCTION
PROJECT COMPONENT : MITIGATION/ REHABILITATION/
EMERGENCY RESPONSE
III
1. a. Transportation b. Mobilization2. a. Road, Bridges b. Tent c. Knock-Down House3. Food Storage4. Education5. Health and Sanitary6. Security and Safety
DEPT. OF TRANSPORTATION
BAKORNAS ; SARNAS
NAT’L DEV. PLANNING AGENCY
DEPT. OF PUBLIC WORK
KEM. KESRA &BULOG
DEPT. OF EDUCATION
DEPT. OF HEALTH
DEPT. OF DEFENSE
ARMY ; POLICE
NATIONAL EFFORT ON MITIGATION AND EMERGENCY RESPON
PROJECT COMPONENT : MITIGATION/ REHABILITATION
EMERGENCY RESPONSE
TECHNICAL WORK
SATLAKSATLAK
INSTITUTIONS ENVOLVED IN THE TSUNAMI WARNING AND MITIGATION SYSTEM
LIPILIPI
BAKOBAKO
BPPTBPPTGSMGSM
KRTKRTBMGBMG
BAKORNAS PBPBAKORNAS PBP
DAGRIDAGRI KESKES
LHLH
BUPBUP
GUBGUB
SOSSOS
POLRIPOLRI TNITNIESDMESDM
PUPU
KOMINFOKOMINFO
KEUKEU
SATKORLAKSATKORLAK
HUBHUB
DEPTRES. AGENCY
NGOs
The CenterThe Center(BMG)(BMG)
LIPILIPI
LIPI, National Research Institute, Universities
Non Departemental Research Agencies
International scientific
institutions
BMGBMG
NON DEPTRES. AGENCY UNIVERSITIES BPPT
CAPACITY BUILDING
KOMINFOKOMINFO
REHABILITATION, MITIGATION,EMERGENCY RESPONSE
ESTABLISHMENT OF EARTHQUAKE INFORMATION AND
TSUNAMI WARNING CENTER
EARTHQUAKE INFORMATION AND TSUNAMI WARNING SYSTEM
160 Broad band Seismographs160 Broad band Seismographs
500 Accelerographs500 Accelerographs
120 Tide Gauges120 Tide Gauges
15 DART buoys type15 DART buoys type
1 National Processing Center1 National Processing Center
10 Regional Processing Centers10 Regional Processing Centers
BMGBMG
Indonesia Earthquake Information and Tsunami Warning Center (LONG TERM / START
2006)
-160 Seismic Sensors
- Distance Between Sensors +/- 100 km
- 10 RC and 1 NC
- Result ± 5 menit
REG. CENTER 2
REG. CENTER 7
REG. CENTER 8
REG. CENTER 9
REG. CENTER 4
REG. CENTER 10
REG. CENTER 6
REG. CENTER 1
NAT’L. NAT’L. CENTERCENTER
REG. CENTER 3
REG. CENTER 5
11
22
33
44
55
Real Time DateReal Time DateFor Updating For Updating
1010
3030
6060
Tsunami Tsunami Confirmation or Cancelation Confirmation or Cancelation
• Seis. and Accelerograph : Record Seis. and Accelerograph : Record
• Alarm TriggeredAlarm Triggered
• Automatic ProcessingAutomatic Processing
ProcessProcess Information :Information :•Epicenter Epicenter •Magnitude Magnitude •Depth ;Origin TimeDepth ;Origin Time
• Alarm at Nat’l EITWCAlarm at Nat’l EITWC
• Automatic ProcessingAutomatic Processing
REGIONAL REGIONAL TSUNAMI TSUNAMI WARNINGWARNING
Interactive Interactive AnalysisAnalysis
DATA BASE
• Historical• Simulation
AUTOMATIC PROCESSING/AUTOMATIC PROCESSING/ INTERACTIVE PROCESSINGINTERACTIVE PROCESSING
BUOYS – TIDE GAUGE’S BUOYS – TIDE GAUGE’S MONITORINGMONITORING
For For ConfirmationConfirmation
WARNING !!WARNING !!
NAT’L TSUNAMINAT’L TSUNAMI
EarthquakeOccurence
Processing Time Frame(Minute 1 – Minute 10)
DATA BASE
• Historical• Simulation
Time (in Minutes) Required for Processing Warning Information
Minute 1: Signal recorded at ≥ 5 Stations
Minute 2: Processing
Minute 3: EQ Parameters (Origin Time; Epicenter; Depth; Magnitude)Minute 4: - Database is
activated - Interactive AnalysisMinute 5: Warning !!
Minute 10: Warning From Nat’l Center to Wider Region/ International
PROPOSED ACCELEROGRAPH PROPOSED ACCELEROGRAPH BMGBMG
Existing and Proposed Tide Gauge Network
SOURCE : BAKOSURTANAL
Pantoloan
Toli Toli
Tarempa
TAREMPA
Analog (35)Digital (25)
Proposed new sites for Tsunami Monitoring (60)
NOAA/USA Proposal
LEGEND
DART BUOYS NETWORK (PLANNED) BMGBMG
SOURCE : BPPT
EXISTING AND PROPOSED GPS STATIONS
LEGENDGPS Continuous Station (9) (status 2005)Continuous GPS on Tide Gauge (National Plan)
Existing
End 2005 Beginning 2006
I. Observation System
• Seismograph BB /SP(BMG) 8/31 25/31 25 (existing) + 135 (new) = 160
Real Time SP 27 27
Real Time BB 8 25 160
• Accelerograph (BMG) 9 9 (existing) + 20 (new) = 29 29 (existing) + 471 (new) = 500
• GPS (LIPI-Bakosurtanal) 9 9 (existing) + 0 (new) = 9 9 (existing) ) + 23 (new) = 42
• Tide Gauge (Bakosurtanal) 60 60 (existing) + 20 (new) = 80 80 (existing) + 40 (new) = 120
• Buoy (BPPT) 0 2 15
II. Regional & National Center
• Regional 5 Regions(manual)
5 Regions(otomatis 3)
10 Regions
• National 1 Nat’l Ctr(Automatic
)
1 Nat’l Center(Automatic ,
Interaktif)
1 Nat’l Center
III. Processing System Semi Manual
Otomatis( 3 RC + 1 NC)
Otomatis, Interaktif
( 3 RC/ Existing + 1 NC/Existing + 7 RC/
New
IV. Time for Processing 30 Minutes
15 Minutes 5 Minutes
I
IIIII
IVV
Regionalism Tsunami Warning Center /End of 2005( 5 Regions )
BMGBMG
: Broadband Seismograph: Digital Seismograph: Accelerograph. Tide Gauge
SHORT TERM (END 2005)SHORT TERM (END 2005)
COMMITMENT ACHIEVED UP TO PRESENT
China China : 10 seismo + accelero: 10 seismo + accelero GermanyGermany : 21 seismo + accelero: 21 seismo + accelero NIED-JpnNIED-Jpn : 15 seismo + accelero: 15 seismo + accelero CTBTO CTBTO : 5 seismo + 1 UCSD: 5 seismo + 1 UCSD GOI GOI : 14 seismo + accelero: 14 seismo + accelero France France : 2 TREMORS + upgrade: 2 TREMORS + upgrade
BMGBMG
PLANNED EARTHQUAKE INFORMATION AND TSUNAMI WARNING SYSTEM
(COMMITTED)
67 broad band seismographs67 broad band seismographs 77 accelerographs77 accelerographs 15 tide gauges15 tide gauges 10 DART buoys type10 DART buoys type 1 national processing Center1 national processing Center 3 regional Processing Centers3 regional Processing Centers
BMGBMG
PLANNED SEISMIC STATIONS PLANNED SEISMIC STATIONS
(COMMITTED)(COMMITTED)BMGBMG
RSC 1
RSC 6
RSC 4
RSC 2
RSC 9
RSC 7RSC 3
RSC 10
RSC 8
RSC 5
NSCNSC
China
Germany
Japan
CTBTO
Indonesia
SMS BROADCAST
SPECIAL FAX
MGA STATION > 55 LOCATION
• PRESIDENT
• VICE PRESIDENT
LEGEND
PLANNED
EXISTING/ MGA
HANDPHONE
TELEPHONE
TV STATION
•BAKORNAS PBP•LOCAL GOVERNMENT•RELATED INSTITUTIONS
VPNVPN
INTERNET
RF
RF
PLANNED
SEISMO SERVER
TELEPHONE
TERMINAL
SEISMO SERVER
TSUNAMI SERVER
ROUTER
GTS
INTERNET
INT’L EQ INSTITUTIONS• USGS – USA• JMA – JAPAN• IDC – UK• PTWC - USA
ROUTER
WEB SERVE
R
ROUTER
VSAT LINK
VSAT LINK RF RF
SEISMOMETER
EQ MONITORING SENSORS
2
4
1
5
5
3
3
3
2
RF RF
RF
RF
COASTAL AREA OR VULNERABLE
AREA
ALARM
ALARM
VIDEO
RADIO
PAGER
PAGER
VIDEO
RADIO
6
DIAGRAM OF DATA – INFORMATION FLOW, FROM BMG TO THE LOCAL CITIZEN
PLANNED
PLANNED
REAL TIME• TIDE GAUGE (20)• GPS
REAL TIME •SEISMOMETER (BROADBAND)- (20)• ACCELEROGRAPH (20)
VSAT IP
HP
HP
RADIO STA.
MGA JAKARTA
(27)
MGA REGIONAL CENTER I - V
3-D Simulation of Tsunami’s effect3-D Simulation of Tsunami’s effect
Source: LANDSAT ETMSource: LANDSAT ETM
BMGBMG
BMGBMG
Nat’l / Regional Center
SIRENS FOR BANDA ACEH (PROPOSED)
BMGBMG
SIRENS FOR BANDA ACEH (PROPOSED)
TWS PROGRESS UP TO PRESENTTWS PROGRESS UP TO PRESENT
INSTALL 8 BB SEISMIC SENSORS REAL TIME TO BMG HQ
REAL TIME EARTHQUAKE PROCESSING SYSTEM IN BMG HQ (RESULT EQ LOCATION LESS THAN 15 MINUTES)
AUTOMATIC EQ INFO VIA SMS, EMAIL, WEB SITE
BMGBMG
Email - SMS auto sendingEmail - SMS auto sending
BMGSismic Data Processing
AEIC SMS SERVER
BMG EMAIL SERVER
AEIC EMAIL SERVER
BMG SMS SERVER
List Mobile62815…62816…62813….
Earthquake information
Raw data
List Email:ews@ristek.go.idmanaek@inovasi.lipi.go.idbalai5@bmg.go.id
List Email:nqdung@jgp.ncst.ac.vnBurin_tmd@yahoo.comYong_miov_koon@nea.gov.sg
List Mobile:60…62…49…
BMGBMG
NATIONAL SEISMOLOGICAL CENTER AND TSUNAMI
WARNING SYSTEM
Brunei D.
Cambodia
Lao PDR
Malaysia
Myanmar
Philippines
Singapore
Thailand
Indonesia
SRI LANKA
JAPAN
USGS
PAKISTAN
BANGLADESH
INDIA
AUSTRALIA
GERMANY
CHINA
Data ExchangeInformation Exchange
Trainingetc
TelephoneFacsimile
GTS
Internet, SMS
Vsat
TELECOMMUNICATIONS SYSTEM
ACTIVITIES
EXTENTION OF INFORMATION
DISSEMINATION
AEIC
Website
etc
PTWC
ISC
Vietnam
Communications system diagram
BMGBMG
TO BE CLARIFIED
How to Integrate All Seismic Data ?How to Integrate All Seismic Data ?
How to Process and Integrate : Sea Surface and How to Process and Integrate : Sea Surface and Sea Bottom Pressure to The Interactive Mode ?Sea Bottom Pressure to The Interactive Mode ?
How to Integrate The Pre Calculated and How to Integrate The Pre Calculated and Historical Data (from Database), to Automatic Historical Data (from Database), to Automatic Processing?Processing?
How to Disseminate The Warningto The Coastal How to Disseminate The Warningto The Coastal People?People?
BMGBMG
BMGBMG