BA88_P2010_ P2011pm Check List

Post on 13-Jan-2016

214 views 0 download

description

pm Check list

Transcript of BA88_P2010_ P2011pm Check List

PREVENTIVE MAINTENANCE CHECKLIST FOR BA88 INSTRUMENT

CUSTOMER'S NAME & ADDRESS:______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

NO DESCRIPTION OK

12 Take a printout of the setup

4

5

67 Clean the filters

89 Check the other voltages

10 Carry out pump calibration11 Perform Zero Dirft test13 Perform filter check test

1415 Run the controls.16 Run the samples.

Engineer's remarks:______________________________________________________________________ ________________________________________________________________________________________

(Put √ in OK or Not OK Column. Put remark if it is Not OK)

Discuss with the customer about the performance of the system

Check the tubings and if necessary replace them

Clean the lamp and check the lamp voltage if necessary replace it.

Clean the complete optical path including the lenses

Check for the free movement of filter wheel,chopper wheel and peristaltic pump

Check the temperature values, if necessary do temp. calibration.

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Customer's remarks:_________________________________________________________________________ ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Engineer's Name:____________________

Signature:__________________________

PREVENTIVE MAINTENANCE CHECKLIST FOR BA88 INSTRUMENT p-2011

DATE: ______________________________________________________________________________________________________________________ MODEL NAME:______________________ __________________________________________________________________________________________ SR.NO:______________________________________________________________________________________________________________________ PM NO: 1 2 3

NOT OK CORRECTIVE ACTION / REMARKS

Engineer's remarks:______________________________________________________________________ ________________________________________________________________________________________

in OK or Not OK Column. Put remark if it is Not OK)

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Customer's remarks:_________________________________________________________________________ ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Customer's Name:______________________________

Signature:_____________________________________

Customer's remarks:_________________________________________________________________________