Aerojet Environmental Update
Carmichael Town Hall Meeting
March 12, 2008
Michael Girard
Aerojet Environmental Site Remediation
(916) 355-2945
michael.girard@aerojet.com
Aerojet’s Goals for Remedial Action
• Shared Goals - Aerojet and Stakeholders– Meet EPA and State of California goals and objects
– Protect the community’s drinking water resources
– Halt migration of chemicals
– Restore the aquifer
• Minimize disruption to Carmichael community
• Partnership with regulators, local government, water district and the community– Community outreach
– Proceed with the timely planning and implementation of Groundwater Remediation
– Identify opportunities for beneficial use of treated water
Path to Successful Implementation
• Collaborative Approach to Response – Carmichael Water District (CWD)– Aerojet Corporation– Federal and State Agencies (EPA, DTSC, RWQCB)– Sacramento County
• Board of Supervisors
• Parks
• Water Resources
• Real Estate
• Development of Mutual Benefits as Part of Project Scope
Path to Successful Implementation
• Unique approach to problem solving
• Carmichael Water District with full support from its Board quickly responded– Teamed with Aerojet to seek win-win solutions– Protect the Water Supply– Engage with multiple stakeholders– Protect the interests of the Community– Push for timely resolution
• Innovative use for treated water benefited CWD customers and the Parks
• Multiple project paths resulted in the completion of the Bajamont plant while issues with Ancil Hoffman were resolved
How the Cleanup Process Works
Groundwater contamination moves with groundwater flowGroundwater Resource
Protected
Surface WaterWestern Groundwater Movement
Extraction well intercepts and stops plume movement
Extracted groundwater is piped underground to treatment facility
Cleaned groundwater is piped underground to discharge point and returned to environment
Enclosed treatment filters remove contamination
Western Groundwater Operable Unit
Area 3 Northern Rancho Cordova
Area 1 Southern Rancho Cordova
Area 2Gold River (Complete
d)
US HW
Y 50
SU
NR
ISE B
LV
D.
Aerojet GET E/F
(Completed)
INTERNATIO
NAL
DRIVE
FOLSOM
BLVD.
Area 4Carmichael
LegendCompleted Extraction WellCompleted Treatment Facility
Completed Pipeline
Approximate Aerojet Boundary
Proposed Extraction Well
Proposed Treatment FacilityProposed Pipeline
Water Supply Well
Carmichael Remedial Action (Area 4)
Palm Dr.
Landis Ave.
Bajamont GET L-B
Fai
r O
aks
Bou
leva
rdFair Oaks Boulevard
Ancil Hoffman GET L-A
Action Needed to Protect Water Supply Wells
Ancil Hoffman Treatment Facility under Design
Sunrise Boulevard
Bajamont Facility Complete, and Operating
Extraction Well
Water Supply Well
Treatment Plant
Ancil Hoffman GET L-A Design Considerations
• Established residential and recreational area• Minimal impact to Community (short and long-term)• Limited available land to site well and treatment plant• Use of County land for locating extraction well(s) and
treatment plant• Design goals
– Minimize visual impacts in natural setting– Minimal impacts to various park uses and activities – Compatible with existing golf course structures
• Floodway constraints• Integrate design with CWD Storage Tank Project
Conceptual GET L-A Treatment Plant
GET L-A Schedule Summary
• Design, Bidding, Contract Award Now thru June 2008
• Receive Bids / Award Contracts June 2008
• Complete Well and Pipelines July thru Nov 2008
• CWD Constructs Reservoir Mar thru Nov 2008
• Start Treatment Plant Construction Nov 08 or April 2009
Accomplishments
• Bajamont Treatment Plant constructed and operating
• Ancil Hoffman Treatment Plant location selected
• Environmental Documents complete and approved (CEQA)
• Lease agreement with County complete and approved
• Extraction well and monitor wells constructed
• Preliminary facility design complete
• Treated water discharge permit approved (NPDES)
System Designed for Flexibility
• Treatment Plant– Planned flow of ~
– Plant capacity as built ~
• Extraction Wells– Planned pumping rate ~
– Well capacity is ~
Ancil Hoffman800 gpm
2000 gpm
800 gpm
1200 gpm
Bajamont600 gpm
1000 gpm
600 gpm
840 gpm
Next Steps
• Complete Construction
• Facility start-up and optimization process takes 1-6 months
• Once system has operated for ~ 1 year an Effectiveness Evaluation is performed and a report is provided to the Agencies
• Possible System Adjustment (if necessary)
– Modify pumping rates in existing wells
– Modify treatment plant equipment
– Install new extraction well(s) with associated pipelines
Thanks for your Time and Interest !
Questions?
Future Questions or Concerns?