Moisture resistant sealTo keep the moisture fromconcrete entering the basement

Structural Screed topping 75mmwith high performance stip resistantfloor finish

Drainage layer

Reinforcement concrete foundationdetail with a concrete floor toppingof 150mm

DPC

Xtratherm rigid insulationupstand

Foamglas Perisul structuralinsulation

Concrete Cast In Situ Column CorbelSteel dowel bars cast into the column corbel tosupport the floor aboveTo engineers specifications

Blockwork wall construction with aninner cavity layer of 60mmBlockwork (100mm x 215mm)

Drainage layer

Pervious pavingSloping ratio level 1 in20

High performance slip resistant floor finish

Gyproc plasterboard12.5mm with a 30 minutefire protection option

Vapour barrier should becontinous and sealed atcorners

Isover mineral insulation(Metsec system with steelchannels)

Xtratherm rigid insulation installed toavoid thermal bridging once the stonecladding attachment joints will beinstalledSupported by C channels

150

Structural Screed Topping 75mm

Concrete Hollowcore Floor Slab 150mm

Isover mineral wool insulationwith zee steel channel support

Cement fiberboard (moistureresistant) 13mm

Sand Layer (Hardcore) 50mm

Geotextile layer

Drainage pump

Area for basement drainage with sump pump

Rigid insulation floorbase detail

DPM

Screed topping

Drainage layer

Reinforcement concretefoundation detail

DPC

Xtratherm rigid insulationupstand

Foamglas Perisul structuralinsulation

Concrete Cast In Situ Column CorbelSteel dowel bars cast into the column corbel tosupport the floor aboveTo engineers specifications

High performance slip resistant floor finish

Car Park Ramp (1:10)Concrete Construction

Aluminium expansion joint cover

Basement Drainage with pump

400

2800

Height Warning Sign

High performance, slip resistant floor finishCurved at edges

Structural screed toppoing 75mm

Concrete Hollowcore floor slab 150mm

Isover mineral wool insulation with zeesteel channels acting as support

Cement fiberboard 13mm fixed to theabove structure

Light Fixing within the cavity

Metsec wall system with Isover mineral insulation

Xtratherm rigid insulation with c channels andstonelite rainscreen cladding system on theexterior

Steel capping construction supported by a concretecolumn, with external lighting fixed within the resets

Scale

LECTURER

Drawn by

Date

Project number

Institute of Technology CarlowBSc. in Architectural Technology

Year 3 2015-2016

1 : 10

25/0

4/2

016 1

7:4

4:5

6

Basement Construction Detail

3

Primary Care Center

April 2016

Rasmante Sedleckaite

Dan O'Sullivan/ Noel Dunne/Mark Duffy

A118

1 : 10

Basement Construction Detail1

1 : 10

Basement Entrance Detail2

Basement Isometric View3