Post on 08-Feb-2018
7/22/2019 2014 - Including VAT
1/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
1
7/22/2019 2014 - Including VAT
2/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
2
7/22/2019 2014 - Including VAT
3/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
3
7/22/2019 2014 - Including VAT
4/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
4
7/22/2019 2014 - Including VAT
5/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
5
7/22/2019 2014 - Including VAT
6/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
6
7/22/2019 2014 - Including VAT
7/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
7
7/22/2019 2014 - Including VAT
8/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
8
7/22/2019 2014 - Including VAT
9/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
9
7/22/2019 2014 - Including VAT
10/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
10
7/22/2019 2014 - Including VAT
11/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
11
7/22/2019 2014 - Including VAT
12/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
12
7/22/2019 2014 - Including VAT
13/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
13
7/22/2019 2014 - Including VAT
14/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
14
7/22/2019 2014 - Including VAT
15/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
15
7/22/2019 2014 - Including VAT
16/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
16
7/22/2019 2014 - Including VAT
17/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
17
7/22/2019 2014 - Including VAT
18/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
18
7/22/2019 2014 - Including VAT
19/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
19
7/22/2019 2014 - Including VAT
20/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
20
7/22/2019 2014 - Including VAT
21/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
21
7/22/2019 2014 - Including VAT
22/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
22
7/22/2019 2014 - Including VAT
23/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
23
7/22/2019 2014 - Including VAT
24/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
24
7/22/2019 2014 - Including VAT
25/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
25
7/22/2019 2014 - Including VAT
26/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
26
7/22/2019 2014 - Including VAT
27/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
27
7/22/2019 2014 - Including VAT
28/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
28
7/22/2019 2014 - Including VAT
29/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
29
7/22/2019 2014 - Including VAT
30/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
30
7/22/2019 2014 - Including VAT
31/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
31
7/22/2019 2014 - Including VAT
32/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
32
7/22/2019 2014 - Including VAT
33/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
33
7/22/2019 2014 - Including VAT
34/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
34
7/22/2019 2014 - Including VAT
35/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
35
7/22/2019 2014 - Including VAT
36/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
36
7/22/2019 2014 - Including VAT
37/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
37
7/22/2019 2014 - Including VAT
38/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
38
7/22/2019 2014 - Including VAT
39/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
39
7/22/2019 2014 - Including VAT
40/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
40
7/22/2019 2014 - Including VAT
41/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
41
7/22/2019 2014 - Including VAT
42/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
42
7/22/2019 2014 - Including VAT
43/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
43
7/22/2019 2014 - Including VAT
44/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
44
7/22/2019 2014 - Including VAT
45/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
45
7/22/2019 2014 - Including VAT
46/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
46
7/22/2019 2014 - Including VAT
47/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
47
7/22/2019 2014 - Including VAT
48/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
48
7/22/2019 2014 - Including VAT
49/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
49
7/22/2019 2014 - Including VAT
50/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
50
7/22/2019 2014 - Including VAT
51/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
51
7/22/2019 2014 - Including VAT
52/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
52
7/22/2019 2014 - Including VAT
53/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
53
7/22/2019 2014 - Including VAT
54/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
54
7/22/2019 2014 - Including VAT
55/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
55
7/22/2019 2014 - Including VAT
56/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
56
7/22/2019 2014 - Including VAT
57/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
57
7/22/2019 2014 - Including VAT
58/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
58
7/22/2019 2014 - Including VAT
59/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
59
7/22/2019 2014 - Including VAT
60/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
60
7/22/2019 2014 - Including VAT
61/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
61
7/22/2019 2014 - Including VAT
62/252
ITEM
NODESCRIPTION UNIT
RATE INCLUDING
VAT
Y-001 Transport of metal, sand,gravel and earthbeyond 10 km per km, rate for one cube. km 102.00
Y-002 Transport of cement beyond 10 km per
km, rate for one bag (50kg) km 1.02
Y-003 Transport of steel beyond 10 km per km,
rate for 1000kg. km 20.40
Y-004 Transport of bricks beyond 10 km per km,
rate for 1000Nos. km 51.00
Y-005 Transport of calicut tile beyond 10 km per
km, rate for 1000Nos. km 51.00
A.) Head transport of materials:
Note:-
Cement
A1. High steep areas (Nominal ground slope more
than 20% ) Beyond 30 m , and there after every100m or it's portion
50kg
0.05 X unskilled labour
rate per day.
A2. Modarate Steep areas (Nominal ground slope
10% to 20% ) Beyond 30 m , and there after
every 100m or it's portion50kg
0.03 X unskilled labour
rate per day.
A3. Flat areas (Nominal ground slope up to 10% )
Beyond 30 m , and there after every 100m or
it's portion50kg
0.02 X unskilled labour
rate per day.
SECTION XIV- SCHEDULE OF TRANSPORT
According to the head transport as per report of central provincial council
price committee 2014 .
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
62
7/22/2019 2014 - Including VAT
63/252
ITEM
NODESCRIPTION UNIT
RATE INCLUDING
VAT
Sand , Metal and Soil
A4. High steep areas (Ground slope more than 20%
) Beyond 30 m , and there after every 100m or
it's portion
cu
a.) Normal ground :-
3 X unskilled labour rate
per day
b.) Difficult ground :-
4 X unskilled labour rate
per day
A5. Modarate Steep areas (Ground slope 10% to
20% ) Beyond 30 m , and there after every
100m or it's portion
cu
a.) Normal ground :-
2 X unskilled labour rate
per day
b.) Difficult ground :-
3 X unskilled labour rate
per day
A6. Flat areas ( Ground slope up to 10% ) Beyond
30 m , and there after every 100m or it's portion
cu
a.) Normal ground :-
1 X unskilled labour rate
per day
b.) Difficult ground :-
2 X unskilled labour rate
per day
Bricks
A7. High steep areas (Nominal ground slope more
than 20% ) Beyond 30 m , and there after every
100m or it's portion 1000 nr
2.0 X unskilled labour rate
per day
A8. Modarate Steep areas (Nominal ground slope
10% to 20% ) Beyond 30 m , and there after
every 100m or it's portion 1000 nr
1.0 X unskilled labour rate
per day
A9. Flat areas (Nominal Ground slope up to 10% )
Beyond 30 m , and there after every 100m or
it's portion 1000 nr
0.5 X unskilled labour rate
per day
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
63
7/22/2019 2014 - Including VAT
64/252
ITEM
NODESCRIPTION UNIT
RATE INCLUDING
VAT
Steel
A10. High steep areas (Nominal ground slope more
than 20% ) Beyond 30 m , and there after every
100m or it's portion Mt
2.0 X unskilled labour rate
per day
A11. Modarate Steep areas (Nominal ground slope
10% to 20% ) Beyond 30 m , and there after
every 100m or it's portion Mt
1.0 X unskilled labour rate
per day
A12. Flat areas (Nominal Ground slope up to 10% )
Beyond 30 m , and there after every 100m or
it's portion Mt
0.5 X unskilled labour rate
per day
B.) Add only overhead and profit for the above head transport item
* Total head transport rate = A + B
Example :-Consider head transport item A5.
(Normal ground :- 2 X unskilled labour rate per day) + (overhead and profit )
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
64
7/22/2019 2014 - Including VAT
65/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
65
7/22/2019 2014 - Including VAT
66/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
66
7/22/2019 2014 - Including VAT
67/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
67
7/22/2019 2014 - Including VAT
68/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
68
7/22/2019 2014 - Including VAT
69/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
69
7/22/2019 2014 - Including VAT
70/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
70
7/22/2019 2014 - Including VAT
71/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
71
7/22/2019 2014 - Including VAT
72/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
72
7/22/2019 2014 - Including VAT
73/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
73
7/22/2019 2014 - Including VAT
74/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
74
7/22/2019 2014 - Including VAT
75/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
75
7/22/2019 2014 - Including VAT
76/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
76
7/22/2019 2014 - Including VAT
77/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
77
7/22/2019 2014 - Including VAT
78/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
78
7/22/2019 2014 - Including VAT
79/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
79
7/22/2019 2014 - Including VAT
80/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
80
7/22/2019 2014 - Including VAT
81/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
81
7/22/2019 2014 - Including VAT
82/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
82
7/22/2019 2014 - Including VAT
83/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
83
7/22/2019 2014 - Including VAT
84/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
84
7/22/2019 2014 - Including VAT
85/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
85
7/22/2019 2014 - Including VAT
86/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
86
7/22/2019 2014 - Including VAT
87/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
87
7/22/2019 2014 - Including VAT
88/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
88
7/22/2019 2014 - Including VAT
89/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
89
7/22/2019 2014 - Including VAT
90/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
90
7/22/2019 2014 - Including VAT
91/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
91
7/22/2019 2014 - Including VAT
92/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
92
7/22/2019 2014 - Including VAT
93/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
93
7/22/2019 2014 - Including VAT
94/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
94
7/22/2019 2014 - Including VAT
95/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
95
7/22/2019 2014 - Including VAT
96/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
96
7/22/2019 2014 - Including VAT
97/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
97
7/22/2019 2014 - Including VAT
98/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
98
7/22/2019 2014 - Including VAT
99/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
99
7/22/2019 2014 - Including VAT
100/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
100
7/22/2019 2014 - Including VAT
101/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
101
7/22/2019 2014 - Including VAT
102/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
102
7/22/2019 2014 - Including VAT
103/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
103
7/22/2019 2014 - Including VAT
104/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
104
7/22/2019 2014 - Including VAT
105/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
105
7/22/2019 2014 - Including VAT
106/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
106
7/22/2019 2014 - Including VAT
107/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
107
7/22/2019 2014 - Including VAT
108/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
108
7/22/2019 2014 - Including VAT
109/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
109
7/22/2019 2014 - Including VAT
110/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
110
7/22/2019 2014 - Including VAT
111/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
111
7/22/2019 2014 - Including VAT
112/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
112
7/22/2019 2014 - Including VAT
113/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
113
7/22/2019 2014 - Including VAT
114/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
114
7/22/2019 2014 - Including VAT
115/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
115
7/22/2019 2014 - Including VAT
116/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
116
7/22/2019 2014 - Including VAT
117/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
117
7/22/2019 2014 - Including VAT
118/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
118
7/22/2019 2014 - Including VAT
119/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
119
7/22/2019 2014 - Including VAT
120/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
120
7/22/2019 2014 - Including VAT
121/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
121
7/22/2019 2014 - Including VAT
122/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
122
7/22/2019 2014 - Including VAT
123/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
123
7/22/2019 2014 - Including VAT
124/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
124
7/22/2019 2014 - Including VAT
125/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
125
7/22/2019 2014 - Including VAT
126/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
126
7/22/2019 2014 - Including VAT
127/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
127
7/22/2019 2014 - Including VAT
128/252
Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT
128
7/22/2019 2014 - Including VAT
129/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
SECTION I - MASONRY WORKS.
B-001 Brick work in 1:5 cement sand mortar 225mm thick and
above in foundations up to D.P.C . m3
10,721.00
B-002 Brick work in 1:8 cement sand mortar 225mm thick in super
structure in ground floor. m3
10,373.00
B-003 Brick work in 1:5 cement sand mortar 112.5mm thick in
ground floor. m2
1,356.00
B-004 Brick work in 1:5 cement sand mortar 112.5mm thick usingavailable bricks. m
2 814.00
B-005 Brick work in 1:8 cement & sand mortar 225mm thick or
above. (using available bricks) m3
4,888.00
B-006 Masonry block work 100mm thick in walls in cement and
sand 1:5 motar using hollow blocks made of cement and
sand to the proportion of 1:10, confirming to SLS standard
in ground floor. m2
1,339.00
B-007 Masonry block work 150mm thick in walls in cement and
sand 1:5 motar using hollow blocks made of cement andsand to the proportion of 1:10, confirming to SLS standard
in ground floor. m2
1,558.00
B-008 Masonry block work 200mm thick in cement and sand 1:5
motar using hollow blocks made of cement and sand to a
proportion of 1:10, confirming to SLS standard in ground
floor. m2
2,099.00
B-009 R.R masonry in 1:5 cement and sand motar in foundations
using available rubble. m3
7,768.00
B-010 R.R masonry in 1:5 cement and sand motar in foundations. m3
9,374.00
B-011 R.R masonry in 1:5 cement and sand motar in
superstructure.m
3 10,186.00
B-012 Provision of weep holes in retaining walls with 90mm dia.
PVC down pipes including metal packing around inner
mouth as directed, length of pipe up to 1050mm. nr 480.00
BUILDING SCHEDULE OF RATES EFFECTIVE FROM
2014 JANUARY
RATES INCLUDING VAT
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 129
7/22/2019 2014 - Including VAT
130/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
B-013 Provision of weep holes in retaining walls with 90mm dia.
PVC down pipes including metal packing around inner
mouth as directed, length of pipe 1200mm to 1650mm. nr 620.00
B-014 Provision of weep holes in retaining walls with 90mm dia.PVC down pipes including metal packing around inner
mouth as directed, length of pipe 1800mm to 2250mm. nr 758.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 130
7/22/2019 2014 - Including VAT
131/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
SECTION II - CONCRETOR
C-001 Mixing and placing in position concrete grade 30, nominal
mix 1:1 :2 (20mm) using a concrete mixer including fuel /
operator / handling/vibrator. m3 21,580.00
C-002 Mixing and placing in position concrete grade 25, nominal
mix 1:1 1/2:3 ( 20mm) using a concrete mixer including fuel
/ operator / handling/vibrator. m3
17,883.00
C-003 Mixing and placing in position concrete grade 20, nominal
mix 1:2:4 ( 20mm) using a concrete mixer including fuel /
operator / handling/vibrator. m3
16,261.00
C-004 Mixing and placing in position concrete 1:21/2:5(25mm)
using a concrete mixer including fuel / operator /handling/vibrator. m3
12,488.00
C-005 Mixing and placing in position concrete 1:3:6 (40mm) using
a concrete mixer including fuel / operator /
handling/vibrator. m3
12,002.00
C-006 Tor steel reinforcement bend to shape laid in position and
tied with G.I. wire as directed. Kg 253.00
C-007 Mild steel reinforcement bend to shape laid in position and
tied with G.I. wire as directed. Kg 234.00
C-008 Sawn timber formwork in class III timber for columns,
ground floor. m2
1,354.00
C-009 Sawn timber form work in class III timber for underside of
ground floor slabs. m2
1,273.00
C-010 Sawn timber form work in class III timber for concrete
beams. m2
1,329.00
C-011 Sawn timber formwork in class III timber for portal frames. m2
1,639.00
C-012 Sawn timber formwork in class III timber for groundconcrete work,at ground level plinth beams,lintols etc. m
2 1,030.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 131
7/22/2019 2014 - Including VAT
132/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
C-013 2400mm x 600mm x 450mm plat form with 75mm thick
1:3:6 (40mm) base & 2400mm x 300mm x 225mm step in
rubble and 75mm thick 1:2 1/2:5 (25mm) concrete topping.
Inclusive of 1:3 cement and sand rendering finished smooth
with coloured cement floating and polishing and providingthree numbers 2"dia.medium duty G.I.pipe flag post
complete with painting and provide necessary arrangements
for hoisting the flag. nr 39,043.00
C-014 Concrete catch pits / valve chambers in 50mm thick
1:2:4(20mm) concrete side walls and internal faces cement
rendered with 1:3 cement and sand finished smooth, to be
leak proof, inclusive of provision for necessary pipe
connection etc, with suitable cover or grating on top to be
flush with floor level. Internal dimensions 150mm x 150mm
x 300mm. nr 671.00
C-015 Concrete catch pits / valve chambers in 50mm thick
1:2:4(20mm) concrete side walls and internal faces cement
rendered with 1:3 cement and sand finished smooth, to be
leak proof, inclusive of provision for necessary pipe
connection etc, with suitable cover or grating on top to be
flush with floor level. Internal dimensions 150mm x 150mm
x 450mm. nr 858.00
C-016 Concrete catch pits / valve chambers in 50mm thick
1:2:4(20mm) concrete side walls and internal faces cement
rendered with 1:3 cement and sand finished smooth, to beleak proof, inclusive of provision for necessary pipe
connection etc, with suitable cover or grating on top to be
flush with floor level. Internal dimensions 300mm x 300mm
x 450mm. nr 1,823.00
C-017 Drain 225mm X 150mm (average depth) concrete 1:2 1/2:5
(25mm) 75mm thick, provide expansion joints at 3000mm
crs 12mm thick , 1:3 cement sand rendering finished
smooth, including necessary excavation, form work, laying
polythene membrane under concrete and laid to required
slope. m 1,569.00
C-018 Drain 225mm X 300mm (average depth) concrete 1:2 1/2:5
(25mm) 75mm thick, provide expansion joints at 3000mm
crs 12.5mm thick , 1:3 cement sand rendering finished
smooth, including necessary excavation, form work, laying
polythene membrane under concrete and laid to required
slo e. m 2,554.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 132
7/22/2019 2014 - Including VAT
133/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
C-019 Drain 225mm x 450mm (average depth) concrete 1:2 1/2:5
(25mm) 75mm thick, provide expansion joints at 3000mm
crs 12.5mm thick , 1:3 cement sand rendering finished
smooth, including necessary excavation, form work, laying
polythene membrane under concrete and laid to requiredslope. m 3,224.00
C-020 750mm wide ramp and 225mm X 150mm(average depth)
drain in 1:2 1/2:5(25mm) concrete 75mm thick with 1:3
plaster finished smooth, including necessary excavation,
form work, providing expansion joints at 3000mm crs and
laying polythene membrane under concrete and laid to
required slope. m 2,731.00
C-021 Concrete cover slabs 50mm thick 1:2:4 (20 mm) r/f with,
6mm dia. MS bars at bottom @ 100mm centre. both ways,
1:3 cement and sand rendering finished smooth, pre-cast in,
pieces not exceeding 600mm x 450mm placed in position as
directed, providing drain holes if required. m2
3,391.00
C-022 Ready mixed concrete grade 20 , 1:2:4(20mm) pumping to
any level, rate including transporting, pumping, placing,
porker vibrating, levelling and curing the concrete. (Rate for
above 30m3) for Kandy area. m
3 18,712.00
C-023 Ready mixed concrete grade 20 , 1:2:4(20mm) pumping to
any level, rate including transporting, pumping, placing,
porker vibrating, levelling and curing the concrete. (Rate for
above 30m3) for Gampola / Matale area. m
3 19,457.00
C-024 Ready mixed concrete grade 20 , 1:2:4(20mm) pumping to
any level, rate including transporting, pumping, placing,
porker vibrating, levelling and curing the concrete. (Rate for
above 30m3) for Dambulla / Naula area. m
3 20,992.00
C-025 Ready mixed concrete grade 20 , 1:2:4(20mm) pumping to
any level, rate including transporting, pumping, placing,
porker vibrating, levelling and curing the concrete. (Rate for
above 30m3 ) for Nawalapitiya area. m3 20,134.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 133
7/22/2019 2014 - Including VAT
134/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
SECTION III - DEMOLISHER
D-001 Ceiling asbestos removing including timber framework,
stacking serviceable materials and debris cleared away. in
single storied building. (Ceiling Only) m2
301.00
D-002 Ceiling asbestos removing including timber frame work,
stacking serviceable materials and debris cleared away in
two storied building. (Ceiling Only) m2
332.00
D-003 Partitions, weld mesh, shelves removed from existing walls
and stacking. m2
127.00
D-004 225mm wide drain in brick masonry, demolishing and
clearing debris. m 119.00
D-005 Floor paving brick, concrete or rubble inclusive of renderingand debris cleared away. m
2120.00
D-006 Corrugated sheets, iron, asbestos or aluminium alloy
removed from roof including frame work inclusive of wiring
and fixtures, gutters, valance boards etc.. in single story
buildings. m2
101.00
D-007 Corrugated sheets, iron, asbestos or aluminium alloy
removed from roof including frame work inclusive of wiring
and fixtures, gutters, valance boards etc.. in two storied
buildings. m2
111.00
D-008 Corrugated sheets, iron, asbestos or aluminium alloy
removed from roof including frame work inclusive of wiring
and fixtures, gutters, valance boards etc.. in three storied
buildings. m2
118.00
D-009 Roof removing tiles with frame work inclusive of wiring
and fixtures, gutters, valance boards etc., stacking
serviceable material and debris cleared away in single
storied buildin s. m2
163.00
D-010 Roof removing tiles with frame work inclusive of wiring
and fixtures, gutters, valance boards etc., stacking
serviceable material and debris cleared away in two storied
buildings. m2
223.00
D-011 Roof removing tiles with frame work inclusive of wiring
and fixtures, gutters, valance boards etc., stacking
serviceable material and debris cleared away in three
storied buildings. m2
276.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 134
7/22/2019 2014 - Including VAT
135/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
D-012 Tiles calicut or half round, removed from roof of single
storey buildings including stacking serviceable material and
debris cleared away. m2
60.00
D-013 Tiles calicut or half round, removed from roof of two storeybuildings including stacking serviceable material and debris
cleared away. m2
90.00
D-014 Tiles calicut or half round, removed from roof of three
storied buildings and above, including stacking serviceable
material and debris cleared away. m2
120.00
D-015 Removing and stacking trusses steel or timber 6.1m (20
L.ft) of span from single story building. nr 2,279.00
D-016 Removing and stacking trusses steel or timber 7.6m (25L.ft) of span from single story building. nr 2,849.00
D-017 Removing and stacking trusses steel or timber 9.1m (30
L.ft) of span from single story building. nr 3,418.00
D-018 Demolishing walls bricks 112.5mm thick inclusive of
plaster and any fixtures including debris cleared away. m2
239.00
D-019 Demolishing walls bricks above 225mm thick inclusive of
plaster and any fixtures includingdebris cleared away. m3
982.00
D-020 Demolishing rubble masonry in cement and sand inclusive
of plaster and any fixtures, rubble stacked and removing
debris . m3
1,222.00
D-021 Demolishing reinforced concrete walls, beams or slabs up to
first floor and debris cleared away. m3
7,848.00
D-022 Demolishing reinforced concrete walls, beams or slabs up to
second floor and debris cleared away. m3
8,251.00
D-023 Demolishing reinforced concrete walls, beams or slabs up to
third floor and debris cleared away. m3 8,854.00
D-024 Door or window size up to 4.0m2
removed from existing
walls and stacked. nr 1,107.00
D-025 Door or window size over 4.0m2
removed from existing
walls and stacked. nr 1,661.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 135
7/22/2019 2014 - Including VAT
136/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
D-026 Door or window (sash only) size up to 4.0m2
removed from
existing frames and stacked. m2
142.00
D-027 Door or window sash only size over 4.0m removed from
existing frame and stacked. m2 213.00
D-028 Gutters, down pipes, valleys GI or PVC including specials
removed and stacked. m 30.00
D-029 Boards, valance and barge removed and stacked. m 23.00
D-030 Low-level suits, squatting closets removed and stacked. nr 443.00
D-031 Wash basins, cisterns, sinks, urinals removed and stacked. nr 277.00
D-032 Ridges, asbestos or tile, removed and stacked. m 44.00
D-033 Pipes PVC, GI, removed and stacked. m 15.00
D-034 Rendering, cement, chipped and debris cleared away from
brick walls and floors. m2
134.00
D-035 Rendering, cement, chipped and debris cleared away from
cement concrete floors and walls. m2
201.00
D-036 Fence uprooted, barbed wire 5 strands rolled up and all
materials stacked (Length of the fence to be measured). m 173.00
D-037 Tiled, glazed floor or wall demolished and debris cleared. m2
238.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 136
7/22/2019 2014 - Including VAT
137/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
SECTION IV - EXCAVATOR
E-001 Earth excavation in levelling site inclusive of haulage up to
30 m. (manual cutting only up to 450m3
) m3
603.00
E-002 Earth excavation in levelling site inclusive of haulage up to
30 m. (machine cutting only) in ordinary soil. m3
116.00
E-003 Excavation in foundations in normal earth up to depth of
1.5m inclusive of backfilling, compacting and disposal of
surplus earth. m3
897.00
E-004 Excavation in foundations in soft rock requiring manual
digging, up to a depth of 1.5m inclusive of backfilling and
disposal of surplus materials. m3
1,199.00
E-005 Excavation in levelling site in hard rock involving blasting
inclusive of haulage up to 30 m, and piling rubble. Extra
over earth excavation payable on rubble measurement only. m3
1,625.00
E-006 Excavation in levelling site in soft rock involving manual
digging inclusive of haulage up to 30 m. m3
1,190.00
E-007 Excavation in wells / pits in normal earth up to depth of
1.5m inclusive of backfilling behind wall / ring and disposal
of surplus earth, rate excluding for shoring. m3
995.00
E-008 Excavation in wells / pits in normal earth 1.5m to 3.0m
depth inclusive of backfilling behind wall /ring and
disposal of surplus earth, rate excluding for shoring. m3
1,386.00
E-009 Excavation in wells / pits in normal earth 3.0m to 4.5m
depth inclusive of backfilling behind wall /ring and
disposal of surplus earth, rate excluding for shoring. m3
1,972.00
E-010 Excavation in wells / pits in normal earth 4.5m to 6.0m
depth inclusive of backfilling behind wall /ring and
disposal of surplus earth, rate excluding for shoring. m3 2,567.00
E-011 Filling earth and compacting (as approved by Engineer)
150mm layers in large quantities. Rate includes for
transport of 30 m. m3
701.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 137
7/22/2019 2014 - Including VAT
138/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
E-012 Filling earth and compacting (as approved by Engineer)
150mm layers under floors. Rate includes for transport of
30 m. m3
807.00
E-013 Shoring for excavations up to 3m height. m2 568.00
E-014 Wells bailed out and cleaned total depth up to 3.0m
(measured, capacity of well below water table). m3
297.00
E-015 Wells bailed out and cleaned total depth up to 4.8m
(measured, capacity of well below water table). m3
594.00
E-016 Wells bailed out and cleaned total depth up to 7.5m
(measured, capacity of well below water table). m3
832.00
E-017 Extra over excavation for removing boulders size exceeding0.05m
3,in any manner (Volume of each boulder measured
as 0.75 x Average height x Squared Area). m3
1,929.00
E-018 Haulage of earth more than 30m away from site deposited
and spread by any means. m3
238.00
E-019 Levelling ground to required grading cutting lumps and
spreading and compacting manually. m2
24.00
E-020 Disposal of surplus earth, inclusive of loading and
unloading and transport up to 10 km.(Using Mechine) m3
334.00
E-021 Compacting approved gravel, filled in 150mm layers by
manual tamping as specified. (Gravel available at site) m3
589.00
E-022 River sand supplied and spread in layers as specified under
foundations, drainage sand blankets, filters, around soakage
pits, wells etc. m3
2,087.00
E-023 Compacting approved gravel in 150mm layers by any means
except manual tamping as specified. (Gravel available at
site)m
3
353.00
E-024 Rock excavation in column footings or wall foundations. m3
3,722.00
E-025 Sand filling under foundations. (As a cushion) m3
2,061.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 138
7/22/2019 2014 - Including VAT
139/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
SECTION V - PAVIOR
F-001 Floor - Brick 62mm thick, 1:3 cement & sand rendered
finished smooth with gray cement floating with expansion
joints filled in 1:2 bitumen and sand. (Rate including for
brick paved with 2:5 lime mortar and curing) m2
1,727.00
F-002 Floor - Brick 62mm thick, 1:3 cement & sand rendered
finished smooth with gray cement floating with expansion
joints filled in 1:2 bitumen and sand. (Rate including for
brick paved with 2:5 lime mortar and curing). Bricks
available at site. m2
1,401.00
F-003 Floor concrete 1:2 1/2:5(25mm) 75mm thick, 1:3 normal
cement rendering finished smooth with expansion joints
filled with 1:2 bitumen and sand. Rate including for curing,
compacting ground and laying polythene sheets under the
concrete. m2 1,566.00
F-004 Floor concrete 1:2 1/2:5(25mm) 62mm thick, 1:3 normal
cement rendering finished smooth with expansion joints
filled with 1:2 bitumen and sand. Rate including for curing,
compacting ground and laying polythene sheets under the
concrete. m2
1,293.00
F-005 Floor concrete 1:2 1/2:5(25mm) 75mm thick with expansion
joints filled with 1:2 bitumen and sand rate including for
curing, compacting ground and laying polythene sheet under
the concrete. m2
971.00
F-006 Floor concrete 1:2 1/2:5(25mm) 62mm thick with expansion
joints filled with 1:2 bitumen and sand rate including for
curing, compacting ground and laying polythene sheet under
the concrete. m2
698.00
F-007 Extra over supplying & fixing tile beading (Small) m 56.00
F-008 Extra over Supplying & fixing tile beading (Large) m 98.00
F-009 A) Floor paved with approved pattern and colour
(homogeneous /porcelain /ceramic) floor tiles on 1:3 cement
mortar, joints filled with tile grout, to match the colour of
tiles and cleaning. (Tile rate not included) m2 1,279.00
B) Add only the cost of tile + overhead and profit per m2
(Tile)for the above rate.
* Total floor tiling rate A + B
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 139
7/22/2019 2014 - Including VAT
140/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
F-010 A) 100mm high tile skirting approved pattern and colour
(homogeneous/porcelain /ceramic) floor tiles on 1:3 cement
mortar, joints filled with tile grout to match the colour of
tiles and cleaning. (Tile rate not included) m 195.00
B) Add only the cost of tile + overhead and profit per "m"
(Tile skirting)for the above rate.
* Total tile skirting rate A + B
F-011 Floor re-rendered with 1:3 cement and sand after demolition
and clearance of damaged areas, providing expansion joints
filled in 1:2 bitumen and sand (Rate including for curing). m2
697.00
F-012 Floor rendered with 1:3 cement and sand normal cement
floated surface with expansion joints filled with 1:2 bitumen
sand.( Rate including for curing)m
2
595.00 .
F-013 Extra over, for coloured cement floor waxed and polishing. m2
109.00
F-014 100mm high skirting in cement and sand 1:3 projected or
flush to walls finished smooth with gray cement floating
including forming groove. m 337.00
F-015 Waterproofing in upper floor bathrooms, water tanks etc.
with cementitious waterproofing agent approved by the
Engineer, (Barralastic or equivalent) apply two coats after
well cleared surface. m2
1,845.00
F-016 Floor rendered with 1:3 cement and sand approved coloured
surface with expansion joints filled with 1:2 bitumen and
sand. (Rate including for curing) m2
798.00
F-017 100mm high skirting in cement and sand 1:3 finished
smooth with coloured cement including forming groove. m 369.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 140
7/22/2019 2014 - Including VAT
141/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
SECTION VI - MISCELLANEOUS / GENERAL
G-001 Clearing jungle along the fence. m 36.00
G-002 Cutting coconut trees removing root balls and stacking logs. nr 3,813.00
G-003 Cutting coconut trees and removing stumps. nr 2,706.00
G-004 Cutting trees girth 0.45m to 0.9m, removing root balls and
stacking logs. nr 6,056.00
G-005 Cutting trees girth 0.45m to 0.9m and stacking logs. nr 3,832.00
G-006 Cutting trees girth 0.925m to 1.35m, removing root balls
and stacking logs.nr 8,776.00
G-007 Cutting trees girth 0.925m to 1.35m and stacking logs. nr 6,551.00
G-008 Cutting trees girth 1.375m to 1.8m, removing root balls and
stacking logs. nr 12,607.00
G-009 Cutting trees girth 1.375m to 1.8m and stacking logs. nr 10,382.00
G-010 Cutting trees girth 1.825m to 2.25m, removing root balls
and stacking logs. nr 17,551.00
G-011 Cutting trees girth 1.8m to 2.25m and stacking logs. nr 15,326.00
G-012 Cutting trees girth 2.2m to 2.7m, removing root balls and
stacking logs. nr 21,383.00
G-013 Cutting trees girth 2.2m to 2.7m and stacking logs. nr 19,158.00
G-014 Fence barbed wire 5 strands 14 BWG with 4 points at
75mm crs and R.C.C posts 1:1 1/2:3 (20mm) concrete
1.70m high,and section 150mm x 150mm at bottom and
100mm x 100mm top, at 2.4m c/c , r/f with 4 nos 6mm dia.
MS rods with 14BWG wire stirrups at 150mm crs. Rate to
inclusive of excavation,1:3:6(40mm) cement concrete
foundations to all post and providing straightening bolts
with washers and nuts. m 1,302.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 141
7/22/2019 2014 - Including VAT
142/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
G-015 Fence barbed wire 8 strands 14 BWG with 4 points at
75mm crs and R.C.C posts 1:1 1/2:3 (20mm) concrete
2.25m high,and section 150mm x 150mm at bottom and
100mm x 100mm top, at 2.4m c/c, r/f with 4 nos 6mm dia.
MS rods with 14BWG wire stirrups at 150crs. Rate toinclusive of excavation,1:3:6(40mm) cement concrete
foundations to all post and providing straightening bolts
with washers and nuts. m 1,510.00
G-016 Fence posts intermediate, or struts, in cement concrete 1:1
1/2:3(20mm) r/f with 4 nos 6mm MS rods and 14BWG wire
stirrups at 150crs, 1.7m high and section 150mm x 150mm
at bottom and 100mm x 100mm top, as per detail drawing
including fixing with 1:3:6 concrete, excavation etc. nr 2,469.00
G-017 Fence posts intermediate, or struts, in cement concrete 1:11/2:3(20mm) r/f with 4 nos 6mm MS rods and 14BWG wire
stirrups at 150crs, 2.25m high and section 150mm x 150mm
at bottom and 100mm x 100mm top, as per detail drawing
including fixed with 1:3:6 concrete, excavation etc. nr 2,934.00
G-018 Fence posts RCC, available, refixed. Rate includes for
concreting 1:3:6(40mm) where necessary. nr 517.00
G-019 Fence, barbed wire 14 gauge 4 points, available,
strengthened & fixed on exiting concrete or timber posts. m 18.00
G-020 Fence barbed wire 14 gauge 4 Points, supplied & fixed onexisting concrete or timber posts. m 33.00
G-021 Flight of steps in 1:2 1/2 :5(25mm) concrete overall width
1.5m, waist 100mm on well compacted ground, waist below
ground level, curb walls 150mm thick overall height 450mm
in outer surface. Rate includes all formwork and 1:3 cement
rendering finished smooth to exposed surfaces. size of steps
150 mm rise and 275mm tread.(Measured sloping length.) m 10,308.00
G-022 Landing flight of steps 1.5m wide overall base 100mm
thick, curb walls 150mm thick and 150mm heightexternally, in 1:2 1/2:5(25mm) concrete, and 1:3.cement
rendering finished smooth. m 8,736.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 142
7/22/2019 2014 - Including VAT
143/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
G-023 Chain link mesh fence 2.0m high (Gauge 12) with 2" dia.
medium quality GI pipe at 2.4m c/c up rights and one after
the other 3/4" dia. medium quality GI pipe up right at 2.4m
c/c and 1" dia. GI pipe medium quality at top and bottom
runners, including excavation, foundation concrete work1:2:4(20mm), welding work, painting of two coats of
anticorrosive and finished coat of enamel etc.(Chain link
fence open area 2" x 2") m 9,368.00
G-024 Supplying and laying 1.5m x 1.0m x 1.0m galvanized
gabion boxes with necessary rubble packing. nr 12,382.00
G-025 Supplying and laying 2.0m x 1.0m x 1.0m galvanized
gabion boxes with necessary rubble packing. nr 16,596.00
G-026 Supplying and laying 1.0m x 1.0m x 1.0m galvanizedgabion boxes with necessary rubble packing. nr 9,052.00
G-027 Supplying and laying geo textile layer behind gabion
retaining walls type T.S. 30. m2
227.00
G-028 Cutting turf sods, loading to hand carts and transporting up
to 30 m, laying and watering for 30days. (Royalty for turf
sods, and transport beyond 30m paid separately) m2
211.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 143
7/22/2019 2014 - Including VAT
144/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
SECTION VII - DRAINAGE SYSTEMS
H-001 Elbow pvc 110mm supplied and fixed. nr 715.00
H-001A Cleaning eye bend pvc 110mm supplied and fixed. nr 925.00
H-002 Bend PVC 110 supplied and fixed, drainage. nr 715.00
H-003 Type 400 pvc 110mm for sewer line supplied and laid in
medium soil, joints embedded in 1:3:6(40mm) concrete
including necessary excavation, back filling, and
compaction, invert depth up to 600mm. m 836.00
H-004 Type 400 pvc 110mm for sewer line supplied and laid in
medium soil, joints embedded in 1:3:6 (40mm) concrete
including necessary excavation, back filling, and
compaction invert depth to 600mm to 900mm. m 919.00
H-005 Type 400 pvc 160mm for sewer line supplied and laid in
medium soil, joints embedded in 1:3:6(40mm) concrete
including necessary excavation, back filling, and
compaction invert depth up to 600mm. m 2,745.00
H-006 Type 400 pvc 160mm for sewer line supplied and laid in
medium soil, joints embedded in 1:3:6(40mm) concrete
including necessary excavation, back filling, and
compaction invert depth to 600mm to 900mm. m 2,828.00
H-007 Gully PVC 150mm supplied and fixed including concreting
and supplying necessary grating. nr 597.00
H-008 Manhole 600mm x 600mm x 600mm internally complete
with cement concrete 1:2:4(25mm) in 75mm thick
base,225mm tk.brick walls ,on top of the slab, channelling
and bending, 1:3 cement and sand rendered in internal
surfaces, 75mm thick RC. cover slab r/f 10mm tor steel @
150mm c/c. both ways, complete with lifting handles. nr 12,376.00
H-009 Manhole 600mm x 600mm internally complete with brick
walls 1:3 cement and sand rendered in internal surfaces,
extra over for each additional 0.3m depth. nr 3,191.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 144
7/22/2019 2014 - Including VAT
145/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
H-010 Manhole 1.05m x 0.675m x 0.60m internally with cement
concrete 1:2:4(25mm) in 75mm thick base ,channelling,
walls 255mm brick, 1:3 cement and sand rendered in
internal surfaces 75mm thick RC. cover slab r/f 10mm tor
steel @ 150mm c/c. both ways, complete with liftinghandles. nr 19,419.00
H-011 Manhole 1.05m x 0.675m internally brick walls 225mm ,
1:3 cement and sand rendered in internal surfaces extra
over each additional 0.3 m depth. nr 4,251.00
H-012 Shallow drains in floors 75mm diameter in cement concrete
1:2:4(25mm), 75mm thick in bottom and sides including
cement and sand rendering. m 1,249.00
H-013 Construction of 1.2m diameter internal fully built type
soakage pit, built up 225mm thick brick work in 1:8 cement,sand mortar invert depth from ground level 3.0m,on
225mm x 150mm ring beam 1:2:4(20mm) concrete mix,
including 1:3 cement,sand plaster finished smooth with
neat gray cement (0.9m invert depth only) & 100mm high
1:2:4(20mm ) concrete ring pad above ground level,
complete with 75mm thick RCC cover slab with lifting
handle.All as per detail drawing.(CP/K/119/91A). nr 80,628.00
H-014 Construction of 1.2m diameter internal semi built type
soakage pit, built up 225mm thick brick work in 1:8 cement
,sand mortar invert depth from ground level 0.90m,on
225mm x 150mm ring beam 1:2:4(20mm) concrete mix,including 1:3 cement,sand plaster finished smooth with
neat gray cement & 100mm high 1:2:4(20mm ) concrete
ring pad above ground level, complete with 75mm thick
RCC cover slab with lifting handle.All as per detail
drawing.(CP/K/119/91A). nr 42,699.00
H-015 Construction of 1.8m diameter internal fully built type
soakage pit , built up 225mm thick brick work in 1:8 cement
,sand mortar invert depth from ground level 3.0m,on
225mm x 150mm ring beam 1:2:4(20mm) concrete mix,
including 1:3 cement,sand plaster finished smooth with
neat gray cement (0.9m invert depth only) & 100mm high1:2:4(20mm ) concrete ring pad above ground level,
complete with 75mm thick RCC cover slab with lifting
handle.All as per detail drawing.(CP/K/253/92A). nr 109,176.00
H-016 Tee, pvc 110mm supplied and fixed drainage. nr 1,007.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 145
7/22/2019 2014 - Including VAT
146/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
H-017 Vent pvc 110mm diameter (type 400) fixed on walls with
timber plugs and pvc brackets. (Specials paid separately) m 882.00
H-018 Construction of septic tank for 15 persons 2.1m x 0.75m
internally as per detail drawing No. CP/K/117/91A. nr 90,176.00
H-019 Construction of septic tank for 25 persons 2.4m x 0.75m
internally as per detail drawing No. CP/K/117/91A. nr 98,011.00
H-020 Construction of septic tank for 25 persons as per type plan
complete, extra over for invert depth exceeding 600mm to
1800mm, per each additional 0.3 m. nr 8,401.00
H-021 Construction of septic tank for 50 persons invert depth up to
0.75m complete as per type plan No: CP/K/121/91A. nr 127,032.00
H-022 Construction of septic tank for 50 persons as per type plan
complete, extra over for invert depth exceeding 600mm to
1800mm, per each additional 0.3 m. nr 9,954.00
H-023 Construction of septic tank for 100 persons invert depth up
to 2250mm complete as per type plan No:CP/K/121/91A. nr 182,863.00
H-024 Construction of septic tank for 100 persons as per type plan
complete, extra over for invert depth exceeding 600mm to
1800mm, per each additional 0.3 m. nr 14,108.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 146
7/22/2019 2014 - Including VAT
147/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
SECTION VIII - ELECTRICAL INSTALLATION
Note - *
*
*
*
I-001 Bell point wiring - to be carried out with 2 x 1.0 mm2PVC
insulated PVC sheathed copper cables wired in concealed
conduit in wall and above ceiling to be supplied and
installed in to working order.(Including sunk switch) nr 1,650.00
I-002 Pendent type lamp point wiring - to be carried out with 2 x
1.0 mm2PVC insulated PVC sheathed copper cables wired
in concealed conduit in wall and above ceiling to be
supplied and installed in to working order.(Including sunk
switch) nr 1,749.00
I-003 2 Nos. of Pendent type lamp points to be controlled by one
switch - point wirings to be carried out with 2 x 1.0 mm2
PVC insulated PVC sheathed copper cables wired in
concealed conduit in wall and above ceiling, to be supplied
and installed in to working order(including sunk switch). nr 2,539.00
I-004 3 Nos. of Pendent type lamp points to be controlled by one
switch - point wirings to be carried out with 2 x 1.0 mm2
PVC insulated PVC sheathed copper cables wired in
concealed conduit in wall and above ceiling, to be supplied
and installed in to working order(including sunk switch). nr 3,328.00
I-005 4 Nos. of Pendent type lamp points to be controlled by one
switch - point wirings to be carried out with 2 x 1.0 mm2
PVC insulated PVC sheathed copper cables wired in
concealed conduit in wall and above ceiling, to be suppliedand installed in to working order(including sunk switch). nr 4,118.00
I-006 5 Nos. of Pendent type lamp points to be controlled by one
switch - point wirings to be carried out with 2 x 1.0 mm2
PVC insulated PVC sheathed copper cables wired in
concealed conduit in wall and above ceiling, to be supplied
and installed in to working order(including sunk switch). nr 4,908.00
Should be followed the IEE wiring regulations for electrical Installations.
All MCCB, RCD, MCB and Isolators should be Moeller/ Orange Industrial orEquivalent approved quality and should have more than 5 Year warranty period.
All types of fans should be KDK Or Equivalent approved quality and should have
minimum one year warranty period.
The Ceiling fans should have Cut-off Safety Switch and Safety Wire Provided to
Prevent Detachment of Fan Motor from the Rod.
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 147
7/22/2019 2014 - Including VAT
148/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
I-007 Recessed type / Surface mounted type / Ceiling mounted
type lamp point wiring - to be carried out with 2 x 1.0 mm2
PVC insulated PVC sheathed copper cables wired in
concealed conduit in wall and above ceiling to be supplied
and installed in to working order.(Including sunk switch) nr 1,428.00
I-008 2 Nos of Recessed type / Surface mounted type / Ceiling
mounted type lamp point to be controlled by one switch and
wiring to be carried out with 2 x 1.0 mm2PVC insulated
PVC sheathed copper cables wired in concealed conduit in
wall and above ceiling to be supplied and installed in to
working order.(Including sunk switch) nr 1,897.00
I-009 3 Nos of Recessed type / Surface mounted type / Ceiling
mounted type lamp point to be controlled by one switch and
wiring to be carried out with 2 x 1.0 mm2PVC insulatedPVC sheathed copper cables wired in concealed conduit in
wall and above ceiling to be supplied and installed in to
working order.(Including sunk switch) nr 2,366.00
I-010 Bell point wiring - to be carried out with 2 x 1.0 mm2PVC
insulated PVC sheathed copper cables wired in concealed
conduit in wall and above ceiling to be supplied and
installed in to working order.(Including sunk switch) nr 2,835.00
I-011 5 Nos of Recessed type / Surface mounted type / Ceiling
mounted type lamp point to be controlled by one switch andwiring to be carried out with 2 x 1.0 mm
2PVC insulated
PVC sheathed copper cables wired in concealed conduit in
wall and above ceiling to be supplied and installed in to
working order.(Including sunk switch) nr 3,304.00
I-012 1 Nos. of Watertight lamp points to be controlled by one
switch - point wirings to be carried out with 2 x 1.0 mm2
PVC insulated PVC sheathed copper cables wired in
concealed conduit in wall and above ceiling to be supplied
and installed in to working order (Including Sunk switch). nr 1,428.00
I-013 2 Nos. of Watertight lamp points to be controlled by one
switch - point wirings to be carried out with 2 x 1.0 mm2
PVC insulated PVC sheathed copper cables wired in
concealed conduit in wall and above ceiling to be supplied
and installed in to working order (Including Sunk switch). nr 1,897.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 148
7/22/2019 2014 - Including VAT
149/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
I-014 3 Nos. of Watertight lamp points to be controlled by one
switch - point wirings to be carried out with 2 x 1.0 mm2
PVC insulated PVC sheathed copper cables wired in
concealed conduit in wall and above ceiling to be supplied
and installed in to working order (Including Sunk switch). nr 2,366.00
I-015 4 Nos. of Watertight lamp points to be controlled by one
switch - point wirings to be carried out with 2 x 1.0 mm2
PVC insulated PVC sheathed copper cables wired in
concealed conduit in wall and above ceiling to be supplied
and installed in to working order (Including Sunk switch). nr 2,835.00
I-016 5 Nos. of Watertight lamp points to be controlled by one
switch - point wirings to be carried out with 2 x 1.0 mm2
PVC insulated PVC sheathed copper cables wired in
concealed conduit in wall and above ceiling to be suppliedand installed in to working order (Including Sunk switch). nr 3,304.00
I-017 Indoor bracket lamp point wiring to be carried out with 2 x
1.0 mm2PVC insulated PVC sheathed copper cables wired
in concealed conduit in wall and above ceiling to be
supplied and installed in to working order. ( Including sunk
switch). nr 1,428.00
I-018 2 Nos. of Indoor bracket lamp points to be controlled by one
switch - point wirings to be carried out with 2 x 1.0 mm2
PVC insulated PVC sheathed copper cables wired inconcealed conduit in wall and above ceiling to be supplied
and installed in to working order. ( Including sunk switch). nr 1,897.00
I-019 3 Nos. of Indoor bracket lamp points to be controlled by one
switch - point wirings to be carried out with 2 x 1.0 mm2
PVC insulated PVC sheathed copper cables wired in
concealed conduit in wall and above ceiling to be supplied
and installed in to working order. ( Including sunk switch). nr 2,366.00
I-020 Stairway lamp point wiring - to be carried out with 2 x
1.0mm
2
PVC insulated PVC sheathed copper cables wiredin concealed conduit in wall and above ceiling to be
supplied and installed in to working order (Including one
gang two way switch). nr 2,694.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 149
7/22/2019 2014 - Including VAT
150/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
I-021 Ceiling fan point wiring complete with fan hook - to be
carried out with 2 x 1.0 mm2PVC insulated PVC sheathed
copper cables and 2.5mm2earth cable wired in concealed
conduit in wall and above ceiling to be supplied and
installed in to working order. nr 1,806.00
I-022 5 A socket outlet - wiring to be carried out with 2 x 1.0mm2
PVC insulated PVC sheathed copper cables and 2.5mm2
earth cable wired in concealed conduit in wall and above
ceiling to be supplied and installed in to working order. nr 1,728.00
I-023 2 Nos of 5 A socket outlets - wiring to be carried out with 2
x 2.5mm2PVC insulated PVC sheathed copper cables and
2.5mm2earth cable wired in concealed conduit in wall and
above ceiling to be supplied and installed in to workingorder. nr 4,778.00
I-024 3 Nos of 5 A socket outlets - wiring to be carried out with 2
x 2.5mm2 PVC insulated PVC sheathed copper cables and
2.5mm2 earth cable wired in concealed conduit in wall and
above ceiling to be supplied and installed in to working
order. nr 6,561.00
I-025 4 Nos of 5 A socket outlets - wiring to be carried out with 2
x 2.5mm2PVC insulated PVC sheathed copper cables and
2.5mm2earth cable wired in concealed conduit in wall and
above ceiling to be supplied and installed in to working
order. nr 8,344.00
I-026 13 A socket outlet / Grouped socket outlets - wiring to be
carried out with 2 x 2.5mm2PVC insulated PVC sheathed
copper cables and 2.5mm2earth cable wired in concealed
conduit in wall and above ceiling to be supplied and
installed in to working order. For additional circuit length
over 10m, Item no I-223 should be added per meter. nr 2,965.00
I-027 15 A socket outlet - wiring to be carried out with 2 x
2.5mm2PVC insulated PVC sheathed copper cables and
2.5mm2earth cable wired in concealed conduit in wall and
above ceiling to be supplied and installed in to working
order. For additional circuit length over 10m, Item no I-223
should be added per meter. nr 2,965.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 150
7/22/2019 2014 - Including VAT
151/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
I-028 Data socket outlet ( RJ 45 ) wiring be carried out with 5U/
UTP AWG 24 CAT 5E PVC cables wired in concealed
conduit in wall and above ceiling to be supplied and
installed in to working order. nr 1,519.00
I-029 Data socket outlet ( RJ 45 ) wiring be carried out with 6U/
UTP AWG 24 CAT 6E PVC cables wired in concealed
conduit in wall and above ceiling to be supplied and
installed in to working order. nr 1,750.00
I-030 Telephone socket outlet ( RJ 11 ) wiring be carried out with
2X 0.5 mm2 Single Pair - BS 3573 cables wired in
concealed conduit in wall and above ceiling to be supplied
and installed in to working order. nr 1,237.00
I-031 Telephone socket outlet ( RJ 11 ) wiring be carried out with
2X 0.5 mm2Two Pair - BS 3573 cables wired in concealed
conduit in wall and above ceiling to be supplied and
installed in to working order. nr 1,489.00
I-032 Bell point wiring - to be carried out with 2 x 1.0 mm2PVC
insulated PVC sheathed copper cables wired with PVC
casing on wall and on soffit of the slabs to be supplied and
installed in to working order. (Including sunk switch) nr 1,738.00
I-033 Pendent type lamp point wiring - to be carried out with 2 x
1.0 mm2PVC insulated PVC sheathed copper cables wired
with PVC casing on wall and on soffit of the slabs to be
supplied and installed in to working order (Including sunk
switch). nr 1,837.00
I-034 2 Nos. of Pendent type lamp points to be controlled by one
switch - point wirings to be carried out with 2 x 1.0 mm2
PVC insulated PVC sheathed copper cables wired with
PVC casing on wall and on soffit of the slabs to be supplied
and installed in to working order (Including sunk switch). nr 2,623.00
I-035 3 Nos. of Pendent type lamp points to be controlled by one
switch - point wirings to be carried out with 2 x 1.0 mm2
PVC insulated PVC sheathed copper cables wired with PVC
casing on wall and on soffit of the slabs to be supplied and
installed in to working order (Including sunk switch). nr 3,625.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 151
7/22/2019 2014 - Including VAT
152/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
I-036 4 Nos. of Pendent type lamp points to be controlled by one
switch - point wirings to be carried out with 2 x 1.0 mm2
PVC insulated PVC sheathed copper cables wired with PVC
casing on wall and on soffit of the slabs to be supplied and
installed in to working order (Including sunk switch). nr 4,195.00
I-037 5 Nos. of Pendent type lamp points to be controlled by one
switch - point wirings to be carried out with 2 x 1.0 mm2
PVC insulated PVC sheathed copper cables wired with PVC
casing on wall and on soffit of the slabs to be supplied and
installed in to working order (Including sunk switch). nr 4,981.00
I-038 Recessed type / Surface mounted type / Ceiling mounted
type lamp point wiring - to be carried out with 2 x 1.0 mm2
PVC insulated PVC sheathed copper cables wired with PVC
casing on wall and on soffit of the slabs to be supplied andinstalled in to working order (Including sunk switch). nr 1,516.00
I-039 2 Nos of Recessed type / Surface mounted type / Ceiling
mounted type lamp point wiring - to be carried out with 2 x
1.0 mm2PVC insulated PVC sheathed copper cables wired
with PVC casing on wall and on soffit of the slabs to be
supplied and installed in to working order (Including sunk
switch). nr 1,981.00
I-040 3 Nos of Recessed type / Surface mounted type / Ceiling
mounted type lamp point wiring - to be carried out with 2 x
1.0 mm2PVC insulated PVC sheathed copper cables wired
with PVC casing on wall and on soffit of the slabs to be
supplied and installed in to working order (Including sunk
switch). nr 2,447.00
I-041 4 Nos of Recessed type / Surface mounted type / Ceiling
mounted type lamp point wiring - to be carried out with 2 x
1.0 mm2PVC insulated PVC sheathed copper cables wired
with PVC casing on wall and on soffit of the slabs to be
supplied and installed in to working order (Including sunk
switch). nr 2,746.00
I-042 5 Nos of Recessed type / Surface mounted type / Ceiling
mounted type lamp point wiring - to be carried out with 2 x
1.0 mm2PVC insulated PVC sheathed copper cables wired
with PVC casing on wall and on soffit of the slabs to be
supplied and installed in to working order (Including sunk
switch). nr 3,377.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 152
7/22/2019 2014 - Including VAT
153/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
I-043 Watertight lamp point wiring - to be carried out with 2 x 1.0
mm2PVC insulated PVC sheathed copper cables wired with
PVC casing on wall and on soffit of the slabs to be supplied
and installed in to working order (Including sunk switch). nr 1,516.00
I-044 2 Nos. of Watertight lamp points to be controlled by one
switch - point wirings to be carried out with 2 x 1.0 mm2
PVC insulated PVC sheathed copper cables wired with PVC
casing on wall and on soffit of the slabs to be supplied and
installed in to working order (Including sunk switch). nr 1,981.00
I-045 3 Nos. of Watertight lamp points to be controlled by one
switch - point wirings to be carried out with 2 x 1.0 mm2
PVC insulated PVC sheathed copper cables wired with PVC
casing on wall and on soffit of the slabs to be supplied and
installed in to working order (Including sunk switch). nr 2,447.00
I-046 4 Nos. of Watertight lamp points to be controlled by one
switch - point wirings to be carried out with 2 x 1.0 mm2
PVC insulated PVC sheathed copper cables wired with PVC
casing on wall and on soffit of the slabs to be supplied and
installed in to working order (Including sunk switch). nr 2,912.00
I-047 5 Nos. of Watertight lamp points to be controlled by one
switch - point wirings to be carried out with 2 x 1.0 mm2
PVC insulated PVC sheathed copper cables wired with PVC
casing on wall and on soffit of the slabs to be supplied andinstalled in to working order (Including sunk switch). nr 3,377.00
I-048 Indoor bracket lamp point wiring - to be carried out with 2
x 1.0 mm2PVC insulated PVC sheathed copper cables
wired with PVC casing on wall and on soffit of the slabs to
be supplied and installed in to working order (Including
sunk switch). nr 1,516.00
I-049 2 Nos. of Indoor bracket lamp points to be controlled by one
switch - point wirings to be carried out with 2 x 1.0 mm2
PVC insulated PVC sheathed copper cables wired with PVCcasing on wall and on soffit of the slabs to be supplied and
installed in to working order (Including sunk switch). nr 1,981.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 153
7/22/2019 2014 - Including VAT
154/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
I-050 3 Nos. of Indoor bracket lamp points to be controlled by one
switch - point wirings to be carried out with 2 x 1.0 mm2
PVC insulated PVC sheathed copper cables wired with PVC
casing on wall and on soffit of the slabs to be supplied and
installed in to working order (Including sunk switch). nr 2,447.00
I-051 Stairway lamp point wiring - to be carried out with 2 x
1.0mm2PVC insulated PVC sheathed copper cables wired
with PVC casing on wall and on soffit of the slabs to be
supplied and installed in to working order (Including sunk
switch). nr 2,826.00
I-052 Ceiling fan point wiring complete with fan hook - to be
carried out with 2 x 1.0 mm2PVC insulated PVC sheathed
copper cables and 2.5mm2 earth cable wired with PVC
casing on wall and on soffit of the slabs to be supplied andinstalled in to working order (Including sunk switch). nr 1,894.00
I-053 5 A socket outlet - wiring to be carried out with 2 x 1.0mm2
PVC insulated PVC sheathed copper cables and 2.5mm2
earth cable wired with PVC casing on wall and on soffit of
the slabs to be supplied and installed in to working order. nr 1,816.00
I-054 2 Nos of 5 A socket outlets - wiring to be carried out with 2
x 2.5mm2PVC insulated PVC sheathed copper cables and
2.5mm2earth cable wired with PVC casing on wall and on
soffit of the slabs to be supplied and installed in to workingorder. nr 4,880.00
I-055 3 Nos of 5 A socket outlets - wiring to be carried out with 2
x 2.5mm2PVC insulated PVC sheathed copper cables and
2.5mm2earth cable wired with PVC casing on wall and on
soffit of the slabs to be supplied and installed in to working
order. nr 6,707.00
I-056 4 Nos of 5 A socket outlets - wiring to be carried out with 2
x 2.5mm
2
PVC insulated PVC sheathed copper cables and2.5mm
2earth cable wired with PVC casing on wall and on
soffit of the slabs to be supplied and installed in to working
order. nr 8,533.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 154
7/22/2019 2014 - Including VAT
155/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
I-057 13 A socket outlet / Grouped socket outlets -wiring to be
carried out with 2 x 2.5mm2PVC insulated PVC sheathed
copper cables and 2.5mm2earth cable wired with PVC
casing on wall and on soffit of the slabs to be supplied and
installed in to working order. For additional circuit length
over 10m, Item no I-224 should be added per meter. nr 3,053.00
I-058 15 A socket outlet -wiring to be carried out with 2 x 2.5mm2
PVC insulated PVC sheathed copper cables and 2.5mm2
earth cable wired with PVC casing on wall and on soffit of
the slabs to be supplied and installed in to working order.
For additional circuit length over 10m, Item no I-224 should
be added per meter. nr 3,053.00
I-059 Data socket outlet ( RJ 45 ) wiring be carried out with 5U/
UTP AWG 24 CAT 5E PVC cables wired with PVC
casing on wall and on soffit of the slabs to be supplied and
installed in to working order. nr 1,607.00
I-060 Data socket outlet ( RJ 45 ) wiring be carried out with 6U/
UTP AWG 24 CAT 6E PVC cables wired with PVC
conduits wired with PVC casing on wall and on soffit of
the slabs to be supplied and installed in to working order. nr 1,837.00
I-061 Telephone socket outlet ( RJ 11 ) wiring be carried out with
2X 0.5 mm2Single Pair - BS 3573 cables wired with PVC
casing on wall and on soffit of the slabs to be supplied andinstalled in to working order. nr 1,325.00
I-062 Telephone socket outlet ( RJ 11 ) wiring be carried out with
2X 0.5 mm2Two Pair - BS 3573 cables wired with PVC
casing on wall and on soffit of the slabs to be supplied and
installed in to working order. nr 1,577.00
I-063 Supplying and installing of 2 x 1 mm2 Cu/ PVC/ PVC
cable Concealed in conduits. m 137.00
I-064 Supplying and installing of 2 x 1.5 mm2 Cu/ PVC/ PVCcable Concealed in conduits. m 197.00
I-065 Supplying and installing of 2 x 2.5 mm2 Cu/ PVC/ PVC
cable Concealed in conduits. m 283.00
I-066 Supplying and installing of 2 x 4 mm2 Cu/ PVC/ PVC cable
Concealed in conduits. m 403.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 155
7/22/2019 2014 - Including VAT
156/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
I-067 Supplying and installing of 2 x 6 mm2 Cu/ PVC/ PVC cable
Concealed in conduits. m 549.00
I-068 Supplying and installing of 2 x 10 mm2 Cu/ PVC/ PVC
cable concealed in conduits. m 873.00
I-069 Supplying and installing of 2 x 16 mm2 Cu/ PVC/ PVC
cable Concealed in conduits. m 1,276.00
I-070 Supplying and installing of 2 x 25 mm2 Cu/ PVC/ PVC
cable Concealed in conduits. m 1,909.00
I-071 Supplying and installing of 2 x 1 mm2 Cu/ PVC/ PVC + 2.5
mm2E cable Concealed in conduits. m 217.00
I-072 Supplying and installing of 2 x 1.5 mm2 Cu/ PVC/ PVC +2.5 mm
2E cable Concealed in conduits. m 276.00
I-073 Supplying and installing of 2 x 2.5 mm2 Cu/ PVC/ PVC +
2.5 mm2E cable Concealed in conduits. m 363.00
I-074 Supplying and installing of 2 x 4 mm2 Cu/ PVC/ PVC + 2.5
mm2E cable Concealed in conduits. m 483.00
I-075 Supplying and installing of 2 x 6 mm2Cu/ PVC/ PVC + 6
mm2
E cable Concealed in conduits. m 742.00
I-076 Supplying and installing of 2 x 10 mm2 Cu/ PVC/ PVC +
10 mm2 cable concealed in conduits. m 1,192.00
I-077 Supplying and installing of 2 x 16 mm2 Cu/ PVC/ PVC +
16mm2E cable Concealed in conduits. m 1,771.00
I-078 Supplying and installing of 2 x 25 mm2 Cu/ PVC/ PVC +
16mm2 E cable Concealed in conduits. m 2,748.00
I-079 Supplying and installing of 4 x 4 mm2Cu/ PVC/ PVC cable
Concealed in conduits. m 750.00
I-080 Supplying and installing of 4 x 6 mm2Cu/ PVC/ PVC cable
Concealed in conduits. m 1,062.00
I-081 Supplying and installing of 4 x 10 mm2 Cu/ PVC/ PVC
cable concealed in conduits. m 1,648.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 156
7/22/2019 2014 - Including VAT
157/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
I-082 Supplying and installing of 4 x 16 mm2 Cu/ PVC/ PVC
cable Concealed in conduits. m 2,368.00
I-083 Supplying and installing of 4 x 25 mm2 Cu/ PVC/ PVC
cable Concealed in conduits. m 4,149.00
I-084 Supplying and installing of 4 x 35 mm2 PVC/XLPE/CU
cable Concealed in conduits. m 4,958.00
I-085 Supplying and installing of 4 x 4 mm2Cu/ PVC/ PVC + 4
mm2E cable Concealed in conduits. m 883.00
I-086 Supplying and installing of 4 x 6 mm2Cu/ PVC/ PVC + 6
mm2E cable Concealed in conduits. m 1,256.00
I-087 Supplying and installing of 4 x 10 mm2 Cu/ PVC/ PVC +
10 mm2 E cable concealed in conduits. m 1,967.00
I-088 Supplying and installing of 4 x 16 mm2 Cu/ PVC/ PVC +
16mm2E cable Concealed in conduits. m 2,863.00
I-089 Supplying and installing of 4 x 25 mm2 Cu/ PVC/ PVC +
16mm2E cable Concealed in conduits. m 4,149.00
I-090 Supplying and installing of 4 x 35 mm2 PVC/XLPE/CU +
16 mm2E cable Concealed in conduits. m 5,454.00
I-091 Supplying and installing of 2.5 mm2earth cable concealed
in conduit. m 163.00
I-092 Supplying and installing of 4 mm2earth cable concealed in
conduit. m 218.00
I-093 Supplying and installing of 6 mm2earth cable concealed in
conduit. m 278.00
I-094 Supplying and installing of 10 mm2 earth cable concealed inconduit. m 403.00
I-095 Supplying and installing of 16 mm2earth cable concealed in
conduit. m 589.00
I-096 Supplying and installing of 25 mm2earth cable concealed in
conduit. m 933.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 157
7/22/2019 2014 - Including VAT
158/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
I-097 Supplying and installing of 35 mm2earth cable concealed in
conduit. m 1,178.00
I-098 Supplying and installing of 2 x 1 mm2 Cu/ PVC/ PVC cable
with casin . m 155.00
I-099 Supplying and installing of 2 x 1.5 mm2 Cu/ PVC/ PVC
cable with casin . m 214.00
I-100 Supplying and installing of 2 x 2.5 mm2 Cu/ PVC/ PVC
cable with casin . m 301.00
I-101 Supplying and installing of 2 x 4 mm2 Cu/ PVC/ PVC cable
with casin . m 421.00
I-102Supplying and installing of 2 x 6 mm
2
Cu/ PVC/ PVC cablewith casin . m 574.00
I-103 Supplying and installing of 2 x 10 mm2 Cu/ PVC/ PVC
cable with casin . m 850.00
I-104 Supplying and installing of 2 x 16 mm2 Cu/ PVC/ PVC
cable with casin . m 1,242.00
I-105 Supplying and installing of 2 x 25 mm2 Cu/ PVC/ PVC
cable with casin . m 1,875.00
I-106 Supplying and installing of 2 x 1 mm2 Cu/ PVC/ PVC + 2.5
mm2E cable with casing. m 234.00
I-107 Supplying and installing of 2 x 1.5 mm2 Cu/ PVC/ PVC +
2.5 mm2E cable with casing. m 294.00
I-108 Supplying and installing of 2 x 2.5 mm2 Cu/ PVC/ PVC +
2.5 mm2E cable with casing. m 380.00
I-109 Supplying and installing of 2 x 4 mm2 Cu/ PVC/ PVC + 2.5
mm2
E cable Concealed in casing. m 500.00
I-110 Supplying and installing of 2 x 6 mm2Cu/ PVC/ PVC + 6
mm2E cable Concealed in casing. m 768.00
I-111 Supplying and installing of 2 x 10 mm2 Cu/ PVC/ PVC +
10 mm2 cable with casing. m 1,169.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 158
7/22/2019 2014 - Including VAT
159/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
I-112 Supplying and installing of 2 x 16 mm2 Cu/ PVC/ PVC +
16mm2E cable with casin . m 1,737.00
I-113 Supplying and installing of 2 x 25 mm2 Cu/ PVC/ PVC +
16mm2E cable with casing. m 2,714.00
I-114 Supplying and installing of 4 x 4 mm2Cu/ PVC/ PVC cable
with casing. m 775.00
I-115 Supplying and installing of 4 x 6 mm2Cu/ PVC/ PVC cable
with casing. m 1,039.00
I-116 Supplying and installing of 4 x 10 mm2 Cu/ PVC/ PVC
cable with casing. m 1,608.00
I-117 Supplying and installing of 4 x 16 mm2 Cu/ PVC/ PVC
cable with casing. m 2,328.00
I-118 Supplying and installing of 4 x 25 mm2 Cu/ PVC/ PVC
cable with casing. m 3,612.00
I-119 Supplying and installing of 4 x 4 mm2Cu/ PVC/ PVC + 4
mm2E cable with casing. m 4,917.00
I-120 Supplying and installing of 4 x 4 mm2Cu/ PVC/ PVC + 4
mm2
E cable with casing. m 909.00
I-121 Supplying and installing of 4 x 6 mm2Cu/ PVC/ PVC + 6
mm2E cable with casing. m 1,232.00
I-122 Supplying and installing of 4 x 10 mm2 Cu/ PVC/ PVC +
10 mm2 cable with casing. m 1,927.00
I-123 Supplying and installing of 4 x 16 mm2 Cu/ PVC/ PVC +
16mm2 E cable with casin . m 2,823.00
I-124 Supplying and installing of 4 x 25 mm2 Cu/ PVC/ PVC +
16mm2E cable with casing. m 4,108.00
I-125 Supplying and installing of 4 x 35 mm2
PVC/XLPE/CU +
16 mm2E cable with Casing. m 5,413.00
I-126 Supplying and installing of 2.5 mm2earth cable with casing. m 181.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 159
7/22/2019 2014 - Including VAT
160/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
I-127 Supplying and installing of 4 mm2earth cable with casing. m 235.00
I-128 Supplying and installing of 6 mm2earth cable with casing. m 295.00
I-129 Supplying and installing of 10 mm2earth cable with casing. m 421.00
I-130 Supplying and installing of 16 mm2earth cable with casing. m 614.00
I-131 Supplying and installing of 25 mm2earth cable with casing. m 958.00
I-132 Supplying and installing of 35 mm2earth cable with casing. m 1,204.00
I-133 Supplying and installing of 4X35mm2CU/XLPE/SWA/PVC
- Armourd cable (Excluding Floor excavation, Civil works
or Cable ladder installation) m 5,556.00
I-134 Supplying and installing of 4X25mm2CU/XLPE/SWA/PVC
- Armourd cable (Excluding Floor excavation, Civil works
or Cable ladder installation) m 4,596.00
I-135 Supplying and installing of 2X25mm2CU/XLPE/SWA/PVC
- Armoured cable (Excluding Floor excavation, Civil works
or Cable ladder installation) m 3,336.00
I-136 Supplying and installing of 2X35mm2CU/XLPE/SWA/PVC
- Armourd cable (Excluding Floor excavation, Civil worksor Cable ladder installation) m 4,416.00
I-137 Supplying and installing of 2X4 mm2CU/PVC/SWA/PVC -
Armourd cable (Excluding Floor excavation, Civil works or
Cable ladder installation) m 1,176.00
I-138 Supplying and installing of 2X6 mm2CU/PVC/SWA/PVC -
Armourd cable (Excluding Floor excavation, Civil works or
Cable ladder installation) m 1,416.00
I-139 Supplying and installing of 2X10 mm2
CU/PVC/SWA/PVC -Armourd cable (Excluding Floor excavation, Civil works or
Cable ladder installation) m 1,776.00
I-140 Supplying and installing of 2X16 mm2CU/PVC/SWA/PVC
cable (Excluding Floor excavation, Civil works or Cable
ladder installation) m 2,496.00
Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 160
7/22/2019 2014 - Including VAT
161/252
ITEM NO DESCRIPTION UNIT
RATES
INCLUDING
VAT
I-141 Supplying and installing of 4X2.5 mm2CU/PVC/SWA/PVC
- Armourd cable (Excluding Floor excavation, Civil works
or Cable ladder installation) m 876.00
I-142 Supplying and installing of 4X4 mm2CU/PVC/SWA/PVC -
Armourd cable (Excluding Floor excavation, Civil works or
Cable ladder installation) m 1,296.00
I-143 Supplying and installing of 4X6 mm2CU/PVC/SWA/PVC -
Armourd cable (Excluding Floor excavation, Civil works or
Cable ladder installation) m 1,716.00
I-144 Supplying and installing of 4X10 mm2CU/PVC/SWA/PVC -
Armourd cable (Excluding Floor excavation, Civil works or
Cable ladder installation) m 2,676.00
I-145 Supplying and installing o