Post on 12-Jan-2016
PowerPoint Presentation
3D Utility Data Reducing Project Delays, Managing AssetsWASHTO 20151Impacts of Utility ConflictsProject ScheduleChange OrdersCost OverrunsWorker SafetyTraffic DelaysEconomic CostsPolitical Challenges
3D Utility Location Data RepositoryPlatform independent databaseAccept data from CAD, SUE & 3rd partiesGatekeeper functionSource for future CAD, GIS, 3rd parties
UDOTs 3D Utility Location Data RepositoryArchitecture
3D Utility Location Data RepositoryApproachAdvisory Panel CAD, GIS, Survey, Construction, Utilities, Permits, FHWAConsultant ResourcesASCE 38-02 Standards SUE, As-builtOracle Spatial DatabaseData mapping to Bentley SUEData input from Bentley SUEData input through UPLAN (ESRI GIS)
3D Utility Location Data RepositoryApproachData CollectionTrenchlessOpen cutSurfaceOverheadRemote sensing and spatial positioning (LIDAR)Metadata
Courtesy of CUES, Inc.3D Utility Location Data RepositoryApproach
Source: Michigan DOT Guide Project (2014 data)3D Utility Location Data RepositoryApproach
Positional Standards3D Utility Location Data RepositoryApproachStandardize data attributes, definitions, metadata
3D Utility Location Data RepositoryApproachMapping to Bentley SUE
3D Utility Location Data RepositoryApproach3D Design
3D Utility Location Data RepositoryFunding & SchedulePhase I STIC funding$125KNTP Feb 4, 20156 Month Delivery
Phase IISHRP2 R01A fundingUp to $400KWaiting for FHWA contract18 month Delivery3D Utility Location Data RepositoryLessons LearnedDifficulty working through DTSConsultant procurementengineering vs IT focus
Access to state database denied for off-site development
Scheduling of DTS resources limited resources, competition with other projects
3D Utility Location Data RepositoryLessons LearnedCommunication Between Different Technical GroupsEngineersSurveyorsPermitsDatabase ManagersGISSUECADDUtility Companies3D Utility Location Data RepositoryLessons LearnedChange ManagementNew standards (CAD, as-built)
3D design
Digital project delivery
Collection of as-builts (construction & permits)
3D Utility Location Data RepositoryLessons LearnedLegal authority to require utilities to provide data
Data security/ownership
Chain of custody/changes
Defining and resourcing gate-keeper3D Utility Location Data RepositoryReturn on InvestmentConstructionDigital plan delivery
Work sequencing
Collection of as-built data
Minimizing project risks
Work safety
3D Utility Location Data RepositoryReturn on InvestmentDesignReuse SUE and as-built data
Reduce new data collection costs
3D conflict analysis & resolution
Digital project delivery
3D Utility Location Data RepositoryReturn on Investment3D Design Garden City, UT
3D Utility Location Data RepositoryReturn on InvestmentOperationsMaintenance work
Permitting decisions
Emergencies
3D Utility Location Data RepositoryReturn on InvestmentPlanningAsset managementScoping & budgeting for Transportation projectsUtility projectsMunicipal projects
3D Utility Location Data RepositoryNext StepsComplete phase I August 2015
Start Phase II Fall 2015
Focus on business processes for collecting as-built data
Integrate on-line permitting system3D Utility Location Data RepositorySummaryUse of SUE on projects has reduced risk3D Utility data will extend risk reductionRetain initial data collection investment for future useStorage for data as opportunities occurIncorporate 3rd party data into repositoryAdded value for use in operations
3D Utility Location Data RepositorySummaryDelivering projects on time and within budget
Contact InformationRichard Manser, P.E.Statewide Utilities and Railroads EngineerUtah Department of Transportationrmanser@utah.gov801.965.4083
25This concludes our presentation. Here is our contact information.
25