Achieving Operational Efficiency by Leveraging PI System at PowerStream
Vince Polsoni, PowerStream Inc.
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Where are we?
2
Ontario 1,068,587 km2
Texas 696,200 km2
Powerstream Service Territory • 806 km2 • 11 Municipalities • Located just North of Toronto
Powerstream Service Territory
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
PowerStream Fast Facts
• 2nd Largest Municipally owned Local Distribution Co. (LDC) in Ontario, Canada
• Serving 11 Communities through Central Ontario (Serving over 1 million residents)
• 550 Employees
• 343,000 Customers : (Residential (89%) Commercial Ind. (11%) )
• Total Revenue: $788 Million
• Total Assets: $1,087.5 Million
• Overhead Circuit Wires: 2,500 km
• Underground Cable: 4,900 km
• Transformer Stations (TS’s): 11
• Municipal Substations (MS’s): 55
• Distribution Transformers: 43,000
• Switchgears: 1,800
• Poles: 40,000
• Peak Demand: 1,972 MW
• Geographical Size of Service Territory: 806 Sq. Km
• Distribution Voltages 4kV, 8kV, 13.8kV, 27.6kV and 44kV
3
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Agenda
• PI System in use at PowerStream (Operations)
• Technology and Innovation
– Equipment Monitoring
– Big Saves
– PI System Dashboards
4
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Life before PI System / Operations Reporting SCADA / CMMS / OMS / CIS / ERP / EAM / WFM
SCADA
• Data is overwritten based on frequency of data point collection in some databases (e.g. SCADA)
• Archived/Historical data is often extracted and stored in flat files (spreadsheets)
Reports Data Dumps
OMS CIS
CMMS
5
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Station Maintenance at PowerStream
– RCM2 methodology incorporated into CMMS
– Risk based Condition Based Maintenance (PI System and CMMS)
– Instant Information (true real-time)
• Instant Notifications from PI System (Real-time)
• Alerts from Computerized Maintenance Management System (CMMS) (CASCADE)
• Better Reporting and Asset Health assessments
– Automatic Maintenance Work Orders triggered by Events in SCADA via PI System and Maintenance/Inspection Reads
– Field staff aware of equipment condition/health/risk
– One data source
6
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Background - PI System at Powerstream
• July 2012
– Implementation – 5000 tags, PI ProcessBook, PI DataLink
– Justified as part of Computerized Maintenance Management System (CMMS) implementation strategy
• 2013 to 2014
– Operational reports (PI ProcessBook, PI Coresight, DataLink, PI WebParts)
– Asset Framework (AF), Templates
– Notifications
– 30,000 tags
• 2015
– Performance Equations, Data sets, Analysis, Tables
– Dashboards (PI Coresight and PI WebParts)
– PI Interfaces (CMMS, OMS, HTML, UFL)
7
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Leveraging PI System at Powerstream
• Operations Dashboards (Public Monitors, IPAD)
• Link to multiple databases/systems
– SCADA, OMS/CIS, CMMS, MicroGrid
– PI HTML Interface, PI UFL Interface
– Expand Notifications / Alerting to stakeholders (email) • Offload low level SCADA alarms through PI System
Notifications to field staff (awareness)
• AF, Performance Equations and Asset Analytics
• Next – ESRI Integrator, Forecasting, Enhanced Analytics
8
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Station Sustainment Innovation Equipment Monitoring – SEL Relays
– Online Transformer Gas in Oil Monitoring Units
• (7 Gas) DGA monitors on 55/83 MVA and 75/125 MVA transformers
• Hydrogen monitors on 5 to 20 MVA transformers
– Portable DGA testers
– Tap Changer Filtration Systems. Transformer Oil Dry-out Filtration System
– Online Bushing Monitoring Systems
– Maintenance Free Dehydrating Breathers
– Station Equipment Temperature Sensors (new 2015)
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
PI System Products used at Powerstream
10
• PI ProcessBook • PI Coresight • PI WebParts • PI DataLink • PI AF • PI SMT, PI Explorer, PI ICU • PI HTML Interface • PI UFL Interface • PI RDBMS Interface • Templates
• Element • Notifications
30,000 tags
(and growing)
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
PI System Explorer – AF - PowerStream
11
Elements Notification Templates Element Templates Notifications
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
How PowerStream uses PI System Explorer
• Asset Framework
• Elements
– Attributes from PI Points, CMMS, OMS, web pages(HTML) and static data
– Create tags from attributes using “Analyses” tab
– Attributes used in many PI System Reports
• Library
– Notification Templates
– Tables (from OMS, CMMS)
• Notifications
– Over 1400 notifications enabled
12
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
• Automatically Generate maintenance task in CMMS system based on triggers, gather data from OMS
• Basic functions (average, max, min) • Trends, calculated values, counters
• Various displays catering to different audiences • Various display tools • Drill–down user interface
• Notifications and alarms (Real-time) • Access to Reports via Notifications
Leveraging PI System for Risk Based Condition Based Maintenance
13
Real-time Alerting
Visual Reports
User Friendly
Simple Tools
Integration
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Condition Based Maintenance - Data Flow
14
SCADA PI
System CMMS
Station Equipment Analog & Status Data
CMMS Alerts (delayed)
PI Notifications (Real-time)
Firewall
PI System Reports / Dashboards (Real-time)
CMMS Work Order
Firewall
Patrols
HTML
Internet Scraping
Reads
OMS
(CMMS)
Algorithm Rules Engine
Outage Mgmt System
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
SCADA – PI System – CMMS working as One
15
(from SCADA event) (from CMMS) (automatically generated)
PI Notifications CMMS Alert CMMS Work Order
PI System Report PI System Report
High
(High Water Alarm Cleared) (High Water Alarm)
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
PI ProcessBook Reports - Powerstream
16
• System Demand • Geomagnetic Induced Current • Station Performance/Risk • DC System • Station Fire Alarm • Building Heating • Station Single Line Diagrams • Primary Switch Status • Under Frequency Load Shed
• Transformer • Condition (Health) • Dissolved Gas Analysis • Oil Temperature & Cooling • Tap Changer and Tap
Changer Position • Bushing Monitoring • Hydrogen Gas
• Circuit Breaker
• Status and Detailed • SF6 Status
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
PI ProcessBook – TS Transformer Report
Links: • Weather report • Radar Map Link
Pictures External Database/App
Trends
Animations
Gauges
Equipment Attributes
18
AF Elements
Template Report
Status
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Station Performance/Risk Reports
19
Transformer Station
Performance (Risk)
Distribution Station
Performance (Risk)
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Regional Demand: Current, 30 Day & Year to Date Maximums
25
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
System Reliability Report using PI Coresight/PI ProcessBook
27
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Substation Interconnection – Load Transfer Report
28
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
TS Transformer Criticality, Health and Risk Report
29
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Substation Distribution Transformer Hydrogen Gas Alarm Report
30
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
PI ProcessBook Reports
Tap Changer
DC Systems
230 kV Primary Switch Status
Circuit Breaker Status
31
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Demand Report • Use PI System to view and notify when System Demand approaches
Powerstream’s “All-Time” peak.
32
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Notifications
• Low SF6 Gas
• Current Total Outages by Region
• Station Building Temp
• DC System
• Battery Low Voltage
• Calisto 9 General Alarm
• Circuit Breaker Operation
• Transformer Online / Offline
• Transformer Oil Temp/Cooling
• Tap Changer Oil Filtration Alarm
• Feeder Protection Trip
• Secondary Breaker Operation
• Primary Switch Operation
• High Sump Water Level
34
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Outage Information Flow with PI System
35
Notifications Feeder Protection Trip
Link to view PI Coresight Report
Notifications Outage Counts by Region
Email from Outage Management System
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
PI Coresight – Transformer Reports
37
Transformer Load (MW) Transformer Hydrogen and Moisture
Transformer Winding Temperature
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Save - 10MVA 44kV-13.8 kV Transformer
40
Notifications • Hi Winding Temperature • Hi Hydrogen Alarm
Installed a Hydrogen Gas Monitoring Unit and connected to SCADA (PI)
• $500,000 averted • No customer outages • Transformer taken out of
service before failure and replaced with spare
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Transformer - Save
• In late 2011 noticed increased gassing from annual oil test results from laboratory.
• In early 2012 Purchased a portable DGA unit and began to test and monitor transformer oil.
• In summer 2012 implemented PI System. • In fall 2012 installed a 7 gas oil monitoring unit created tags in
PI Data Archive • Created PI Report and configured a Trigger in CMMS to monitor
gassing vs. load and oil temperature • Consulted with transformer SME’s (provided SME’s PI Server data)
42
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Comparison T3 and T4 DGA Trends
T3 (Good) T4 (Failing)
43
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Expert Systems Working in Unison
Oil Oil
Data Data
44
Data Analysis Analysis
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Increased Gassing - 2 Significant Events
Oct 20, 2012 April 19, 2013
PI Coresight PI Coresight
45
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Gassing in Transformer
PI ProcessBook, TOA4 and CASCADE CMMS
TOA4
CMMS
PI Processbook
Transformer Problem Identified
(Health and Risk)
46
Daily or
on demand
daily
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Findings
• It was found that one of the "T" connectors was not crimped during manufacturing to the copper lead.
Repair: $100,000 (Potential Failure)
Up to $2 million if unit failed catastrophically or with serious internal damage to windings or core.
47
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Expansion of PI System at PowerStream
• Corporate and Operations Dashboards
• Micro Grid Reporting
– Micro Grid Demonstration Project (PowerStream head office)
– Penetanguishene Micro Grid Project –PowerStream / KEPCO (Penetanguishene, ON, Canada)
• ESRI Integrator – GIS
• Analytics
• Potential Merger (more opportunities)
48
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Benefits of PI System
• Maintenance Optimization
• Able to accomplish a lot with minimal resources
– Fast learning curve
• YouTube, Manuals, Support, Training
• Innovation stimulant
• Instant Information to those who need it
49
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
PowerStream’s Micro Grid Projects
50
• Micro Grids work in the same way as large-scale electricity delivery systems or the grid, but instead of delivering electricity to hundreds of thousands or millions of customers at a time, they can be scaled down and customized to meet the needs of communities or even just one customer.
• Micro Grids rely on a mix of clean and renewable sources of generation and can operate independently or feed electricity back to the grid.
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Micro Grid Demonstration Project
• Launched the Micro Grid demonstration project in November 2013 at its head office in Vaughan, Ontario.
• Using the project to evaluate a Micro Grid’s performance while it is connected to, and also disconnected from, the provincial grid.
51
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015 52
• 30 kW load
Display and analysis
• 25 kW Renewables • Solar • Wind
• 35 kW Natural Gas Generator
• 40 kWh storage • Batteries
• Lead Acid • Lithium • Na Ni CL
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Generation Assets
53
1.8 kW Wind Generator
17 kW Tracking Solar Generator 5 kW Solar
Generator (EV Car Port)
35 kW Natural Gas Generator
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Communications and Control System
55
D400 Gateway Protocol Convertor
Smart Load Panel Transfer Switch
SCADA Server
PI ProcessBook, HMI Display Screens
PI Server
www.
Battery Systems EV Charger NG Generator
G
SMA Inverters
Modbus Ethernet
HDMI
Ethernet
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
• Multiple report options • Historical data • Mobility (Smartphone, tablet)
• Notifications and alarms (Real-time)
• Intuitive Display • Various displays catering to different audiences • Drilldown user interface
PI System Benefits – Micro Grid Project
57
Real-Time Display
Notifications / Alarms
User Friendly
Simple Tools
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Penetanguishene Micro Grid – PowerStream / KEPCO Project (2016)
• Partnership between PowerStream and Korea Electric Power Corporation (KEPCO) • Installed adjacent to one of PowerStream’s Municipal Substations • Operated from PowerStream’s System Control Centre with remote monitoring using
PI System for PowerStream • Provides power to customers even when there is a loss of supply from the provincial
grid • Connected to PowerStream’s distribution feeder that provides up to 11 hours of
backup power for approximately 400 customers in Penetanguishene, ON, Canada. • Micro Grid will operate either connected to the grid (grid mode) or disconnected
from the grid (island mode) • Comprised of
– Two 500 kilowatt-hours (kWh) batteries – One 750 kilowatt power control system
• Construction underway - 2016 implementation
58
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
RESULTS AND BENEFITS BUSINESS CHALLENGES SOLUTION
Summary
59
A. Optimize Maintenance practices and improve system reliability
B. Provide and utilize Operational data outside of SCADA (Operations)
C. Build Operations Dashboards and expand the use of PI System
A. SCADA to PI connectivity
B. Integrated PI System to CMMS and OMS
C. Utilize PI Notifications to alert on potential failures
D. Build Dashboards
• Real-time information to those who need it
• Increased equipment monitoring and alerting
• Information is current and consistent
• Improved Reliability and Availability
There is a constant pressure to do more with less. Improve reliability and availability. In order to achieve this, the same information needs to be made available in multiple systems.
Data turned into Information is the key to achieving Operational efficiency.
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015
Contact Information
60
Vince Polsoni
vince.polsoni@powerstream.ca
Manager Station Sustainment
PowerStream Inc.
60
© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015 61
Questions