Post on 16-Oct-2021
copyright 2006 Z-Group Architects
Sheet #:
Drawing Title:
Construction
Issue Date:
DATE# ISSUED FOR
Seal:
TO
WN
OF S
NO
WM
ASS V
ILLA
GE
SN
OW
MA
SS V
ILLA
GE T
OW
N H
ALL
KE
AR
NS
RO
AD
SN
OW
MA
SS
VIL
LA
GE
, C
O 8
16
15
7/21/06 30% PROGRESS SET
8/4/06 50% PROGRESS SET
8/17/06 60% PROGRESS SET
9/1/06 75% PROGRESS SET
234 E. Hopkins Ave.
ASPEN, CO 81611
970-925-1832
9/15/06 PERMIT & BID SET
9/29/06 PERMIT SET
6-4-07
11/20/06 CONSTRUCTION
502 Whiterock Ave. P.O. Box 3725Crested Butte, CO 81224(970) 349-1216www.reginc.com
ResourceEngineeringGroup, Inc.
efficiency sustainability simplicity
1/24/07 Revision #1
6/4/07 Revision #2
M1.0 Mechanical Legend and General NotesM1.1 Lower Level Mechanical PlanM1.2 Main Level Mechanical PlanM1.3 Upper Level Mechanical PlanM1.4 Roof Level Mechanical PlanM2.0 SchedulesM2.1 Mechanical Details
1) See Division 15 specification for detailed notes, specifications and controls sequence.
Mechanical Drawings
Abbreviations Symbol Legend Drawing Index
General Notes
All areas except the garage will be served by roof top mounted air handing units (RTUs). Heating will be provided by a central gas-fired boiler plant and distributed by coils in the RTUs and terminal reheat. Cooling will be provided by direct expansion coils in the RTUs.
Ventilation for the conference room, council chambers & lobby will be controlled based on carbon dioxide levels. Ventilation in the office areas will be continuous during occupied hours, with carbon dioxide monitoring for verification.
The garage will heated by unit heaters. A wall mounted fan and louver combination will provide garage ventilation based on carbon monoxide levels.
System Description
M1.0General Notes
X"
M
Pump
Three way mixing valve
Motorized mixing valve
Solenoid valve
Manual balancing valve
Ball valve
Check valve
Pressure-activated bypass valve
Anti-convection valve (or pipe bends)
Supply piping or duct (single line)
Return piping and size or duct (single line)
Hydronic zone manifold
Thermostat
Humidistat
Indicates master controller for ventilator "x".
Indicates sub-controller for ventilator "x".
Pressure gauge, permanently mounted
Temperature gauge, permanently mounted
Pressure/temperature measurement port Balancing damper
Diffuser callout (return or supply)
Detail callout and sheet reference number
Detail callout-- same sheet
Zone callout
Supply air
Return air
Outside air
Wall supply diffuser
Wall return grille
S
T
H
P
P T
XXX XXXXXX
xxXX.X
X
XX
T
V M: V-x
V V-x
AFF Above Finished FloorB BoilerBDD Backdraft DamperBOD Bottom of DuctBOU Bottom of UnitBT Buffer Tank (hydronic) or BathtubCC Cooling CoilCFM Cubic Feet Per Minute (Air)CH ChillerCLG CeilingCO Clean OutCXN ConnectionCW&V Combination Waste and VentCT Cooling TowerCW Cold WaterDBT Dry Bulb TemperatureDHW Domestic Hot WaterDIA DiameterDN DownDW DishwaterDWG DrawingEA Exhaust AirEAT Entering Air TemperatureEC Electrical ContractorEL ElevationESP External Static PressureF FurnaceFCU Fan Coil UnitFD Floor DrainFLR FloorGA GaugeGC General ContractorGPM Gallons Per Minute (GPM)GRD GradeGSHP Ground Source Heat PumpH HumidityHB Hose BibHX Heat ExchangerHP Heat PumpHVAC Heating, Ventilation and Air ConditioningHWR Hot Water ReturnHWS Hot Water SupplyIM Ice MakerINWG Inches Water GaugeL LavatoryMAX MaximumMBH Thousand Btu Per HourMC Mechanical ContractorMECH MechanicalMIN MinimumNIC Not in ContractNTS Not to ScaleOA Outside AirOFD Overflow DrainP Pump or PressurePSI Pounds Per Square InchPRV Pressure Reducing ValveRA Return AirRD Roof DrainRT Rooftop UnitREQD RequiredS SolenoidSA Supply AirSK SinkSH Shower or Shower/Tub CombinationSP Static Pressure or Sump PumpSPEC SpecificationSS Stainless SteelSTD StandardSV Solenoid ValveT TemperatureTBD To Be DeterminedTYP TypicalVAV Variable Air VolumeVTR Vent thru roofWBT Wet Bulb TemperatureWC Water ClosetWM Washing MachineYH Yard Hydrant
copyright 2006 Z-Group Architects
Sheet #:
Drawing Title:
Construction
Issue Date:
DATE# ISSUED FOR
Seal:
TO
WN
OF S
NO
WM
ASS V
ILLA
GE
SN
OW
MA
SS V
ILLA
GE T
OW
N H
ALL
KE
AR
NS
RO
AD
SN
OW
MA
SS
VIL
LA
GE
, C
O 8
16
15
7/21/06 30% PROGRESS SET
8/4/06 50% PROGRESS SET
8/17/06 60% PROGRESS SET
9/1/06 75% PROGRESS SET
234 E. Hopkins Ave.
ASPEN, CO 81611
970-925-1832
9/15/06 PERMIT & BID SET
9/29/06 PERMIT SET
6-4-07
11/20/06 CONSTRUCTION
502 Whiterock Ave. P.O. Box 3725Crested Butte, CO 81224(970) 349-1216www.reginc.com
ResourceEngineeringGroup, Inc.
efficiency sustainability simplicity
1/24/07 Revision #1
6/4/07 Revision #2
83
82
81
7 6 5 4 1
A
B
C
D
E
F
G
H
D
8A
8B
8C
83
81 7 6
4 3 2 1
26 25 2423
2221
Parking
Storage
001
002
003
004
005
006
Stair
007
M1.1Parking Level
Mechanical Plan
M1.1 1/8" = 1'
Parking Level Mechanical PlanScale:
1
EF-2
MD
-1
UH-1
EF-3
B-3
B-1
Pip
ing
manifold
s
Notes this sheet:
1 UH-1 & UH-2 thermostat.
Boiler intake & exhaust air. Separate intake & exhaust per manufacturer recommendations.
Carbon monoxide detector (for control of EF-1). Place on wall at similar height as thermostat.
Mount with bottom of unit at 8' AFF min.
Required separation between garage ventilation intake and boiler exhaust.
Indicates minimum boiler clearance envelope, see manufactures installation manual for more detail.
2
2
DHW-1
ROOM LEGEND:
001
STORAGE
003
STORAGE002
MECHANICAL
004
005 ELEV. EQUIP.
006
STAIR # 2
007
008
ELEVATOR
STORAGE
EF-1
4000 cfm54x24
OA1
UH-2
B-2
CO
3
3
1T
T
T
UH-3
T
4
4
4
4
10'-0
" min
.
5
5
24x24
6
6
8"
10"
12"x12" exhaust louver
copyright 2006 Z-Group Architects
Sheet #:
Drawing Title:
Construction
Issue Date:
DATE# ISSUED FOR
Seal:
TO
WN
OF S
NO
WM
ASS V
ILLA
GE
SN
OW
MA
SS V
ILLA
GE T
OW
N H
ALL
KE
AR
NS
RO
AD
SN
OW
MA
SS
VIL
LA
GE
, C
O 8
16
15
7/21/06 30% PROGRESS SET
8/4/06 50% PROGRESS SET
8/17/06 60% PROGRESS SET
9/1/06 75% PROGRESS SET
234 E. Hopkins Ave.
ASPEN, CO 81611
970-925-1832
9/15/06 PERMIT & BID SET
9/29/06 PERMIT SET
6-4-07
11/20/06 CONSTRUCTION
502 Whiterock Ave. P.O. Box 3725Crested Butte, CO 81224(970) 349-1216www.reginc.com
ResourceEngineeringGroup, Inc.
efficiency sustainability simplicity
1/24/07 Revision #1
6/4/07 Revision #2
83
82
81
7 6 5 4 1
A
B
C
D
E
F
G
H
D
8A
8B
8C
83
81 7 6
4 3 2 1
26 25 2423
2221
Dn
Up
106
107
108
109
111113
114
112
115
118
103
116
121
119
126
124
133
132
131
155
128
129
123
104
125
127
102
101
117
122
105
134
Patrol
139
137
149
147
148
146
144
153
151154
136
14
5
143
142
152
138
141
135
M1.2First Level
Mechanical Plan
ROOM LEGEND:
RECORDS
FLEX OFFICE STORAGE
PATROL
CHIEF
SUPER
INTERVIEW
EVIDENCE
WOMEN
MEN MEETING
CENTRAL MEETING
MULTI-PURPOSE
SECURE
LOCKERS
STALL
CORRIDOR
BATH
COUNCIL CHAMBERS
PRODUCTION
COMMUNITY RELATIONS
MEETING
ATTORNEY
DEPUTY TOWN CLERK
RECEPTION
E.R.D.
LOBBY / DISPLAY
STORAGE
STORAGE / RETENTION
KITCHEN
REST ROOM
AUDIO/VISUAL
TOWN CLERK
TOWN MANAGER
TOWN ASSISTANT
FILES / PUBLIC ACCESS
JAN. CL. / STORAGE
STORAGE
MAYOR / COUNCIL
106
107
108
109
111
113
114
112
115
118
103
116
121
119
126
124
133
135
137
138
139
132
131
144
143
142
146
141
149
147
152
151
153
148128
129
123
104
COUNCIL CHAMBERS125
CORRIDOR127
CORRIDOR101
VESTIBULE100
CORRIDOR117
CELL136
CORRIDOR145
BLDG. / PLAN STORAGE122
105
STAIR # 2134
NOT USEDNOT USED STAIR # 3CORRIDOR STORAGE110 120 140 150130
STAIR # 1102
COURT CLERK154
LOBBY155
STAIR # 4156
ELEVATOR157
M1.2 1/8" = 1'
First Level Mechanical PlanScale:
1
T
T
T
T
T
T
T
T
CO2
VA
V-3
VAV-2
VA
V-6
VA
V-4
VA
V-5
VA
V-1
3
VAV-9
VA
V-1
4
VA
V-1
0
T
T
CO2
VA
V-1
1
Notes this sheet:
All ductwork located in ceiling cavity above (typ).
Place R2 return air grille above door (typ).
Indicates thermostat for associated VAV zone number. Place thermostat on wall approx. 48" AFF (typ).
Vertical duct to/from above.
Carbon dioxide detector. Place on wall at similar height as thermostat (typ).
Arrow indicates direction of airflow only (supply/return). Does not indicate diffuser aiming (typ).
Supply duct pressure sensor location.
Connect all ceiling grilles (supply or return) with 4' min. of flex duct (typ all levels).
Install smoke detector per specification 15800 2.02 in return air riser.
Approximate bottom of duct height above structural floor.
1
2
3
4
5
6
115 cfm6" neck
S1
165 cfm6" neck
S1
14" EA
22
22
22
2
2
2
3
44
2
3
5
6
28
7
14
12
11
2
10"
24x24 SA
24x24 RA
5SP-4
250 cfm8" neck
S1180 cfm6" neck
S1
250 cfm8" neck
S1
180 cfm6" neck
S1180 cfm6" neck
S1
150 cfm6" neck
S1
1730 cfm22x22 neck
R1
100 cfm6" neck
S1
165 cfm6" neck
S1
6
1100 cfm14"
S2950 cfm14"
S21100 cfm14"
S21100 cfm14"
S21100 cfm14"
S21100 cfm14"
S2
1150 cfm22x22 neck
R1
14x14
6"
4
540 cfm10"
S2540 cfm10"
S2540 cfm10"
S2
12" 12" 12"
18x18
720 cfm15x15 neck
R1
300 cfm10" neck
R1
360 cfm10" neck
S1360 cfm10" neck
S1
360 cfm10" neck
S1415 cfm10" neck
S1
415 cfm10" neck
S1
415 cfm10" neck
S1
10"
300 cfm8" neck
S1
150 cfm6" neck
S4
6"6"
250 cfm8" neck
S1
250 cfm8" neck
S1
8"
500 cfm12" neck
R1
6" 6"
150 cfm6" neck
S1
75 cfm6" neck
S1
6"
105 cfm6" neck
S1
105 cfm6" neck
S1
105 cfm6" neck
R1
150 cfm6" neck
E1
150 cfm6" neck
E1
50 cfm6" neck
E1
300 cfm10" neck
R1
1025 cfm22x22 neck
R1
50 cfm6" neck
E1
50 cfm6" neck
E1
125 cfm6" neck
E1275 cfm8" neck
S1
275 cfm8" neck
S1
275 cfm8" neck
S1400 cfm10" neck
S1
50 cfm6" neck
S6
360 cfm10" neck
R1
10" 200 cfm8" neck
S1
16x16
14"
14x14
12"
4
1
18x18
6"
10"
6"
6"
8"
24x24 SA
20x20
6"6"
4
16x16
200 cfm8" neck
R1
24x24
200 cfm8" neck
S1
300 cfm10" neck
R1
20x20
10"
10"
450 cfm12" neck
R1
12"
105 cfm6" neck
R1
150 cfm6" neck
S4
10
12"
9
16x161600 cfm22x22 neck
R1
100 cfm6" neck
E1
24x24
4
18x18
12x12
12x12
16" (typ)
24x24
10"
50 cfm6" neck
E1
50 cfm6" neck
E1
150 cfm6" neck
S1
50 cfm6" neck
S1
100 cfm6" neck
R1
100 cfm6" neck
S1
100 cfm6" neck
S1
Indicates supply air duct
Indicates return air duct
Indicates exhaust air duct
50 cfm6" neck
E1
2
10"
6"
12"
10x8
16x16
10"10"
8"
8"
12"
8"
8"
12"
6"
6"
12"
10"
10"
10" 6"
150 cfm6" neck
S1
6"
1310"
24x24 RA
4
10"
T
8"
24x24
T 4
14x14
8"
8"
12"
T
(typ)
BOD 11'
SP4T
10'9" 10'9"
10'9"
10'9"
10'6"
12'
11'6"11'2"
12'2"
11'
12'10'
10'
10'
10'
11'2"
11'
10'10'
10'
11'
11'
11'
11'11'4'
10'10"
10'6"
12'
12'6"12'2"
10'6"
12'4"
13'
11'
12'
11'10"
11'2"
10'
10'6"
11'
10'6"
12'2"
11'5"
11'
12'1"
11'
(typ)10'9"
12'6"
12'4"
11'2"
11'1"
12'6"
12'
11'
12'
11'
10'6"
11'
10'2"
11'6"
11'
12'6"
11'
12'6"
10'6"
11'6"
11'
11'
11'6"
XX'X"
50 cfm6" neck
E2
CO2 5
5
7
7P
7P
6"
VA
V-1
2
4
12x12
8
8
9
9
copyright 2006 Z-Group Architects
Sheet #:
Drawing Title:
Construction
Issue Date:
DATE# ISSUED FOR
Seal:
TO
WN
OF S
NO
WM
ASS V
ILLA
GE
SN
OW
MA
SS V
ILLA
GE T
OW
N H
ALL
KE
AR
NS
RO
AD
SN
OW
MA
SS
VIL
LA
GE
, C
O 8
16
15
7/21/06 30% PROGRESS SET
8/4/06 50% PROGRESS SET
8/17/06 60% PROGRESS SET
9/1/06 75% PROGRESS SET
234 E. Hopkins Ave.
ASPEN, CO 81611
970-925-1832
9/15/06 PERMIT & BID SET
9/29/06 PERMIT SET
6-4-07
11/20/06 CONSTRUCTION
502 Whiterock Ave. P.O. Box 3725Crested Butte, CO 81224(970) 349-1216www.reginc.com
ResourceEngineeringGroup, Inc.
efficiency sustainability simplicity
1/24/07 Revision #1
6/4/07 Revision #2
83
82
81
7 6 5 4 1
A
B
C
D
E
F
G
H
D
8A
8B
8C
83
81 7 6
4 3 2 1
26 25 2423
2221
REF REF
225
226
227
203
209
218
207
208
211
217
215
214
206
212
204
205
221
202
228
239
219
222
243 244 245
241
238
236
235
249
251
248
247246
232
229
231
213
216
252
201 233
210
230
234
223
224
220
239
242
M1.3Second Level
Mechanical Plan
M1.3 1/8" = 1'
Second Level Mechanical PlanScale:
1
T
T
T
T
T
T
T
T
T
VAV-15
VA
V-1
8
T
VA
V-2
1
VA
V-2
5
VA
V-2
7V
AV
-28
EA from below
Notes this sheet:
All ductwork located in ceiling cavity above (typ).
Place R2 return air grille above door (typ).
Vertical wall penetration to/from RTU on flat roof beyond. See sheet M1.4.
Vertical duct run to/from below.
Not used.
Not used.
Return air connection to air handler above.
Supply or return diffuser, view obstructed by ducts above.
Carbon dioxide detector. Place on wall at similar height as thermostat (typ).
Pressure sensor for control of relief air dampers.
Approximate bottom of duct height above structural floor.
1
2
24x24 RA
3
2
24x24 RA
14" EA
3
2
2
2
2
4
10" To EF on roof above (6" connects from below)
24x24
4
15
16
18
26
2122
20
23
25
17
18x18
27
6"
8
5
200 cfm6" neck
S1
270 cfm8" neck
S1
270 cfm8" neck
S1
675 cfm12" neck
R1
130 cfm6" neck
S1
130 cfm6" neck
S1
130 cfm6" neck
S1
130 cfm6" neck
S1
165 cfm6" neck
S1
270 cfm8" neck
R1
200 cfm8" neck
R1
200 cfm8" neck
R1
100 cfm6" neck
S1
6"
200 cfm6" neck
S1
200 cfm6" neck
S1
150 cfm6" neck
S1
350 cfm8"
S2
1425 cfm22x22 neck
R1
14"
6
250 cfm8" neck
S1
100 cfm6" neck
E150 cfm6" neck
E1
500 cfm12" neck
R1
360 cfm10" neck
R1
50 cfm6" neck
E1
50 cfm6" neck
E1
1625 cfm48x24
R3
7
150 cfm6" neck
S1
125 cfm6" neck
S1
125 cfm6" neck
S1125 cfm6" neck
S1 225 cfm6" neck
S1
150cfm6" neck
R1
600 cfm12" neck
R1
125 cfm6" neck
R1
225 cfm8" neck
R1
2800 cfm48x30
R3
2800 cfm48x30
R3
12"
250cfm8" neck
S1150cfm6" neck
S1150cfm6" neck
S1150cfm6" neck
S1
150cfm6" neck
S1
100cfm6" neck
S1
125cfm6" neck
S1
150cfm6" neck
S1
145cfm6" neck
S1
115cfm6" neck
S1
125 cfm6" neck
R1
24x24
14"
24x24 SA
4
14"
350 cfm8"
S2
350 cfm8"
S2
180 cfm6" neck
S1
2000 cfm48x24
R3
EF-6
2000 cfm30x18
S5
Plenum: 4'-6"x4'x2'
10"
180 cfm6" neck
S1
28x28
24x24
16x16
150 cfm6" neck
R1
200 cfm6" neck
S1
28x28
225 cfm8" neck
S1
225 cfm8" neck
S1
75 cfm6" neck
E1
Indicates supply air duct
Indicates return air duct
Indicates exhaust air duct
14"
100 cfm6" neck
R1
14"
8"
6"
10" 10"6" typ
18x18
4
12"
12x12
12"
18x18
4
12"
12x12
6"
6"
14"
10"
30
X3
014"
14"
8"
T
VA
V-7
T
24x24
VAV-20
12"
1
VA
V-2
2
11'11'
12'
12'
11'
11'
12'9"
10'6"
14'6"
11'
14'6"
12'
12'
12'
11' 8"
100 cfm6" neck
S1
VA
V-8
26x26
14'9"
24x24
8
11'9"
12'
11'
10'
11'
11'
4
8
11'
11'
11'
11'
11'
11'
11'
11'
11'
11'
11'
13'4"
12'6"
12'4"
12'2"
11'
8
8
XX'X"
SP-2
88
CO2
9
9
250 cfm8" neck
S1
125 cfm6" neck
S1
VA
V-1
7
314'2"
14'2"
11'VA
V-1
6
14"
14"
7
42x26
3
40X40
10'6"10'6"
14'9"
10'6"
3
VAV-19
19
10'
T
14"
10"
Plenum: 9'x4'x2'-6"
P
10
10
ROOM LEGEND:
GROUP SALES
MEDIA
MEETING / SHARED
TOILET
TOILET
JANITOR CLOSET
LOBBY MEZZANINE
DECK
IT TECH. OFFICE
IT / SERVER ROOM
GROUP SALES
NOT USED
CODE INSPECTOR
BUILDING DIRECTOR
BUILDING INSPECTOR
DECK
STAFF BREAK
PLANNING DIRECTOR
SENIOR PLANNER
PLAN TECH
PLAN TECH
COPY / PRINT
CORRIDOR
MEETING
RECEPTION
CORRIDOR
VESTIBULE
FINANCE OFFICE
FINANCE DIRECTOR
GROUP SALES DIRECTOR
GROUP SALES
GROUP SALES
ELEVATOR
MARKETING
GROUP SALES
225
226
227
203
209
218
207
208
211
217
215
214
206
212
204
205
221
CORRIDOR202
CORR.228
FILE / COPY239219
224
223
222
243
244
245
241
242
238
236
235
249
251
248
247
246
233
232
234
229
231
237
PLAN TECH213
BUILDING INSPECTOR216
252
STAIR # 1201
CORRIDOR NOT USED STAIR # 5210 NOT USED240220 250230NOT USED200
FINANCE OFFICE
FINANCE OFFICE
FINANCE OFFICE
FINANCE OFFICE
SP2T
VA
V-2
6
12"12'
225 cfm8" neck
S1
125 cfm6" neck
S1
150cfm6" neck
S1
150cfm6" neck
S1
150cfm6" neck
S1
12"
12'6"
6"
6"
10'6"
1450cfm22x22" neck
R1
16
x1
6
18x18 12"
VA
V-2
3
150cfm6" neck
S1
125cfm6" neck
S1
125cfm6" neck
S1
125cfm6" neck
S1
10"
12'2"
100 cfm6" neck
S1
14"
10"
11'
11'
copyright 2006 Z-Group Architects
Sheet #:
Drawing Title:
Construction
Issue Date:
DATE# ISSUED FOR
Seal:
TO
WN
OF S
NO
WM
ASS V
ILLA
GE
SN
OW
MA
SS V
ILLA
GE T
OW
N H
ALL
KE
AR
NS
RO
AD
SN
OW
MA
SS
VIL
LA
GE
, C
O 8
16
15
7/21/06 30% PROGRESS SET
8/4/06 50% PROGRESS SET
8/17/06 60% PROGRESS SET
9/1/06 75% PROGRESS SET
234 E. Hopkins Ave.
ASPEN, CO 81611
970-925-1832
9/15/06 PERMIT & BID SET
9/29/06 PERMIT SET
6-4-07
11/20/06 CONSTRUCTION
502 Whiterock Ave. P.O. Box 3725Crested Butte, CO 81224(970) 349-1216www.reginc.com
ResourceEngineeringGroup, Inc.
efficiency sustainability simplicity
1/24/07 Revision #1
6/4/07 Revision #2
83
82
81
7 6 5 4 1
A
B
C
D
E
F
G
H
D
8A
8B
8C
83
81 7 6
4 3 2 1
26 25 2423
2221
CURVED ROOF
CURVED ROOF
DECK BELOW
?:1
2
?:1
2
?:12?:12
?:1
2
DECKBELOW
CURVED ROOF
EF-4
Notes this sheet:
Insulate all exterior duct work to R-15 min. (typ). See Division 15 spec. for more detail.
Duct work penetrates vertical wall into cavity above upper level ceiling.
Return air intake at bottom of unit.
Dashed line indicates outline of required access/clearance envelope (typ).
Install smoke detector per specification 15800 2.02 in return air plenum of unit.
1
2
3
SP-1
M1.4Roof
Mechanical Plan
M1.4 1/8" = 1'
Roof Mechanical PlanScale:
1
EF-5(maintain 10' min. from intake air)
4
AHU-2
1'-6
"
SP-3
1'-6
"
3'-0"
2
AHU-1
5'-0
"4'-0"
4'-0"5'-0
"
2
4
1
3
Transition to 50x30 for curb penetration
2 2
4'-0"
6'-
0"
4'-
0"
4'-0"
4
1'-
6"
30°
9'-11"
2'-9
"
7'-2"
5'-0
"
2'-1"
1'-8
"
2'-1
0"
4"
1'-6"3'-0"
5
5
5
copyright 2006 Z-Group Architects
Sheet #:
Drawing Title:
Construction
Issue Date:
DATE# ISSUED FOR
Seal:
TO
WN
OF S
NO
WM
ASS V
ILLA
GE
SN
OW
MA
SS V
ILLA
GE T
OW
N H
ALL
KE
AR
NS
RO
AD
SN
OW
MA
SS
VIL
LA
GE
, C
O 8
16
15
7/21/06 30% PROGRESS SET
8/4/06 50% PROGRESS SET
8/17/06 60% PROGRESS SET
9/1/06 75% PROGRESS SET
234 E. Hopkins Ave.
ASPEN, CO 81611
970-925-1832
9/15/06 PERMIT & BID SET
9/29/06 PERMIT SET
6-4-07
11/20/06 CONSTRUCTION
502 Whiterock Ave. P.O. Box 3725Crested Butte, CO 81224(970) 349-1216www.reginc.com
ResourceEngineeringGroup, Inc.
efficiency sustainability simplicity
1/24/07 Revision #1
6/4/07 Revision #2
M2.0Schedules
Diffuser ScheduleID Description Manufacturer & Model Notes
E1 Exhaust air grille Titus PAR-XXxXX-12x12-3-26-AG-75 Neck size varies, see plan, damper included
E2 Cell ceiling exhaust grille Titus SG-SD-10-10-0-6-26-DR-XX-XX-XX Maximum security, suicide deterrent, white finish, damper included
OA1 Outside air grille Greenheck ESK-402 Paintable finish, provide bird & insect screen, no damper
S1 Square 24" lay-in ceiling supply diffuser Titus TMS-x-24x24-3-26-AG-75-IB Neck size varies, see plan, damper included
S2 Nozzle supply diffuser Air Concepts aluminum ANC-RP Clear anodized aluminum finish, in-duct damper see plan for location
S3 Not used
S4 Square 12" lay-in ceiling supply diffuser Titus TMS-x-12x12-3-26-AG-75-IB Neck size varies, see plan, damper included
S5 Rectangular wall supply diffuser Titus 271-FL-1-26 Surface mount, white finish, no damper
S6 Cell ceiling supply diffuser Titus SG-SD-10-10-0-6-26-DR-XX-XX-XX maximum security, suicide deterrent, white finish, damper included
R1 Square 24" lay-in ceiling return grille Titus PAR-XXxXX-24x24-3-26 Neck size varies, see plan, no damper
R2 Return air transfer grille Titus 355RL-XxX-X-1-26 Surface mount, white finish, no damper
R3 Wall return grille Titus 23R-L-XxX-1-26 Surface mount, white finish, no damper
See Division 15050 3.13 3.14 Zone Heat Heat Supply Tube Zone Pipe Loop # Loop Loop Supply/Return Distance Supply/Return Total Zone Zone
for additional notes Area provided provided Water spacing Tubing dia. Length of Head Flow Pipe round trip Head Head Flow
per zone per sq. ft. temp length (HePex) Loops Loss (each) dia. & material to zone manifold Loss Loss (tot.)
ID Location Construction ft2 kBtu/h btu/h/ft2 deg F in o.c. ft in ft ft H2o GPM ft ft H20 ft H20 GPM
S1 Roads Concrete 7175 1,292 180 120 10 8800 1 400 22 17.0 4.8 90mm Ecoflex 300 12.0 29.0 105.7
S2 Sidewalk beside road Concrete 440 79.2 180 120 10 600 1 300 2 9.0 3.6 32mm Ecoflex 300 15.5 24.5 7.2
S3 Sidewalk to front entry Concrete 991 178 180 120 10 1200 1 300 4 9.0 3.6 1-1/2" copper 120 3.1 12.1 14.4
S4 Sidewalk from road to building Concrete 315 56.7 180 120 10 375 1 375 1 15.1 4.5 1" Copper 120 1.9 17.0 4.5
S5 Northeast entryway Concrete 327 58.9 180 120 10 400 1 400 1 17.0 4.8 32mm Ecoflex 220 5.6 22.6 4.8
Snowmelt Zone Schedule
Flow Delta P
ID Description Manufacturer & Model Voltage Phase W/HP RLA (gpm) (ft H20)
P-1 System 1 primary pump with variable voltage control Grundfos UPS 40-80/4 230 3 1/2 HP 1.45 44 10
P-2 B-1 boiler pump Grundfos UP 26-99F 115 1 245 W 2.15 20 15
P-3 Domestic hot water pump Grundfos UPS 15-58FC speed 3 115 1 80 W 0.75 10 8
P-4 B-2 boiler pump Included with boiler --- --- --- --- --- ---
P-5 B-3 boiler pump Grundfos UP 26-99F 115 1 245 W 2.15 20 15
P-6 System 2 primary pump with VFD drive Grundfos TP 80-160 with reduced face seal for glycol 460 3 3 HP --- 137 30
P-7 DHW Recirculation pump Grundfos 15-10B7 115 1 25 W 0.23 5 5
Pump Schedule
Note: Feet of head and supply/return distances are estimates to aid in material estimate and system balancing. Provide stated loop flows and zone flows when balancing system as a minimum.Tubing bury depth: 2-1/2” max. (+/- 1/2” variation is anticipated)
Additional Mechanical Equipment Schedule
ID Description Manufacturer & Model Notes
BV-1 System #1 loop pressure relief bypass valve Danfoss 1" AVDO25 Operating range: 0 to 30 psi. Initial setting = 10 psi.
BV-2 System #2 loop pressure relief bypass valve Watts ACV F116, 2" dia. Operating range: 0 to 30 psi. Initial setting = 16 psi.
DHW-1 Domestic hot water tank HTP UltraStor SSU-60 60 gal insulated side-arm hot water heater
MD-1 Make-up air motorized damper Greenheck VCD-23 24x24 w/ Belimo LF24-SR actuator Paintable finish, low leakage damper
Hydronic Loop ScheduleID Description Air Separator Expansion Tank % antifreeze by vol. f.p. (deg F) burst p. operating psi relief psi
XT-1 Hydronic System 1: VAV reheat & DHW Spirothrem Spirovent VJR200TM State ET-14 o 32 32 15 30
XT-2 Hydronic System 2: AHU & UH coils & snowmelt zones Spirothrem Spirovent VSR400FL Amtrol Extrol AX-120(V) 50% propylene glycol -27 -60 15 30
VAV ID Description Manufacturer & Model min. cfm max. cfm Coil cpcy (kBtu/hr) Coil gpm ft. Head Coil rows Circuit
1 Not used n/a n/a n/a n/a n/a - n/a
2 Admin south Carrier 35EC10 290 1040 14224 3.0 1.5 1 A
3 Admin west Carrier 35EC06 110 265 5264 2.0 1.8 1 A
4 Admin meeting Carrier 35EC06 110 430 5096 0.5 0.2 1 A
5 Admin reception Carrier 35EC10 290 1150 14952 3.0 1.5 1 A
6 Admin storage Carrier 35EC06 110 400 6048 1.0 0.5 1 A
7 Council chambers (124) Carrier 35EC12 420 1620 10388 0.5 0.1 1 D
8 Lobby Carrier 35EC2416 1400 5500 40320 2.0 0.5 1 D
9 Police clerk Carrier 35EC12 420 1605 14588 1.0 0.3 1 B
10 Police meeting Carrier 35EC08 185 710 7000 0.5 0.2 1 B
11 Police super/chief Carrier 35EC08 185 600 6664 0.5 0.2 1 B
12 Police patrol Carrier 35EC10 290 1025 13160 2.0 0.7 1 B
13 Police lockers & bathrooms Carrier 35EC06 110 375 4816 0.5 0.2 1 B
14 Police northwest Carrier 35EC06 110 450 6328 1.0 0.5 1 B
15 Westwing, south facing Carrier 35EC08 185 740 9912 2.0 2.5 1 C
16 Westwing, west facing Carrier 35EC08 185 685 9912 2.0 2.5 1 C
17 Westwing meeting Carrier 35EC08 185 700 8680 1.0 0.7 1 C
18 Westwing, east facing & stairs Carrier 35EC10 290 1350 15624 3.0 1.5 1 C
19 Staff breakroom Carrier 35EC08 185 860 7392 0.5 0.2 1 C
20 Eastwing, south facing Carrier 35EC08 185 700 7000 0.5 0.2 1 D
21 Eastwing, east office Carrier 35EC06 110 250 4256 0.5 0.2 1 D
22 Eastwing, south core Carrier 35EC10 290 1200 10920 1.0 0.2 1 D
23 Eastwing, north core Carrier 35EC08 185 600 6664 0.5 0.2 1 D
24 Not used (Server room see SP-2) n/a - - - - - - -
25 Eastwing, north facing Carrier 35EC08 185 750 10752 3.0 5.1 1 D
26 IT Office Carrier 35EC04 50 125 3024 0.5 0.2 1 D
27 Mezzanine/Library Carrier 35EC08 110 675 5264 0.5 0.2 1 D
28 Council chambers (125) Carrier 35EC08 185 720 7000 0.5 0.2 1 D
VAV Terminal Schedule
Heating & Cooling Equipment ScheduleID Description Cooling Capacity Heating Capacity Manufacturer & Model cfm esp Phase Voltage FLA Fuse/MOCP
AHU-1 West area air handler 13 tons 150 kBtu/hr Carrier Size 17 39MW, 7.5 HP supply fan 5 HP return fan 7500 1.25 3 460 ---- ----
AHU-2 Conference, Lobby & East area air handler 29 tons 295 kBtu/hr Carrier Size 36 39MW, 15 HP supply fan, 10 HP return fan 16500 1.25 3 460 ---- ----
(include 24" tall vibration isolation curb)
B-1 Hydronic System 1 gas fired boiler, condensing-modulating unit n/a 226 kBtu/hr Triangle Tube Prestige Solo 250 n/a n/a 1 115 ---- ----
B-2 Hydronic System 2 gas fired boiler, condensing-modulating unit n/a 1,758 kBtu/hr Laars 2400 Rheos + n/a n/a 1 115 ---- ----
B-3 Hydronic System 2 gas fired boiler, condensing-modulating unit n/a 226 kBtu/hr Triangle Tube Prestige Solo 250 n/a n/a 1 115 ---- ----
C-1 Condenser for AHU-1 15 tons n/a Carrier 38ARD016 11000 n/a 3 460 37 117
C-2 Condenser for AHU-2 30 tons n/a Carrier 38AH34 35000 n/a 3 460 62 90
SP-1 Split unit mulit-zone outdoor compressor w/ low ambient controls 2 tons n/a Carrier 38HDF024-3 n/a n/a 3 208/230 15.1 30
SP-2 IT/Server indoor wall mounted unit 2 tons n/a Carrier 40QNC01824-3 1120 n/a 3 208/230 0.38 15
SP-3 Split unit mulit-zone outdoor compressor 1 tons n/a Carrier 38HDV012-3 n/a n/a 3 208/230 5.5 15
SP-4 Audio/Visual terminal unit 1 tons n/a Carrier 40QNC012-3 500 n/a 3 208/230 0.28 15
UH-1 Ceiling mounted hydronic unit heater n/a 110 kBtu/hr Reznor WS 190/238 2800 n/a 1 115 3.4 ---
UH-2 Ceiling mounted hydronic unit heater n/a 110 kBtu/hr Reznor WS 190/238 2800 n/a 1 115 3.4 ---
UH-3 Ceiling mounted hydronic unit heater n/a 40 kBtu/hr Reznor WS 60/85 1250 n/a 1 115 1.9 ---
ID Description Location Manufacturer & Model cfm esp Voltage Phase W/HP RLA
EF-1 Garage ventilation wall mounted fan Garage exterior wall Cook 20XLP 4000 0.1 115 1 1/2 HP ---
EF-2 Elevator room exhaust fan Elevator room Cook Gemini GC-162 160 0.25 115 1 113 W 1
EF-3 Mechanical room exhaust fan Mechanical room Cook Gemini GC-162 160 0.25 115 1 113 W 1
EF-4 Westwing exhaust fan Roof Cook 80 ACE-B 350 0.4 115 1 1/6 HP ---
EF-5 Eastwing exhaust fan Roof Cook 100 ACE-B 650 0.5 115 1 1/6 HP ---
EF-6 Council Chambers auxillary circulation fan Above room 227 CookTBD-9 2000 0.25 115 1 1/4 HP ---
Note: include backdraft damper with all exhaust fans.
Exhaust Fan Schedule
Note: Boiler capacities based on project altitude of 8200 ft above sea level, gas content of 1076 btu/ccf and gas specific gravity of 0.635 (per natural gas supplier)
Submittals requried for all equipment listed on this schedule prior to purchase or installation. These documents to be included with the O&M manuals per specification 15050 1.04A. & 1.08.
copyright 2006 Z-Group Architects
Sheet #:
Drawing Title:
Construction
Issue Date:
DATE# ISSUED FOR
Seal:
TO
WN
OF S
NO
WM
ASS V
ILLA
GE
SN
OW
MA
SS V
ILLA
GE T
OW
N H
ALL
KE
AR
NS
RO
AD
SN
OW
MA
SS
VIL
LA
GE
, C
O 8
16
15
7/21/06 30% PROGRESS SET
8/4/06 50% PROGRESS SET
8/17/06 60% PROGRESS SET
9/1/06 75% PROGRESS SET
234 E. Hopkins Ave.
ASPEN, CO 81611
970-925-1832
9/15/06 PERMIT & BID SET
9/29/06 PERMIT SET
6-4-07
11/20/06 CONSTRUCTION
502 Whiterock Ave. P.O. Box 3725Crested Butte, CO 81224(970) 349-1216www.reginc.com
ResourceEngineeringGroup, Inc.
efficiency sustainability simplicity
1/24/07 Revision #1
6/4/07 Revision #2
Hose fitting for system fill
Air Vent
Hydronic loop
Ball Valve
See Hydronic Loop Schedule for
expansion tank, fluid properties &
operating pressure
PLow loop pressure
measurement point
Reduced pressure backflow preventer
Note: portable glycol feeder will be
needed for filling loops with glycol.
Pump Ball ValveBall Valve
TPTP
Flanged fittings
All wet rotor pumps must have
motor shaft mounted horizontally
M2.1 NTS
Pump detail (typ)Scale:
5
M2.1 NTS
Fill kit & expansion tank detail (typ)Scale:
6
M2.1Details
B-1
M2.1 NTS
Hydronic system 2: AHU/UH/SnowmeltScale:
3
VAVreheat
coil
S
VA
V c
ircu
it A
VA
V c
ircu
it B
VA
V c
ircu
it C
VA
V c
ircu
it D
VA
V c
ircu
it A
VA
V c
ircu
it B
VA
V c
ircu
it C
VA
V c
ircu
it D
P-1
P-2
VAVreheat
coil
VAVreheat
coil
VAVreheat
coil
M2.1 NTS
VAV hydronic reheat schematicScale:
2
M2.1 NTS
Hydronic System 1: VAV reheat/DHWScale:
1
BV-1 psi setting per
schedule (typ @ VAV circuits)
1-1
/4"
1-1
/4"
1-1
/4"
1-1
/2"
1-1
/4"
1-1
/4"
1-1
/4"
1-1
/2"
1-1/2"
Set balancing valve for design flow listed on supply leg
2"
1" typical (3/4" ok for 06 box size)
XT-1
T
6
M2.1
T
From mech room
To mech room
DHW-1
T
DHW
P-7
CW
DHWR
P-3
B-2
B-3
P-6
AH
U-1
AH
U-2
UH
-1&
2
UH
-3
M2.1 NTS
Snowmelt manifold detailScale:
4
2"
2-1
/2"
2"
1"
Set balancing valve to provide design flow (typ)Balancing valve to be same dia. as pipe served
AH
U-1
AH
U-2
UH
-1&
2
2"
2-1
/2"
2"
5
M2.1
P-5
P-4(inside boiler)
SSSS
Modulating control valve
T T
T
4"
P
P P
UH
-31
"S
S S S
1-1/2"
XT-2
S1 S2 S3 S4 S5
See Snowmelt zone schedule for snowmelt supply/return piping size and material
4"
4"
S1 S2 S3 S4 S5
S
T
S
T
S
T
S
T
Slab temperature sensor required for each snowmelt zone
BV-2 psi setting per schedule
2"2"
1-1/2"
1-1/2"4"
4"
9.5 gpm
8.5 gpm
10 gpm
16 gpm
P
55 gpm
36 gpm
6.5 gpm
22 gpm
Pipe sizing per schedule
From mech room
To mech room
Set balancing valve for design flow per schedule, include P/T port for diagnostics
Note: Shutoff isolation valves required at all removable equipment per Div 15 specifications(typ all details)
To/from snowmelt zone. Number of loops & pipe sizing per schedule. Use serpentine tubing layout pattern.
Modulating solenoid control valve
T