Agile Introduction
July 2015
Ali Chekir, Amine Choukir
info@web4innovation.ch
© 2015 Web4Innovation and/or its affiliates. All rights reserved. 8
Prioritized Backlog creation
Feature list
• The PO has a list of desired features
User storie
s
• The PO captures the features details in User Stories
Investigation
• The team studies the User Stories and clarifies the requirements
Breakdow
n
• The team breaks the High Level user stories in more detailed stories
Sizing
• The team sizes the stories to the best of its knowledge.
PO: shuffl
e priorit
ies
• Reprioritization: knowing the customer value and the estimated cost the PO can review the priorities
© 2015 Web4Innovation and/or its affiliates. All rights reserved. 9
Release planning
Commited user
stories
Prioritized and sized backlog
Team Velocity
Deadline