Transcript of Aerodrome latest development Meeting in Tallinn 30 January 2013.
- Slide 1
- Aerodrome latest development Meeting in Tallinn 30 January
2013
- Slide 2
- 2 A story started many years ago
- Slide 3
- CRD: Status and future steps Publication of CRD on November 26,
2012 Reaction Period of CRD (until February 3, 2013) Publication of
Final Opinion 3 Final Opinion
- Slide 4
- Key Matters: Cover Regulation Transition: 48 months also for
authorities Definitions: Reworked, ICAO alignment ensured Competent
Authority concept introduced: ARs only here Exemptions for small
ADR: Lighter requirements Conversion: Option to waiver
demonstration of compliance DAAD: Application until 2024 Obstacles:
No enroute 4 More in: ExplNote B
- Slide 5
- Key Matters: Authority Requirements 5 Less notification /
information obligations Management System: Lighter, more flexible,
less detailed Oversight Programme: Now risked based, less
descriptive Eligibility: Removed Manual: No approval, acceptance
Obstacles: No enroute Change of operator: Removed ToA, Appendices:
Removed More in: ExplNote C
- Slide 6
- Key Matters: Operator Requirements 6 Prior approval of changes:
Simplified, CB included Management: Lighter, more flexible
Personnel requirements: Less descriptive, lighter, clarifications
provided Facilities: Simplified Interfaces with other
organisations: Improved as clearer, lighter More in: ExplNote
D
- Slide 7
- Key Matters: Operations 7 Scope of responsibilities: Clarified
and limited by new Article B.001: directly or indirectly In several
places: Ownership of processes or plans clarified, obligations
removed Hazardous materials: Removed RFFS Response Time: Aligned
with ICAO Remission Factor, Cargo OPS: Not harmonised, open More
in: ExplNote E
- Slide 8
- Key Matters: Certifications Specs 8 Ensured: Only safety
related specifications now in CS; total of ~10% moved to GM Safety
Objectives: Added to some key CSs ICAO alignment: Improved in many
places RESA = ICAO + EMAS option (only SL041 element left) More in:
ExplNote F
- Slide 9
- ADR rulemaking on-going CRD reaction period on-going EASA
Opinion to be issued in Feb 2013 Aerodrome rules: - ADR operator
& oversight - ADR operations - ADR design Rulemaking task
on-going NPA to be issued Q2/13 Apron management services New RM
task to be proposed (RAG/TAG) ICAO SL 41, PANS-ADR RM task
(together with ATM) to be launched Q2/13 Systems & equipment In
Rulemaking programme, RM task not launched Heliports
- Slide 10
- Let us start ASAP With 3 KM highway you can go from centre
Tallinn to the Airport With 3KM runway you can go from Tallinn to
Cologne