Post on 22-Mar-2018
An Introduction to HEDCO Company
Hampa Energy Engineering & Design Company
(April 2014)
www.hedcoint.com 1
HEDCO at a Glance
HEDCO was founded with collaboration of HAMPA Engineering Corporation and a group of highly experienced and innovative engineers working extensively in oil, gas and petrochemical projects as EPC project managers and senior engineers in different disciplines.
With the available experience, HEDCO and its main shareholder (HAMPA), which has strong background in the field of construction of petrochemical plants, are quite capable to handle large scale EPC projects.
HEDCO is certified as Level 1 Consulting company by MPO of Iran in the field of Oil, Gas & Petrochemical.
www.hedcoint.com 2
HEDCO Quality System
Compliance of HEDCO quality management system with the requirements of ISO-9001, ISO-14001, ISO-18001 & ISO-29001 have been certified by TÜV Nord CERT GmbH.
www.hedcoint.com 3
HEDCO Organization
HEDCO has a work oriented organization consisting of different directorates: Marketing & Business Development Financing Information & Communication Technology (ICT) Projects
Project Management Planning Procurement QA/QC HSE
Engineering Process Piping Civil Mechanical Machinery Electrical Instrumentation
Site Supervision
www.hedcoint.com 4
HEDCO Field of ActivitiesBased on the priorities and according to the articles written in establishment announcement, the company's field of activities is the industrial projects (mainly oil, gas and petrochemical branch) including:
Market Study Feasibility Study Project Management (General Contracting) MC) Process Selection License & Know How Arrangement Plant Optimization Engineering Procurement services (order issue , expedite , Inspection , delivery) Construction & Construction Supervision Site Technical Assistance
www.hedcoint.com 5
HEDCO ICT GroupIn HEDCO, ICT is not simply as a tool but as a glorious work media.In this respect , extensive investment & effort is made in information & communication technology and HEDCO has installed communication infrastructure (HTMS) in the company which is targeted to be: Total Project Task & Phases Coverage (EPC Integrated) Taylor Made to Best Practice Work Flow definable Web Based & Global Access Real time & On-Line Task Execution Transparency Hierarchical Information Access Paperless Document Distribution/Circulation Automatic Task Assignment , Expediting , Reporting & Progress
Measurement Correspondence Control User friendly to all users (Designers , Management , Client , Vendors)
www.hedcoint.com 6
HEDCO Portal
Engineering
Construction
Procurement
General Systems
HEDCO TOTAL MANAGEMENT SYSTEM(HTMS)
HEDCOis proud ofits unique
Integrated Data Communication
&Management
Software Platform (HTMS).
www.hedcoint.com 7
AVEVA Schematic‐3D Integrator
HEDCO has recently improved the quality of its services to the clients by hiring the AVEVA smart P&ID software module.
P&IDs (Piping & Instrumentation Diagram) are key documents that define the function of any equipment and object in the plant. They are a key part of the design activity and continue to be referenced and developed during the operation and maintenance phases.
AVEVA Diagrams provides a fast, efficient and effective solution for creating P&IDs diagrams. It has the added value that, as the diagram is constructed, data is created in a schematic model database. The design information can therefore be effectively managed, and easily accessed, by any engineer who requires the information and has the appropriate access rights.
www.hedcoint.com 8
AVEVA smart P&ID
3D Modeling Design
Materials Take off
Construction Work Fronts
Automatic Data Sheet and
Index Generation
Smart Design Interference
Checking
HEDCO AVEVA Software
9www.hedcoint.com
HEDCO Projects
a) Ammonia & Urea Projects1 ) Lavan Ammonia & Urea Plants
- Capacity(each) : 2050MT/D Ammonia - 3250MT/D Urea- Client(s) : Lavan Chemical Company- Location(s) : Assaluye- Scope: Grant of License, Basic & Detail Engineering, Procurement &Supply of Equipment , Construction, Erection ,Pre-Commissioning,Commissioning & Start-Up
2 ) Golestan , Zanjan & Lordegan Ammonia & Urea Plants- Capacity(each) : 2050MT/D Ammonia - 3250MT/D Urea- Client(s) : Golestan , Zanjan & Lordegan Petrochemical Companies- Location(s) : Golestan , Zanjan & Lordegan- Scope: Basic & Detail Engineering, Procurement Services
3 ) Pardis 3 Ammonia & Urea Plant - Capacity: 2050MT/D Ammonia - 3250MT/D Urea- Client : Pardis Petrochemical Company- Location: Assaluyeh
- Scope: Basic & Detail Engineering & Technical Procurement Services
www.hedcoint.com 10
HEDCO Projects(cont.’d)
b) Other Process Projects
1 ) Fasa LDPE (Low Density Poly Ethylene)- Capacity: 300,000 TPY LDPE- Client : Fasa Petrochemical Company- Location : Fasa - Fars ProvinceBasic & Detail Engineering and Procurement Services
2 ) Parsian Gas Refinery (C2 Recovery & Fractionation)- Capacity: Boutan Sm3/day of Natural Gas- Client : Palayesh Parsian Sepehr Company- Locations: Mohr & Assaluyeh
- Scope: Basic & Detail Engineering and Procurement Services
3) Abadan Desalting Unit- Client : Abadan Oil Refinery- Locations: Abadan
-Scope: Basic &Detail Engineering, Procurement , Construction
www.hedcoint.com 11
HEDCO Projects(cont.’d)
c) Utilities & Offsite
1) Zanjan Petrochemical Utility & Offsite-Client : Zanjan Petrochemical Co.- Location : Zanjan-Scope: Basic & Detail Engineering and Procurement Services
2) Lordegan Utilities & Offsite Plant-Client : Lordegan Urea Fertlizier Co.- Location : Lordegan-Scope: Extended Basic Engineering and Technical Assistance
www.hedcoint.com 12
HEDCO Projects(cont.’d)
d) Cryogenic Storage Tanks1 ) Razi Third Ammonia Storage Tank- Capacity : 30,000 Tons- Client(s) : Razi Petrochemical Company (RPC)- Location(s) : Bandar Imam-Scope: Detail Engineering, Procurement & Construction,Commissioning & Start -up
2 ) Butane and Propane Storage Tanks for Parsian Gas Refinery (4 No.’s)- Capacity: 26,000 m3 each- Client : Palayesh Parsian Sepehr Company- Locations: Mohr & Assaluyeh
- Scope: Basic & Detail Engineering and Procurement Services
3 ) Lordegan Ammonia Tank- Capacity: 20,000 Tons- Client : Lordegan Petrochemical Company- Location : Lordegan- Scope: Basic & Detail Engineering and Procurement Services
www.hedcoint.com 13
HEDCO Projects(cont.’d)
d) Cryogenic Storage Tanks (Cont.)4 ) Zanjan Ammonia Tank
- Capacity: 20,000 Tons- Client : Zanjan Petrochemical Company- Location : Zanjan- Scope: Basic & Detail Engineering and Procurement Services
www.hedcoint.com 14
HEDCO Projects(cont.’d)
e) Ammonia Reformers1) Pardis Ammonia Reformer Package-Client : Pardis Petrochemical Company- Location : Assaluyeh-Scope: Basic & Detail Engineering and Procurement Services
2) Zanjan Ammonia Reformer Package-Client : Zanjan Petrochemical Co.- Location : Zanjan-Scope: Basic & Detail Engineering and Procurement Services andConstruction Supervision
3) Razi Reformer Package ( Ammonia Plant 2)-Client : Razi Petrochemical Co.- Location : Bandar Imam-Scope: Detail Engineering and Procurement Services ( Consultant in revamping)
www.hedcoint.com 15
HEDCO current Projects (cont.’d)
f) Overseas Projects
1) Oman Raysut Terminal Revamp-Client : AL-QAEM Petro Projects & Services LLC- Main Owner : Oman Ministry of Oil & Gas- Location : Oman, Salalah Port- Scope: Engineering, Technical Procurement Services
www.hedcoint.com 16
HEDCO Basic Engineering Experiences
• Basic Engineering of Urea Unit for : Golestan / Zanjan / LordeganPetrochemical Company
• Basic Engineering of Ammonia Unit for : Pardis Petrochemical Company (Pardis III Project)
• Basic Engineering of C2 Recovery Unit for : Parsian C2+ Recovery & Fractionation Project
• Basic Engineering of LDPE Unit for : Fasa Petrochemical Company
17www.hedcoint.com
Diploma , 18
Tech. Diploma , 33
Engineer, 131
M.S, (Engineers) 69
B.S, 13
PHD,7
HEDCO Staff (High Education) (Print Date : April 2014)
www.hedcoint.com 18
Process, 25
Instrumentation ,20
Electrical, 16
Piping, 37
Civil & Structure, 33
Mechanical , 20
Procurement, 7
Planning, 8
Machinery, 10
Quality, 6
Project Management Team
, 22
ICT , 15
Marketing , Proposal & Contract, 5
Technology Division, 8
Human Resource, 1Document Center, 5
HEDCO Staff (Specialists)
(Print Date : April 2014)
www.hedcoint.com 19
Hour Status‐HEDCO Assigned & Available Man(Print Date : April 2014)
www.hedcoint.com
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
50,000
Jan-
11Fe
b-11
Mar
-11
Apr
-11
May
-11
Jun-
11Ju
l-11
Aug
-11
Sep-
11O
ct-1
1N
ov-1
1D
ec-1
1Ja
n-12
Feb-
12M
ar-1
2A
pr-1
2M
ay-1
2Ju
n-12
Jul-1
2A
ug-1
2Se
p-12
Oct
-12
Nov
-12
Dec
-12
Jan-
13Fe
b-13
Mar
-13
Apr
-13
May
-13
Jun-
13Ju
l-13
Aug
-13
Sep-
13O
ct-1
3N
ov-1
3D
ec-1
3Ja
n-14
Feb-
14M
ar-1
4A
pr-1
4M
ay-1
4Ju
n-14
Jul-1
4A
ug-1
4Se
p-14
Available Man-Hour
Assigned Man-Hour To Current Projects
20
21
HEDCO Growth and Personnel Increase
(Print Date : April 2014)
280267249
204
154166145
0
50
100
150
200
250
300
2014201320122011201020092008
Growth in No. of Personnels
No. of Personnels
www.hedcoint.com
HEDCO Hardware(Print Date : April 2014)
www.hedcoint.com 22
Hardware List Item No. Hardware Quantity.
1 Personal Computer (PC) 2632 Notebook (Laptop) 683 Display - Additional LCD 534 Printer A4 305 Copier/Scanner A4 /A3 56 Color Printer A3, A4 17 Plotter B/W A0, A1, A2 28 UPS 149 Telephone (Panasoinc -KX-T665) 240
10 Telephone Center (Panasonic) 411 Tape Backup 212 Layer 3 Switches 413 Layer 2 Switches 1614 Wireless Routers 1115 NAS Server 216 NVR 117 Router 118 PRI Modem (Siemens) 219 IP Camera 22
HEDCO Ammonia License
After many times performing the Basic and Detail engineering of Ammonia units, and acquiring complete knowledge about different methods of ammonia production process, HEDCO has developed and offered its specific method for production of Ammonia.Compared to existing Licenses, HEDCO License has advantages in: Plant’s Energy Consumption Installation Cost Operating Cost. Ease of Operation Less Proprietary
Equipment(Only Reactor Internal)
www.hedcoint.com 23
HEDCO Technology Division – Cryogenic Storage Tanks
HEDCO has succeeded to achieve the complete know-how and specialties of engineering , material supply , fabrication and construction of cryogenic storage tanks (up to -50 deg. C). The company’s scope of work in this respect will be :
Mechanical design Thermal design Boil off rate Insulation Foundation Frost heave Roll over Cool down In tank pump
www.hedcoint.com 24
HEDCO Technology Division – Ammonia Reformer
HEDCO acts as the vendor for the ammonia primary reformer which is a complex Fabrication on Site, Process-Mechanical Package. The company’s scope of work in this respect will be :
Thermal and Mechanical calculation,design and engineering
Preparation of P&ID and PFD Preparation of all necessary documents,
drawings , procedures and specification Thermal guarantee Performance Guarantee Site supervision for erection and
assistance for start up and commissioning
25www.hedcoint.com
Fired heaters
The heaters are being designed by theFRNC-5PC which is a Simulation Softwarespecially made for design of fired heatersand is used for majority of heater Vendors.
The heaters will be supplied prefabricated asmaximum as possible in shop , however , Basedon final dimensions and transportation limitationthe heaters may be delivered in multi-pieces to beassembled at site or final assembly may be doneat shop for final bolting of mating flanges at site.
www.hedcoint.com 26
HEDCO amine (H-MDEA® for CO2 Removal)
HEDCO introduced its chemical admixture for CO2 Removal Process.
This Chemical can be used as an alternative for the available amines in the market but with improved properties.
The H-MDEA® has been successfully tested in the laboratories and pilot plant of Research Institute of Petroleum Industry (RIPI) in November 2013 and the respective assessment results is officially issued.
The consumers of H-MDEA® are the followings:
- Ammonia Production Plants- Ethane Recovery Units- Refineries (Gas Sweetening Units)- Sulphur Recovery Units
27www.hedcoint.com
HEDCO Renewable Energies Division
In light of limited energy and fossil fuel resources available to mankind, growing awareness for significant issues such as climate changes, environmental concerns about Greenhouse Gases & Carbon Emission Reduction Target (CERT) plans, the request for renewable energies such as Wind power are increasing in popularity.In order to respond to this market requirement and fulfill its global responsibilities, HEDCO has established its renewable energy division and has concentrated on the following fields:
Solar Energy Technologies (Solar Power Plants , Solar Electric Power Packages , Solar Thermal Energy Packages)
Wind Farms & Hybrid Wind-Hydropower Hydrogen & Fuel Cells Geothermal Biomass Incineration Power Plants
www.hedcoint.com 28
SARIR (INTERNATIONAL ENGINEERING AND TRADING COMPANY)
In order to play a strong role in the global market, HEDCO has established SARIR, its Turkish sister company, which is active in the same field of activities as HEDCO ,concentrating on the procurementactivities of EPC projects as well asinternational marketing of HEDCOTechnologies for Catalytic Reformers,Cryogenic tanks , etc.
29www.hedcoint.com
www.hedcoint.comWeb site:
info@hedcoint.commail: -E
Tel: (+98) 711- 2263181-90(+98) 711- 2136555
Fax: (+98) 711- 2263097
Thank You
30www.hedcoint.com