ARCH 1290 ARCHITECTURAL CADD ARCH 1200 ARCHITECTURAL DRAWING II

Post on 27-Jan-2016

45 views 0 download

Tags:

description

ARCH 1290 ARCHITECTURAL CADD ARCH 1200 ARCHITECTURAL DRAWING II. PROFESSOR PAUL KING It ’ s time for Research!. SLIDE 2 – TEAM 5 Profile. What attracts you to the study of Architecture? - PowerPoint PPT Presentation

Transcript of ARCH 1290 ARCHITECTURAL CADD ARCH 1200 ARCHITECTURAL DRAWING II

ARCH 1290 A

RCHITEC

TURAL

CADD

ARCH 1200 A

RCHITEC

TURAL

DRAWIN

G II

PROFESS

OR PAUL

KING

It’s

time

for R

esea

rch!

SLIDE 2 – TEAM 5 Profile

What attracts you to the study of Architecture?

“I view architecture as a work of art with space of opportunity. It’s a field where I can make someone happy by my thoughts to reality .”  Syndi Wilkinson

“I enjoy using photography to capture the different elements of architecture.” Nita Velasquez

“Architecture is a passion where I seek beauty, space and functionality. I enjoy brainstorming my ideas using photography, design, painting and build.” Debora Tannenbaum

“Architecture is a field where I can express my creativity with rules but no guidelines.” Jeffrey Rodriguez

 syndi W

ilkin

son

Information

New Castle Fieldhouse

•The New Castle Fieldhouse is a 9,325-seat multi-purpose arena in New Castle, Indiana, USA. It is home to the New Castle Chrysler High School Trojans basketball team. Built in 1959, it is the largest high school basketball gym in the world.

•The New Castle Fieldhouse was built by the Ralph Hunnicutt & Sons Construction Company. The main basketball is a "sunken" floor, meaning that one enters the building at the top of the bleachers and the playing floor is below. The distance from the level where one enters to the peak of the roof is the same as the distance from where one enters to the playing floor.

• The New Castle Fieldhouse gym is the largest high school basketball gym in the world IT hosts  high school volleyball games, wrestling meets, gymnastics competitions, and gym classes during the school day. The top of the Fieldhouse is bordered by a 1/7 of a mile rubber track. The track is used for gym classes as well as being open to the public in the mornings, evenings and during lunch period.

program

Lighting

Lighting: •With few exceptions, metal halide high bay and low bay lights are the best luminaires to use for gymnasium lighting.  They are common in school gyms, clubs, and recreational basketball courts and provide a robust source of white light with a high CRI

long span steel trusses for roof

framing members

Long-span & structures

http://www.rlldesign.com/gymnasium-lighting-a-214.html

http://www.enotes.com/topic/New_Castle_Fieldhouse

http://www.usatoday.com/sports/preps/basketball/2004-02-25-ten-great-hoops-newcastle_x.htm

Credits

Sites

Nita V

elas

quez

Information

Grace Church School Gymnasium 

•Location: 86 4th Ave New York, NY 10003•School: Grades K-8 and 9•Gym Location: Underground, adjacent to James Renwick’s landmark gothic revival church•Architect: Alspector Architecture LLC

Gym Accommodates;

•Basketball

•Volleyball

•Soccer

•Rock climbing

•School events/parties

•It also hosts events from other schools and colleges

program

Aesthetics & Function

• The Gym has both interior and exterior windows and a stair way to the ground level

Lighting & Ventilation

Lighting: This Gym uses; •ceiling lights •natural light - via a series of large exterior and interior windows

Ventilation: There are large circular vents and smaller air units located on the south wall

Long-span & structure

Required underpinning of the adjoining church and loft building

Has an Intensive green roof

Construction assembly

Roof: Intensive green roof •Street trees •Garden•Playground

Construction: •Required underpinning of the adjoining church and loft building•Extension under the public sidewalk •Within 20 feet of the Broadway subway tunnel•site-specific vibration monitoring program was prepared due to the site’s close proximity to the City’s subway line

Extra: Underpinning

Underpinning: The process of strengthening the foundation of an existing building or structure.

Reasons for underpinning:•Foundation is weak or unstable•Construction that requires the excavation of the soil that supports the foundation

1. http://www.gcschool.org/about-gcs/history-and-timeline/index.aspx

2. http://www.alspectorarchitecture.com/gcs.htm

3. http://www.schooldesigner.com/Architects/Alspector-Architecture-LLC/Elements/Gym-Under-Ground.asp

4. http://www.structuretone.com/ST/index.nsf/O/GraceChurchSchool?opendocument&Sectors=Education~Education

5. http://www.foundationsystemsrepair.com/foundation-underpinning.html

6. http://www.google.com/imgres?q=underpinning&um=1&hl=en&sa=N&biw=1335&bih=784&tbm=isch&tbnid=B_uA0yluh1koHM:&imgrefurl=http://www.foundationrepair.org/underpinning&docid=0ZNsTRWeBDKtcM&w=645&h=443&ei=teiRTuu1Bufl0QGw__Ai&zoom=1

7. http://en.wikipedia.org/wiki/Main_Page

Credits

Sites

Debor

a Ta

nnenbau

m

BMCC-Borough of Manhattan Community College/CUNY

Location: 199 Chambers St. New York, NY 10007

Two Year College

Gym Location: Ground 2, adjacent to Harrison Street, Tribeca

Administration and Planning: Vice-President Scott Anderson

INFORMATION

FIT-FASHION INSTITUTE OF TECHNOLOGY/SUNY

Location: Seventh Avenue at West 27th Street New York, NY 10001

Two and Four Year College

Gym Location: Underground, B Building level SC Chelsea area

INFORMATION

BMCC/CUNY PROGRAM

RECREATION FACILITY INCLUDES:

BASKETBALL

WEIGHT ROOM

HANDBALL

BOWLING

BASEBALL

SOCCER’

VOLLEYBALL

SPORTS TEM COMPETE IN BOTH:

CUNY ATHLETIC SYSTEM, AND

LOCAL NCAA COLLEGIATE SPORTS SYSTEM

FIT/SUNY PROGRAM

RECREATION FACILITY INCLUDES:

TRACK AND FIELDDANCESOCCERTENNISVOLLEYBALL

INTERCOLLEGIATE TEAMS IN TENNIS, CROSS-COUNTRY, HALF-MARATHON, TRACK AND FIELD, DANCE, WOMEN’S VOLLEYBALL

FIT TEAMS COMPETE AGAINST OTHER SCHOOLS IN REGION XV OF THE NATIONAL JUNIOR COLLEGE ATHLETIC ASSOCIATION

PROGRAM

MULTI-USE SPACE: 103’ X 143’

PERIMETER CURTAINS HANG DIVIDING NETS ABOUT 12’

ABOVE THE FLOOR HOME AND VISITORS SEATING

AREAS WALLS WITH CUSHIONS CARDIO / WARM UP AREA AND

EQUIPMENT STANDARD GALVANIZED STEEL PIPE

POST WITH STELL CLAMP FOR HANG BASKETS AND PORTABLE HYDRAULIC GOAL

MOVABLE WALL ASSEMBLY FOR COURT CONVERSION

FLOOR EXERCISE MAT AREA FLOORING OVER WOOD

AESTHETICS & FUNCTION

VENTILATION

CEILING LIGHTS

NATURAL LIGHT – EXTERNAL WINDOWS

LONG-SPAN STRUCTURE

TYPE OF ROOF AND SUPPORT

CONSTRUCTION ASSEMBLY

FLOOR STRUCTURE ASSEMBLY: 1 OR 2 WAY CONCRETE SLAB OR FOR HEAVIER 2-WAY CONCRETE SLAB

ROOF STRUCRURE ASSEMBLY: CONCRETE FLAT SLAB STEEL TRUS 1 OR 2 WAY CONCRETE SLAB

EXTERIOR WALL ASSEMBLY: CMU AND BRICK VENEER (INSULATED) CMU INSULATED

GYMNASIUMS DISTRIBUTED LIVE LOADS: 100 PSF LONG SPAN SYSTEM STEEL TRUSS FLAT SURFACE SEISMIC – RESISTANT DESIGN MASONRY

REFERENCE

www.cuny.eduwww.bmcc.cuny.edu

www.suny.eduwww.fitnyc.edu

Allen and Iano. 2009. “Fundamentals of Building Construction- Materials and Methods". John Wiley &Sons. Hoboken, NJ

Jeffre

y Rod

riguez

Carlsbad High School Gymnasium

Location:Carlsbad, CaliforniaArchitect Team:Principal-In-Charge: Ralph Roesling

Manager: Chuck forteProject Architect: Rommel OlaesEngineer:Civil: Flores Lund ConsultantsStructural: Stedman & Dyson Structural Engineers

Mechanical: E/C EngineeringElectrical: Semenza Engineering

Site Info. & Credits

Program

Capacity: Designed to fit up to 2,ooo people

Space size: 28,300 square feet

Space: Full size basketball court Two cross courts Training room Locker rooms Offices Storage areas

Two types of CMU.

Steel beams & Columns

Windows at entrance of the building

Two stairways

Aesthetics & Function

Lighting & Ventilation

Ventilation Lighting Natural Lighting

Long-Span: Steel trussesCurved Steel beams

Long-Span & Structure

•Roof Structure:

A. Deep cellular steel deck

B. Standing seam metal (Absorbs less heat)

A.

B.

Construction Assembly

• Wall:•Load-bearing concrete masonry

Sources

http://www.rntarchitects.com/design/ProjectPdfs/k12/CarlsbadHighSchoolGymnasium.pdf