    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    1

  • 7/22/2019 2014 - Including VAT

    2/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    2

  • 7/22/2019 2014 - Including VAT

    3/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    3

  • 7/22/2019 2014 - Including VAT

    4/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    4

  • 7/22/2019 2014 - Including VAT

    5/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    5

  • 7/22/2019 2014 - Including VAT

    6/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    6

  • 7/22/2019 2014 - Including VAT

    7/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    7

  • 7/22/2019 2014 - Including VAT

    8/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    8

  • 7/22/2019 2014 - Including VAT

    9/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    9

  • 7/22/2019 2014 - Including VAT

    10/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    10

  • 7/22/2019 2014 - Including VAT

    11/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    11

  • 7/22/2019 2014 - Including VAT

    12/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    12

  • 7/22/2019 2014 - Including VAT

    13/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    13

  • 7/22/2019 2014 - Including VAT

    14/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    14

  • 7/22/2019 2014 - Including VAT

    15/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    15

  • 7/22/2019 2014 - Including VAT

    16/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    16

  • 7/22/2019 2014 - Including VAT

    17/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    17

  • 7/22/2019 2014 - Including VAT

    18/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    18

  • 7/22/2019 2014 - Including VAT

    19/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    19

  • 7/22/2019 2014 - Including VAT

    20/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    20

  • 7/22/2019 2014 - Including VAT

    21/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    21

  • 7/22/2019 2014 - Including VAT

    22/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    22

  • 7/22/2019 2014 - Including VAT

    23/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    23

  • 7/22/2019 2014 - Including VAT

    24/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    24

  • 7/22/2019 2014 - Including VAT

    25/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    25

  • 7/22/2019 2014 - Including VAT

    26/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    26

  • 7/22/2019 2014 - Including VAT

    27/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    27

  • 7/22/2019 2014 - Including VAT

    28/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    28

  • 7/22/2019 2014 - Including VAT

    29/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    29

  • 7/22/2019 2014 - Including VAT

    30/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    30

  • 7/22/2019 2014 - Including VAT

    31/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    31

  • 7/22/2019 2014 - Including VAT

    32/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    32

  • 7/22/2019 2014 - Including VAT

    33/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    33

  • 7/22/2019 2014 - Including VAT

    34/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    34

  • 7/22/2019 2014 - Including VAT

    35/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    35

  • 7/22/2019 2014 - Including VAT

    36/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    36

  • 7/22/2019 2014 - Including VAT

    37/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    37

  • 7/22/2019 2014 - Including VAT

    38/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    38

  • 7/22/2019 2014 - Including VAT

    39/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    39

  • 7/22/2019 2014 - Including VAT

    40/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    40

  • 7/22/2019 2014 - Including VAT

    41/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    41

  • 7/22/2019 2014 - Including VAT

    42/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    42

  • 7/22/2019 2014 - Including VAT

    43/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    43

  • 7/22/2019 2014 - Including VAT

    44/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    44

  • 7/22/2019 2014 - Including VAT

    45/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    45

  • 7/22/2019 2014 - Including VAT

    46/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    46

  • 7/22/2019 2014 - Including VAT

    47/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    47

  • 7/22/2019 2014 - Including VAT

    48/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    48

  • 7/22/2019 2014 - Including VAT

    49/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    49

  • 7/22/2019 2014 - Including VAT

    50/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    50

  • 7/22/2019 2014 - Including VAT

    51/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    51

  • 7/22/2019 2014 - Including VAT

    52/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    52

  • 7/22/2019 2014 - Including VAT

    53/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    53

  • 7/22/2019 2014 - Including VAT

    54/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    54

  • 7/22/2019 2014 - Including VAT

    55/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    55

  • 7/22/2019 2014 - Including VAT

    56/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    56

  • 7/22/2019 2014 - Including VAT

    57/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    57

  • 7/22/2019 2014 - Including VAT

    58/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    58

  • 7/22/2019 2014 - Including VAT

    59/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    59

  • 7/22/2019 2014 - Including VAT

    60/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    60

  • 7/22/2019 2014 - Including VAT

    61/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    61

  • 7/22/2019 2014 - Including VAT

    62/252

    ITEM

    NODESCRIPTION UNIT

    RATE INCLUDING

    VAT

    Y-001 Transport of metal, sand,gravel and earthbeyond 10 km per km, rate for one cube. km 102.00

    Y-002 Transport of cement beyond 10 km per

    km, rate for one bag (50kg) km 1.02

    Y-003 Transport of steel beyond 10 km per km,

    rate for 1000kg. km 20.40

    Y-004 Transport of bricks beyond 10 km per km,

    rate for 1000Nos. km 51.00

    Y-005 Transport of calicut tile beyond 10 km per

    km, rate for 1000Nos. km 51.00

    A.) Head transport of materials:

    Note:-

    Cement

    A1. High steep areas (Nominal ground slope more

    than 20% ) Beyond 30 m , and there after every100m or it's portion

    50kg

    0.05 X unskilled labour

    rate per day.

    A2. Modarate Steep areas (Nominal ground slope

    10% to 20% ) Beyond 30 m , and there after

    every 100m or it's portion50kg

    0.03 X unskilled labour

    rate per day.

    A3. Flat areas (Nominal ground slope up to 10% )

    Beyond 30 m , and there after every 100m or

    it's portion50kg

    0.02 X unskilled labour

    rate per day.

    SECTION XIV- SCHEDULE OF TRANSPORT

    According to the head transport as per report of central provincial council

    price committee 2014 .

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    62

  • 7/22/2019 2014 - Including VAT

    63/252

    ITEM

    NODESCRIPTION UNIT

    RATE INCLUDING

    VAT

    Sand , Metal and Soil

    A4. High steep areas (Ground slope more than 20%

    ) Beyond 30 m , and there after every 100m or

    it's portion

    cu

    a.) Normal ground :-

    3 X unskilled labour rate

    per day

    b.) Difficult ground :-

    4 X unskilled labour rate

    per day

    A5. Modarate Steep areas (Ground slope 10% to

    20% ) Beyond 30 m , and there after every

    100m or it's portion

    cu

    a.) Normal ground :-

    2 X unskilled labour rate

    per day

    b.) Difficult ground :-

    3 X unskilled labour rate

    per day

    A6. Flat areas ( Ground slope up to 10% ) Beyond

    30 m , and there after every 100m or it's portion

    cu

    a.) Normal ground :-

    1 X unskilled labour rate

    per day

    b.) Difficult ground :-

    2 X unskilled labour rate

    per day

    Bricks

    A7. High steep areas (Nominal ground slope more

    than 20% ) Beyond 30 m , and there after every

    100m or it's portion 1000 nr

    2.0 X unskilled labour rate

    per day

    A8. Modarate Steep areas (Nominal ground slope

    10% to 20% ) Beyond 30 m , and there after

    every 100m or it's portion 1000 nr

    1.0 X unskilled labour rate

    per day

    A9. Flat areas (Nominal Ground slope up to 10% )

    Beyond 30 m , and there after every 100m or

    it's portion 1000 nr

    0.5 X unskilled labour rate

    per day

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    63

  • 7/22/2019 2014 - Including VAT

    64/252

    ITEM

    NODESCRIPTION UNIT

    RATE INCLUDING

    VAT

    Steel

    A10. High steep areas (Nominal ground slope more

    than 20% ) Beyond 30 m , and there after every

    100m or it's portion Mt

    2.0 X unskilled labour rate

    per day

    A11. Modarate Steep areas (Nominal ground slope

    10% to 20% ) Beyond 30 m , and there after

    every 100m or it's portion Mt

    1.0 X unskilled labour rate

    per day

    A12. Flat areas (Nominal Ground slope up to 10% )

    Beyond 30 m , and there after every 100m or

    it's portion Mt

    0.5 X unskilled labour rate

    per day

    B.) Add only overhead and profit for the above head transport item

    * Total head transport rate = A + B

    Example :-Consider head transport item A5.

    (Normal ground :- 2 X unskilled labour rate per day) + (overhead and profit )

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    64

  • 7/22/2019 2014 - Including VAT

    65/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    65

  • 7/22/2019 2014 - Including VAT

    66/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    66

  • 7/22/2019 2014 - Including VAT

    67/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    67

  • 7/22/2019 2014 - Including VAT

    68/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    68

  • 7/22/2019 2014 - Including VAT

    69/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    69

  • 7/22/2019 2014 - Including VAT

    70/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    70

  • 7/22/2019 2014 - Including VAT

    71/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    71

  • 7/22/2019 2014 - Including VAT

    72/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    72

  • 7/22/2019 2014 - Including VAT

    73/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    73

  • 7/22/2019 2014 - Including VAT

    74/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    74

  • 7/22/2019 2014 - Including VAT

    75/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    75

  • 7/22/2019 2014 - Including VAT

    76/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    76

  • 7/22/2019 2014 - Including VAT

    77/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    77

  • 7/22/2019 2014 - Including VAT

    78/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    78

  • 7/22/2019 2014 - Including VAT

    79/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    79

  • 7/22/2019 2014 - Including VAT

    80/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    80

  • 7/22/2019 2014 - Including VAT

    81/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    81

  • 7/22/2019 2014 - Including VAT

    82/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    82

  • 7/22/2019 2014 - Including VAT

    83/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    83

  • 7/22/2019 2014 - Including VAT

    84/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    84

  • 7/22/2019 2014 - Including VAT

    85/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    85

  • 7/22/2019 2014 - Including VAT

    86/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    86

  • 7/22/2019 2014 - Including VAT

    87/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    87

  • 7/22/2019 2014 - Including VAT

    88/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    88

  • 7/22/2019 2014 - Including VAT

    89/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    89

  • 7/22/2019 2014 - Including VAT

    90/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    90

  • 7/22/2019 2014 - Including VAT

    91/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    91

  • 7/22/2019 2014 - Including VAT

    92/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    92

  • 7/22/2019 2014 - Including VAT

    93/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    93

  • 7/22/2019 2014 - Including VAT

    94/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    94

  • 7/22/2019 2014 - Including VAT

    95/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    95

  • 7/22/2019 2014 - Including VAT

    96/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    96

  • 7/22/2019 2014 - Including VAT

    97/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    97

  • 7/22/2019 2014 - Including VAT

    98/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    98

  • 7/22/2019 2014 - Including VAT

    99/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    99

  • 7/22/2019 2014 - Including VAT

    100/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    100

  • 7/22/2019 2014 - Including VAT

    101/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    101

  • 7/22/2019 2014 - Including VAT

    102/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    102

  • 7/22/2019 2014 - Including VAT

    103/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    103

  • 7/22/2019 2014 - Including VAT

    104/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    104

  • 7/22/2019 2014 - Including VAT

    105/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    105

  • 7/22/2019 2014 - Including VAT

    106/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    106

  • 7/22/2019 2014 - Including VAT

    107/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    107

  • 7/22/2019 2014 - Including VAT

    108/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    108

  • 7/22/2019 2014 - Including VAT

    109/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    109

  • 7/22/2019 2014 - Including VAT

    110/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    110

  • 7/22/2019 2014 - Including VAT

    111/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    111

  • 7/22/2019 2014 - Including VAT

    112/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    112

  • 7/22/2019 2014 - Including VAT

    113/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    113

  • 7/22/2019 2014 - Including VAT

    114/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    114

  • 7/22/2019 2014 - Including VAT

    115/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    115

  • 7/22/2019 2014 - Including VAT

    116/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    116

  • 7/22/2019 2014 - Including VAT

    117/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    117

  • 7/22/2019 2014 - Including VAT

    118/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    118

  • 7/22/2019 2014 - Including VAT

    119/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    119

  • 7/22/2019 2014 - Including VAT

    120/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    120

  • 7/22/2019 2014 - Including VAT

    121/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    121

  • 7/22/2019 2014 - Including VAT

    122/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    122

  • 7/22/2019 2014 - Including VAT

    123/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    123

  • 7/22/2019 2014 - Including VAT

    124/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    124

  • 7/22/2019 2014 - Including VAT

    125/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    125

  • 7/22/2019 2014 - Including VAT

    126/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    126

  • 7/22/2019 2014 - Including VAT

    127/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    127

  • 7/22/2019 2014 - Including VAT

    128/252

    Q.S.BRANCH ,DEPARTMENT OF ENGINEERING SERVICES 2014 Including VAT

    128

  • 7/22/2019 2014 - Including VAT

    129/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    SECTION I - MASONRY WORKS.

    B-001 Brick work in 1:5 cement sand mortar 225mm thick and

    above in foundations up to D.P.C . m3

    10,721.00

    B-002 Brick work in 1:8 cement sand mortar 225mm thick in super

    structure in ground floor. m3

    10,373.00

    B-003 Brick work in 1:5 cement sand mortar 112.5mm thick in

    ground floor. m2

    1,356.00

    B-004 Brick work in 1:5 cement sand mortar 112.5mm thick usingavailable bricks. m

    2 814.00

    B-005 Brick work in 1:8 cement & sand mortar 225mm thick or

    above. (using available bricks) m3

    4,888.00

    B-006 Masonry block work 100mm thick in walls in cement and

    sand 1:5 motar using hollow blocks made of cement and

    sand to the proportion of 1:10, confirming to SLS standard

    in ground floor. m2

    1,339.00

    B-007 Masonry block work 150mm thick in walls in cement and

    sand 1:5 motar using hollow blocks made of cement andsand to the proportion of 1:10, confirming to SLS standard

    in ground floor. m2

    1,558.00

    B-008 Masonry block work 200mm thick in cement and sand 1:5

    motar using hollow blocks made of cement and sand to a

    proportion of 1:10, confirming to SLS standard in ground

    floor. m2

    2,099.00

    B-009 R.R masonry in 1:5 cement and sand motar in foundations

    using available rubble. m3

    7,768.00

    B-010 R.R masonry in 1:5 cement and sand motar in foundations. m3

    9,374.00

    B-011 R.R masonry in 1:5 cement and sand motar in

    superstructure.m

    3 10,186.00

    B-012 Provision of weep holes in retaining walls with 90mm dia.

    PVC down pipes including metal packing around inner

    mouth as directed, length of pipe up to 1050mm. nr 480.00

    BUILDING SCHEDULE OF RATES EFFECTIVE FROM

    2014 JANUARY

    RATES INCLUDING VAT

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 129

  • 7/22/2019 2014 - Including VAT

    130/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    B-013 Provision of weep holes in retaining walls with 90mm dia.

    PVC down pipes including metal packing around inner

    mouth as directed, length of pipe 1200mm to 1650mm. nr 620.00

    B-014 Provision of weep holes in retaining walls with 90mm dia.PVC down pipes including metal packing around inner

    mouth as directed, length of pipe 1800mm to 2250mm. nr 758.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 130

  • 7/22/2019 2014 - Including VAT

    131/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    SECTION II - CONCRETOR

    C-001 Mixing and placing in position concrete grade 30, nominal

    mix 1:1 :2 (20mm) using a concrete mixer including fuel /

    operator / handling/vibrator. m3 21,580.00

    C-002 Mixing and placing in position concrete grade 25, nominal

    mix 1:1 1/2:3 ( 20mm) using a concrete mixer including fuel

    / operator / handling/vibrator. m3

    17,883.00

    C-003 Mixing and placing in position concrete grade 20, nominal

    mix 1:2:4 ( 20mm) using a concrete mixer including fuel /

    operator / handling/vibrator. m3

    16,261.00

    C-004 Mixing and placing in position concrete 1:21/2:5(25mm)

    using a concrete mixer including fuel / operator /handling/vibrator. m3

    12,488.00

    C-005 Mixing and placing in position concrete 1:3:6 (40mm) using

    a concrete mixer including fuel / operator /

    handling/vibrator. m3

    12,002.00

    C-006 Tor steel reinforcement bend to shape laid in position and

    tied with G.I. wire as directed. Kg 253.00

    C-007 Mild steel reinforcement bend to shape laid in position and

    tied with G.I. wire as directed. Kg 234.00

    C-008 Sawn timber formwork in class III timber for columns,

    ground floor. m2

    1,354.00

    C-009 Sawn timber form work in class III timber for underside of

    ground floor slabs. m2

    1,273.00

    C-010 Sawn timber form work in class III timber for concrete

    beams. m2

    1,329.00

    C-011 Sawn timber formwork in class III timber for portal frames. m2

    1,639.00

    C-012 Sawn timber formwork in class III timber for groundconcrete work,at ground level plinth beams,lintols etc. m

    2 1,030.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 131

  • 7/22/2019 2014 - Including VAT

    132/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    C-013 2400mm x 600mm x 450mm plat form with 75mm thick

    1:3:6 (40mm) base & 2400mm x 300mm x 225mm step in

    rubble and 75mm thick 1:2 1/2:5 (25mm) concrete topping.

    Inclusive of 1:3 cement and sand rendering finished smooth

    with coloured cement floating and polishing and providingthree numbers 2"dia.medium duty G.I.pipe flag post

    complete with painting and provide necessary arrangements

    for hoisting the flag. nr 39,043.00

    C-014 Concrete catch pits / valve chambers in 50mm thick

    1:2:4(20mm) concrete side walls and internal faces cement

    rendered with 1:3 cement and sand finished smooth, to be

    leak proof, inclusive of provision for necessary pipe

    connection etc, with suitable cover or grating on top to be

    flush with floor level. Internal dimensions 150mm x 150mm

    x 300mm. nr 671.00

    C-015 Concrete catch pits / valve chambers in 50mm thick

    1:2:4(20mm) concrete side walls and internal faces cement

    rendered with 1:3 cement and sand finished smooth, to be

    leak proof, inclusive of provision for necessary pipe

    connection etc, with suitable cover or grating on top to be

    flush with floor level. Internal dimensions 150mm x 150mm

    x 450mm. nr 858.00

    C-016 Concrete catch pits / valve chambers in 50mm thick

    1:2:4(20mm) concrete side walls and internal faces cement

    rendered with 1:3 cement and sand finished smooth, to beleak proof, inclusive of provision for necessary pipe

    connection etc, with suitable cover or grating on top to be

    flush with floor level. Internal dimensions 300mm x 300mm

    x 450mm. nr 1,823.00

    C-017 Drain 225mm X 150mm (average depth) concrete 1:2 1/2:5

    (25mm) 75mm thick, provide expansion joints at 3000mm

    crs 12mm thick , 1:3 cement sand rendering finished

    smooth, including necessary excavation, form work, laying

    polythene membrane under concrete and laid to required

    slope. m 1,569.00

    C-018 Drain 225mm X 300mm (average depth) concrete 1:2 1/2:5

    (25mm) 75mm thick, provide expansion joints at 3000mm

    crs 12.5mm thick , 1:3 cement sand rendering finished

    smooth, including necessary excavation, form work, laying

    polythene membrane under concrete and laid to required

    slo e. m 2,554.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 132

  • 7/22/2019 2014 - Including VAT

    133/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    C-019 Drain 225mm x 450mm (average depth) concrete 1:2 1/2:5

    (25mm) 75mm thick, provide expansion joints at 3000mm

    crs 12.5mm thick , 1:3 cement sand rendering finished

    smooth, including necessary excavation, form work, laying

    polythene membrane under concrete and laid to requiredslope. m 3,224.00

    C-020 750mm wide ramp and 225mm X 150mm(average depth)

    drain in 1:2 1/2:5(25mm) concrete 75mm thick with 1:3

    plaster finished smooth, including necessary excavation,

    form work, providing expansion joints at 3000mm crs and

    laying polythene membrane under concrete and laid to

    required slope. m 2,731.00

    C-021 Concrete cover slabs 50mm thick 1:2:4 (20 mm) r/f with,

    6mm dia. MS bars at bottom @ 100mm centre. both ways,

    1:3 cement and sand rendering finished smooth, pre-cast in,

    pieces not exceeding 600mm x 450mm placed in position as

    directed, providing drain holes if required. m2

    3,391.00

    C-022 Ready mixed concrete grade 20 , 1:2:4(20mm) pumping to

    any level, rate including transporting, pumping, placing,

    porker vibrating, levelling and curing the concrete. (Rate for

    above 30m3) for Kandy area. m

    3 18,712.00

    C-023 Ready mixed concrete grade 20 , 1:2:4(20mm) pumping to

    any level, rate including transporting, pumping, placing,

    porker vibrating, levelling and curing the concrete. (Rate for

    above 30m3) for Gampola / Matale area. m

    3 19,457.00

    C-024 Ready mixed concrete grade 20 , 1:2:4(20mm) pumping to

    any level, rate including transporting, pumping, placing,

    porker vibrating, levelling and curing the concrete. (Rate for

    above 30m3) for Dambulla / Naula area. m

    3 20,992.00

    C-025 Ready mixed concrete grade 20 , 1:2:4(20mm) pumping to

    any level, rate including transporting, pumping, placing,

    porker vibrating, levelling and curing the concrete. (Rate for

    above 30m3 ) for Nawalapitiya area. m3 20,134.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 133

  • 7/22/2019 2014 - Including VAT

    134/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    SECTION III - DEMOLISHER

    D-001 Ceiling asbestos removing including timber framework,

    stacking serviceable materials and debris cleared away. in

    single storied building. (Ceiling Only) m2

    301.00

    D-002 Ceiling asbestos removing including timber frame work,

    stacking serviceable materials and debris cleared away in

    two storied building. (Ceiling Only) m2

    332.00

    D-003 Partitions, weld mesh, shelves removed from existing walls

    and stacking. m2

    127.00

    D-004 225mm wide drain in brick masonry, demolishing and

    clearing debris. m 119.00

    D-005 Floor paving brick, concrete or rubble inclusive of renderingand debris cleared away. m

    2120.00

    D-006 Corrugated sheets, iron, asbestos or aluminium alloy

    removed from roof including frame work inclusive of wiring

    and fixtures, gutters, valance boards etc.. in single story

    buildings. m2

    101.00

    D-007 Corrugated sheets, iron, asbestos or aluminium alloy

    removed from roof including frame work inclusive of wiring

    and fixtures, gutters, valance boards etc.. in two storied

    buildings. m2

    111.00

    D-008 Corrugated sheets, iron, asbestos or aluminium alloy

    removed from roof including frame work inclusive of wiring

    and fixtures, gutters, valance boards etc.. in three storied

    buildings. m2

    118.00

    D-009 Roof removing tiles with frame work inclusive of wiring

    and fixtures, gutters, valance boards etc., stacking

    serviceable material and debris cleared away in single

    storied buildin s. m2

    163.00

    D-010 Roof removing tiles with frame work inclusive of wiring

    and fixtures, gutters, valance boards etc., stacking

    serviceable material and debris cleared away in two storied

    buildings. m2

    223.00

    D-011 Roof removing tiles with frame work inclusive of wiring

    and fixtures, gutters, valance boards etc., stacking

    serviceable material and debris cleared away in three

    storied buildings. m2

    276.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 134

  • 7/22/2019 2014 - Including VAT

    135/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    D-012 Tiles calicut or half round, removed from roof of single

    storey buildings including stacking serviceable material and

    debris cleared away. m2

    60.00

    D-013 Tiles calicut or half round, removed from roof of two storeybuildings including stacking serviceable material and debris

    cleared away. m2

    90.00

    D-014 Tiles calicut or half round, removed from roof of three

    storied buildings and above, including stacking serviceable

    material and debris cleared away. m2

    120.00

    D-015 Removing and stacking trusses steel or timber 6.1m (20

    L.ft) of span from single story building. nr 2,279.00

    D-016 Removing and stacking trusses steel or timber 7.6m (25L.ft) of span from single story building. nr 2,849.00

    D-017 Removing and stacking trusses steel or timber 9.1m (30

    L.ft) of span from single story building. nr 3,418.00

    D-018 Demolishing walls bricks 112.5mm thick inclusive of

    plaster and any fixtures including debris cleared away. m2

    239.00

    D-019 Demolishing walls bricks above 225mm thick inclusive of

    plaster and any fixtures includingdebris cleared away. m3

    982.00

    D-020 Demolishing rubble masonry in cement and sand inclusive

    of plaster and any fixtures, rubble stacked and removing

    debris . m3

    1,222.00

    D-021 Demolishing reinforced concrete walls, beams or slabs up to

    first floor and debris cleared away. m3

    7,848.00

    D-022 Demolishing reinforced concrete walls, beams or slabs up to

    second floor and debris cleared away. m3

    8,251.00

    D-023 Demolishing reinforced concrete walls, beams or slabs up to

    third floor and debris cleared away. m3 8,854.00

    D-024 Door or window size up to 4.0m2

    removed from existing

    walls and stacked. nr 1,107.00

    D-025 Door or window size over 4.0m2

    removed from existing

    walls and stacked. nr 1,661.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 135

  • 7/22/2019 2014 - Including VAT

    136/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    D-026 Door or window (sash only) size up to 4.0m2

    removed from

    existing frames and stacked. m2

    142.00

    D-027 Door or window sash only size over 4.0m removed from

    existing frame and stacked. m2 213.00

    D-028 Gutters, down pipes, valleys GI or PVC including specials

    removed and stacked. m 30.00

    D-029 Boards, valance and barge removed and stacked. m 23.00

    D-030 Low-level suits, squatting closets removed and stacked. nr 443.00

    D-031 Wash basins, cisterns, sinks, urinals removed and stacked. nr 277.00

    D-032 Ridges, asbestos or tile, removed and stacked. m 44.00

    D-033 Pipes PVC, GI, removed and stacked. m 15.00

    D-034 Rendering, cement, chipped and debris cleared away from

    brick walls and floors. m2

    134.00

    D-035 Rendering, cement, chipped and debris cleared away from

    cement concrete floors and walls. m2

    201.00

    D-036 Fence uprooted, barbed wire 5 strands rolled up and all

    materials stacked (Length of the fence to be measured). m 173.00

    D-037 Tiled, glazed floor or wall demolished and debris cleared. m2

    238.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 136

  • 7/22/2019 2014 - Including VAT

    137/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    SECTION IV - EXCAVATOR

    E-001 Earth excavation in levelling site inclusive of haulage up to

    30 m. (manual cutting only up to 450m3

    ) m3

    603.00

    E-002 Earth excavation in levelling site inclusive of haulage up to

    30 m. (machine cutting only) in ordinary soil. m3

    116.00

    E-003 Excavation in foundations in normal earth up to depth of

    1.5m inclusive of backfilling, compacting and disposal of

    surplus earth. m3

    897.00

    E-004 Excavation in foundations in soft rock requiring manual

    digging, up to a depth of 1.5m inclusive of backfilling and

    disposal of surplus materials. m3

    1,199.00

    E-005 Excavation in levelling site in hard rock involving blasting

    inclusive of haulage up to 30 m, and piling rubble. Extra

    over earth excavation payable on rubble measurement only. m3

    1,625.00

    E-006 Excavation in levelling site in soft rock involving manual

    digging inclusive of haulage up to 30 m. m3

    1,190.00

    E-007 Excavation in wells / pits in normal earth up to depth of

    1.5m inclusive of backfilling behind wall / ring and disposal

    of surplus earth, rate excluding for shoring. m3

    995.00

    E-008 Excavation in wells / pits in normal earth 1.5m to 3.0m

    depth inclusive of backfilling behind wall /ring and

    disposal of surplus earth, rate excluding for shoring. m3

    1,386.00

    E-009 Excavation in wells / pits in normal earth 3.0m to 4.5m

    depth inclusive of backfilling behind wall /ring and

    disposal of surplus earth, rate excluding for shoring. m3

    1,972.00

    E-010 Excavation in wells / pits in normal earth 4.5m to 6.0m

    depth inclusive of backfilling behind wall /ring and

    disposal of surplus earth, rate excluding for shoring. m3 2,567.00

    E-011 Filling earth and compacting (as approved by Engineer)

    150mm layers in large quantities. Rate includes for

    transport of 30 m. m3

    701.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 137

  • 7/22/2019 2014 - Including VAT

    138/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    E-012 Filling earth and compacting (as approved by Engineer)

    150mm layers under floors. Rate includes for transport of

    30 m. m3

    807.00

    E-013 Shoring for excavations up to 3m height. m2 568.00

    E-014 Wells bailed out and cleaned total depth up to 3.0m

    (measured, capacity of well below water table). m3

    297.00

    E-015 Wells bailed out and cleaned total depth up to 4.8m

    (measured, capacity of well below water table). m3

    594.00

    E-016 Wells bailed out and cleaned total depth up to 7.5m

    (measured, capacity of well below water table). m3

    832.00

    E-017 Extra over excavation for removing boulders size exceeding0.05m

    3,in any manner (Volume of each boulder measured

    as 0.75 x Average height x Squared Area). m3

    1,929.00

    E-018 Haulage of earth more than 30m away from site deposited

    and spread by any means. m3

    238.00

    E-019 Levelling ground to required grading cutting lumps and

    spreading and compacting manually. m2

    24.00

    E-020 Disposal of surplus earth, inclusive of loading and

    unloading and transport up to 10 km.(Using Mechine) m3

    334.00

    E-021 Compacting approved gravel, filled in 150mm layers by

    manual tamping as specified. (Gravel available at site) m3

    589.00

    E-022 River sand supplied and spread in layers as specified under

    foundations, drainage sand blankets, filters, around soakage

    pits, wells etc. m3

    2,087.00

    E-023 Compacting approved gravel in 150mm layers by any means

    except manual tamping as specified. (Gravel available at

    site)m

    3

    353.00

    E-024 Rock excavation in column footings or wall foundations. m3

    3,722.00

    E-025 Sand filling under foundations. (As a cushion) m3

    2,061.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 138

  • 7/22/2019 2014 - Including VAT

    139/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    SECTION V - PAVIOR

    F-001 Floor - Brick 62mm thick, 1:3 cement & sand rendered

    finished smooth with gray cement floating with expansion

    joints filled in 1:2 bitumen and sand. (Rate including for

    brick paved with 2:5 lime mortar and curing) m2

    1,727.00

    F-002 Floor - Brick 62mm thick, 1:3 cement & sand rendered

    finished smooth with gray cement floating with expansion

    joints filled in 1:2 bitumen and sand. (Rate including for

    brick paved with 2:5 lime mortar and curing). Bricks

    available at site. m2

    1,401.00

    F-003 Floor concrete 1:2 1/2:5(25mm) 75mm thick, 1:3 normal

    cement rendering finished smooth with expansion joints

    filled with 1:2 bitumen and sand. Rate including for curing,

    compacting ground and laying polythene sheets under the

    concrete. m2 1,566.00

    F-004 Floor concrete 1:2 1/2:5(25mm) 62mm thick, 1:3 normal

    cement rendering finished smooth with expansion joints

    filled with 1:2 bitumen and sand. Rate including for curing,

    compacting ground and laying polythene sheets under the

    concrete. m2

    1,293.00

    F-005 Floor concrete 1:2 1/2:5(25mm) 75mm thick with expansion

    joints filled with 1:2 bitumen and sand rate including for

    curing, compacting ground and laying polythene sheet under

    the concrete. m2

    971.00

    F-006 Floor concrete 1:2 1/2:5(25mm) 62mm thick with expansion

    joints filled with 1:2 bitumen and sand rate including for

    curing, compacting ground and laying polythene sheet under

    the concrete. m2

    698.00

    F-007 Extra over supplying & fixing tile beading (Small) m 56.00

    F-008 Extra over Supplying & fixing tile beading (Large) m 98.00

    F-009 A) Floor paved with approved pattern and colour

    (homogeneous /porcelain /ceramic) floor tiles on 1:3 cement

    mortar, joints filled with tile grout, to match the colour of

    tiles and cleaning. (Tile rate not included) m2 1,279.00

    B) Add only the cost of tile + overhead and profit per m2

    (Tile)for the above rate.

    * Total floor tiling rate A + B

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 139

  • 7/22/2019 2014 - Including VAT

    140/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    F-010 A) 100mm high tile skirting approved pattern and colour

    (homogeneous/porcelain /ceramic) floor tiles on 1:3 cement

    mortar, joints filled with tile grout to match the colour of

    tiles and cleaning. (Tile rate not included) m 195.00

    B) Add only the cost of tile + overhead and profit per "m"

    (Tile skirting)for the above rate.

    * Total tile skirting rate A + B

    F-011 Floor re-rendered with 1:3 cement and sand after demolition

    and clearance of damaged areas, providing expansion joints

    filled in 1:2 bitumen and sand (Rate including for curing). m2

    697.00

    F-012 Floor rendered with 1:3 cement and sand normal cement

    floated surface with expansion joints filled with 1:2 bitumen

    sand.( Rate including for curing)m

    2

    595.00 .

    F-013 Extra over, for coloured cement floor waxed and polishing. m2

    109.00

    F-014 100mm high skirting in cement and sand 1:3 projected or

    flush to walls finished smooth with gray cement floating

    including forming groove. m 337.00

    F-015 Waterproofing in upper floor bathrooms, water tanks etc.

    with cementitious waterproofing agent approved by the

    Engineer, (Barralastic or equivalent) apply two coats after

    well cleared surface. m2

    1,845.00

    F-016 Floor rendered with 1:3 cement and sand approved coloured

    surface with expansion joints filled with 1:2 bitumen and

    sand. (Rate including for curing) m2

    798.00

    F-017 100mm high skirting in cement and sand 1:3 finished

    smooth with coloured cement including forming groove. m 369.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 140

  • 7/22/2019 2014 - Including VAT

    141/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    SECTION VI - MISCELLANEOUS / GENERAL

    G-001 Clearing jungle along the fence. m 36.00

    G-002 Cutting coconut trees removing root balls and stacking logs. nr 3,813.00

    G-003 Cutting coconut trees and removing stumps. nr 2,706.00

    G-004 Cutting trees girth 0.45m to 0.9m, removing root balls and

    stacking logs. nr 6,056.00

    G-005 Cutting trees girth 0.45m to 0.9m and stacking logs. nr 3,832.00

    G-006 Cutting trees girth 0.925m to 1.35m, removing root balls

    and stacking logs.nr 8,776.00

    G-007 Cutting trees girth 0.925m to 1.35m and stacking logs. nr 6,551.00

    G-008 Cutting trees girth 1.375m to 1.8m, removing root balls and

    stacking logs. nr 12,607.00

    G-009 Cutting trees girth 1.375m to 1.8m and stacking logs. nr 10,382.00

    G-010 Cutting trees girth 1.825m to 2.25m, removing root balls

    and stacking logs. nr 17,551.00

    G-011 Cutting trees girth 1.8m to 2.25m and stacking logs. nr 15,326.00

    G-012 Cutting trees girth 2.2m to 2.7m, removing root balls and

    stacking logs. nr 21,383.00

    G-013 Cutting trees girth 2.2m to 2.7m and stacking logs. nr 19,158.00

    G-014 Fence barbed wire 5 strands 14 BWG with 4 points at

    75mm crs and R.C.C posts 1:1 1/2:3 (20mm) concrete

    1.70m high,and section 150mm x 150mm at bottom and

    100mm x 100mm top, at 2.4m c/c , r/f with 4 nos 6mm dia.

    MS rods with 14BWG wire stirrups at 150mm crs. Rate to

    inclusive of excavation,1:3:6(40mm) cement concrete

    foundations to all post and providing straightening bolts

    with washers and nuts. m 1,302.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 141

  • 7/22/2019 2014 - Including VAT

    142/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    G-015 Fence barbed wire 8 strands 14 BWG with 4 points at

    75mm crs and R.C.C posts 1:1 1/2:3 (20mm) concrete

    2.25m high,and section 150mm x 150mm at bottom and

    100mm x 100mm top, at 2.4m c/c, r/f with 4 nos 6mm dia.

    MS rods with 14BWG wire stirrups at 150crs. Rate toinclusive of excavation,1:3:6(40mm) cement concrete

    foundations to all post and providing straightening bolts

    with washers and nuts. m 1,510.00

    G-016 Fence posts intermediate, or struts, in cement concrete 1:1

    1/2:3(20mm) r/f with 4 nos 6mm MS rods and 14BWG wire

    stirrups at 150crs, 1.7m high and section 150mm x 150mm

    at bottom and 100mm x 100mm top, as per detail drawing

    including fixing with 1:3:6 concrete, excavation etc. nr 2,469.00

    G-017 Fence posts intermediate, or struts, in cement concrete 1:11/2:3(20mm) r/f with 4 nos 6mm MS rods and 14BWG wire

    stirrups at 150crs, 2.25m high and section 150mm x 150mm

    at bottom and 100mm x 100mm top, as per detail drawing

    including fixed with 1:3:6 concrete, excavation etc. nr 2,934.00

    G-018 Fence posts RCC, available, refixed. Rate includes for

    concreting 1:3:6(40mm) where necessary. nr 517.00

    G-019 Fence, barbed wire 14 gauge 4 points, available,

    strengthened & fixed on exiting concrete or timber posts. m 18.00

    G-020 Fence barbed wire 14 gauge 4 Points, supplied & fixed onexisting concrete or timber posts. m 33.00

    G-021 Flight of steps in 1:2 1/2 :5(25mm) concrete overall width

    1.5m, waist 100mm on well compacted ground, waist below

    ground level, curb walls 150mm thick overall height 450mm

    in outer surface. Rate includes all formwork and 1:3 cement

    rendering finished smooth to exposed surfaces. size of steps

    150 mm rise and 275mm tread.(Measured sloping length.) m 10,308.00

    G-022 Landing flight of steps 1.5m wide overall base 100mm

    thick, curb walls 150mm thick and 150mm heightexternally, in 1:2 1/2:5(25mm) concrete, and 1:3.cement

    rendering finished smooth. m 8,736.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 142

  • 7/22/2019 2014 - Including VAT

    143/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    G-023 Chain link mesh fence 2.0m high (Gauge 12) with 2" dia.

    medium quality GI pipe at 2.4m c/c up rights and one after

    the other 3/4" dia. medium quality GI pipe up right at 2.4m

    c/c and 1" dia. GI pipe medium quality at top and bottom

    runners, including excavation, foundation concrete work1:2:4(20mm), welding work, painting of two coats of

    anticorrosive and finished coat of enamel etc.(Chain link

    fence open area 2" x 2") m 9,368.00

    G-024 Supplying and laying 1.5m x 1.0m x 1.0m galvanized

    gabion boxes with necessary rubble packing. nr 12,382.00

    G-025 Supplying and laying 2.0m x 1.0m x 1.0m galvanized

    gabion boxes with necessary rubble packing. nr 16,596.00

    G-026 Supplying and laying 1.0m x 1.0m x 1.0m galvanizedgabion boxes with necessary rubble packing. nr 9,052.00

    G-027 Supplying and laying geo textile layer behind gabion

    retaining walls type T.S. 30. m2

    227.00

    G-028 Cutting turf sods, loading to hand carts and transporting up

    to 30 m, laying and watering for 30days. (Royalty for turf

    sods, and transport beyond 30m paid separately) m2

    211.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 143

  • 7/22/2019 2014 - Including VAT

    144/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    SECTION VII - DRAINAGE SYSTEMS

    H-001 Elbow pvc 110mm supplied and fixed. nr 715.00

    H-001A Cleaning eye bend pvc 110mm supplied and fixed. nr 925.00

    H-002 Bend PVC 110 supplied and fixed, drainage. nr 715.00

    H-003 Type 400 pvc 110mm for sewer line supplied and laid in

    medium soil, joints embedded in 1:3:6(40mm) concrete

    including necessary excavation, back filling, and

    compaction, invert depth up to 600mm. m 836.00

    H-004 Type 400 pvc 110mm for sewer line supplied and laid in

    medium soil, joints embedded in 1:3:6 (40mm) concrete

    including necessary excavation, back filling, and

    compaction invert depth to 600mm to 900mm. m 919.00

    H-005 Type 400 pvc 160mm for sewer line supplied and laid in

    medium soil, joints embedded in 1:3:6(40mm) concrete

    including necessary excavation, back filling, and

    compaction invert depth up to 600mm. m 2,745.00

    H-006 Type 400 pvc 160mm for sewer line supplied and laid in

    medium soil, joints embedded in 1:3:6(40mm) concrete

    including necessary excavation, back filling, and

    compaction invert depth to 600mm to 900mm. m 2,828.00

    H-007 Gully PVC 150mm supplied and fixed including concreting

    and supplying necessary grating. nr 597.00

    H-008 Manhole 600mm x 600mm x 600mm internally complete

    with cement concrete 1:2:4(25mm) in 75mm thick

    base,225mm tk.brick walls ,on top of the slab, channelling

    and bending, 1:3 cement and sand rendered in internal

    surfaces, 75mm thick RC. cover slab r/f 10mm tor steel @

    150mm c/c. both ways, complete with lifting handles. nr 12,376.00

    H-009 Manhole 600mm x 600mm internally complete with brick

    walls 1:3 cement and sand rendered in internal surfaces,

    extra over for each additional 0.3m depth. nr 3,191.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 144

  • 7/22/2019 2014 - Including VAT

    145/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    H-010 Manhole 1.05m x 0.675m x 0.60m internally with cement

    concrete 1:2:4(25mm) in 75mm thick base ,channelling,

    walls 255mm brick, 1:3 cement and sand rendered in

    internal surfaces 75mm thick RC. cover slab r/f 10mm tor

    steel @ 150mm c/c. both ways, complete with liftinghandles. nr 19,419.00

    H-011 Manhole 1.05m x 0.675m internally brick walls 225mm ,

    1:3 cement and sand rendered in internal surfaces extra

    over each additional 0.3 m depth. nr 4,251.00

    H-012 Shallow drains in floors 75mm diameter in cement concrete

    1:2:4(25mm), 75mm thick in bottom and sides including

    cement and sand rendering. m 1,249.00

    H-013 Construction of 1.2m diameter internal fully built type

    soakage pit, built up 225mm thick brick work in 1:8 cement,sand mortar invert depth from ground level 3.0m,on

    225mm x 150mm ring beam 1:2:4(20mm) concrete mix,

    including 1:3 cement,sand plaster finished smooth with

    neat gray cement (0.9m invert depth only) & 100mm high

    1:2:4(20mm ) concrete ring pad above ground level,

    complete with 75mm thick RCC cover slab with lifting

    handle.All as per detail drawing.(CP/K/119/91A). nr 80,628.00

    H-014 Construction of 1.2m diameter internal semi built type

    soakage pit, built up 225mm thick brick work in 1:8 cement

    ,sand mortar invert depth from ground level 0.90m,on

    225mm x 150mm ring beam 1:2:4(20mm) concrete mix,including 1:3 cement,sand plaster finished smooth with

    neat gray cement & 100mm high 1:2:4(20mm ) concrete

    ring pad above ground level, complete with 75mm thick

    RCC cover slab with lifting handle.All as per detail

    drawing.(CP/K/119/91A). nr 42,699.00

    H-015 Construction of 1.8m diameter internal fully built type

    soakage pit , built up 225mm thick brick work in 1:8 cement

    ,sand mortar invert depth from ground level 3.0m,on

    225mm x 150mm ring beam 1:2:4(20mm) concrete mix,

    including 1:3 cement,sand plaster finished smooth with

    neat gray cement (0.9m invert depth only) & 100mm high1:2:4(20mm ) concrete ring pad above ground level,

    complete with 75mm thick RCC cover slab with lifting

    handle.All as per detail drawing.(CP/K/253/92A). nr 109,176.00

    H-016 Tee, pvc 110mm supplied and fixed drainage. nr 1,007.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 145

  • 7/22/2019 2014 - Including VAT

    146/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    H-017 Vent pvc 110mm diameter (type 400) fixed on walls with

    timber plugs and pvc brackets. (Specials paid separately) m 882.00

    H-018 Construction of septic tank for 15 persons 2.1m x 0.75m

    internally as per detail drawing No. CP/K/117/91A. nr 90,176.00

    H-019 Construction of septic tank for 25 persons 2.4m x 0.75m

    internally as per detail drawing No. CP/K/117/91A. nr 98,011.00

    H-020 Construction of septic tank for 25 persons as per type plan

    complete, extra over for invert depth exceeding 600mm to

    1800mm, per each additional 0.3 m. nr 8,401.00

    H-021 Construction of septic tank for 50 persons invert depth up to

    0.75m complete as per type plan No: CP/K/121/91A. nr 127,032.00

    H-022 Construction of septic tank for 50 persons as per type plan

    complete, extra over for invert depth exceeding 600mm to

    1800mm, per each additional 0.3 m. nr 9,954.00

    H-023 Construction of septic tank for 100 persons invert depth up

    to 2250mm complete as per type plan No:CP/K/121/91A. nr 182,863.00

    H-024 Construction of septic tank for 100 persons as per type plan

    complete, extra over for invert depth exceeding 600mm to

    1800mm, per each additional 0.3 m. nr 14,108.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 146

  • 7/22/2019 2014 - Including VAT

    147/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    SECTION VIII - ELECTRICAL INSTALLATION

    Note - *

    *

    *

    *

    I-001 Bell point wiring - to be carried out with 2 x 1.0 mm2PVC

    insulated PVC sheathed copper cables wired in concealed

    conduit in wall and above ceiling to be supplied and

    installed in to working order.(Including sunk switch) nr 1,650.00

    I-002 Pendent type lamp point wiring - to be carried out with 2 x

    1.0 mm2PVC insulated PVC sheathed copper cables wired

    in concealed conduit in wall and above ceiling to be

    supplied and installed in to working order.(Including sunk

    switch) nr 1,749.00

    I-003 2 Nos. of Pendent type lamp points to be controlled by one

    switch - point wirings to be carried out with 2 x 1.0 mm2

    PVC insulated PVC sheathed copper cables wired in

    concealed conduit in wall and above ceiling, to be supplied

    and installed in to working order(including sunk switch). nr 2,539.00

    I-004 3 Nos. of Pendent type lamp points to be controlled by one

    switch - point wirings to be carried out with 2 x 1.0 mm2

    PVC insulated PVC sheathed copper cables wired in

    concealed conduit in wall and above ceiling, to be supplied

    and installed in to working order(including sunk switch). nr 3,328.00

    I-005 4 Nos. of Pendent type lamp points to be controlled by one

    switch - point wirings to be carried out with 2 x 1.0 mm2

    PVC insulated PVC sheathed copper cables wired in

    concealed conduit in wall and above ceiling, to be suppliedand installed in to working order(including sunk switch). nr 4,118.00

    I-006 5 Nos. of Pendent type lamp points to be controlled by one

    switch - point wirings to be carried out with 2 x 1.0 mm2

    PVC insulated PVC sheathed copper cables wired in

    concealed conduit in wall and above ceiling, to be supplied

    and installed in to working order(including sunk switch). nr 4,908.00

    Should be followed the IEE wiring regulations for electrical Installations.

    All MCCB, RCD, MCB and Isolators should be Moeller/ Orange Industrial orEquivalent approved quality and should have more than 5 Year warranty period.

    All types of fans should be KDK Or Equivalent approved quality and should have

    minimum one year warranty period.

    The Ceiling fans should have Cut-off Safety Switch and Safety Wire Provided to

    Prevent Detachment of Fan Motor from the Rod.

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 147

  • 7/22/2019 2014 - Including VAT

    148/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    I-007 Recessed type / Surface mounted type / Ceiling mounted

    type lamp point wiring - to be carried out with 2 x 1.0 mm2

    PVC insulated PVC sheathed copper cables wired in

    concealed conduit in wall and above ceiling to be supplied

    and installed in to working order.(Including sunk switch) nr 1,428.00

    I-008 2 Nos of Recessed type / Surface mounted type / Ceiling

    mounted type lamp point to be controlled by one switch and

    wiring to be carried out with 2 x 1.0 mm2PVC insulated

    PVC sheathed copper cables wired in concealed conduit in

    wall and above ceiling to be supplied and installed in to

    working order.(Including sunk switch) nr 1,897.00

    I-009 3 Nos of Recessed type / Surface mounted type / Ceiling

    mounted type lamp point to be controlled by one switch and

    wiring to be carried out with 2 x 1.0 mm2PVC insulatedPVC sheathed copper cables wired in concealed conduit in

    wall and above ceiling to be supplied and installed in to

    working order.(Including sunk switch) nr 2,366.00

    I-010 Bell point wiring - to be carried out with 2 x 1.0 mm2PVC

    insulated PVC sheathed copper cables wired in concealed

    conduit in wall and above ceiling to be supplied and

    installed in to working order.(Including sunk switch) nr 2,835.00

    I-011 5 Nos of Recessed type / Surface mounted type / Ceiling

    mounted type lamp point to be controlled by one switch andwiring to be carried out with 2 x 1.0 mm

    2PVC insulated

    PVC sheathed copper cables wired in concealed conduit in

    wall and above ceiling to be supplied and installed in to

    working order.(Including sunk switch) nr 3,304.00

    I-012 1 Nos. of Watertight lamp points to be controlled by one

    switch - point wirings to be carried out with 2 x 1.0 mm2

    PVC insulated PVC sheathed copper cables wired in

    concealed conduit in wall and above ceiling to be supplied

    and installed in to working order (Including Sunk switch). nr 1,428.00

    I-013 2 Nos. of Watertight lamp points to be controlled by one

    switch - point wirings to be carried out with 2 x 1.0 mm2

    PVC insulated PVC sheathed copper cables wired in

    concealed conduit in wall and above ceiling to be supplied

    and installed in to working order (Including Sunk switch). nr 1,897.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 148

  • 7/22/2019 2014 - Including VAT

    149/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    I-014 3 Nos. of Watertight lamp points to be controlled by one

    switch - point wirings to be carried out with 2 x 1.0 mm2

    PVC insulated PVC sheathed copper cables wired in

    concealed conduit in wall and above ceiling to be supplied

    and installed in to working order (Including Sunk switch). nr 2,366.00

    I-015 4 Nos. of Watertight lamp points to be controlled by one

    switch - point wirings to be carried out with 2 x 1.0 mm2

    PVC insulated PVC sheathed copper cables wired in

    concealed conduit in wall and above ceiling to be supplied

    and installed in to working order (Including Sunk switch). nr 2,835.00

    I-016 5 Nos. of Watertight lamp points to be controlled by one

    switch - point wirings to be carried out with 2 x 1.0 mm2

    PVC insulated PVC sheathed copper cables wired in

    concealed conduit in wall and above ceiling to be suppliedand installed in to working order (Including Sunk switch). nr 3,304.00

    I-017 Indoor bracket lamp point wiring to be carried out with 2 x

    1.0 mm2PVC insulated PVC sheathed copper cables wired

    in concealed conduit in wall and above ceiling to be

    supplied and installed in to working order. ( Including sunk

    switch). nr 1,428.00

    I-018 2 Nos. of Indoor bracket lamp points to be controlled by one

    switch - point wirings to be carried out with 2 x 1.0 mm2

    PVC insulated PVC sheathed copper cables wired inconcealed conduit in wall and above ceiling to be supplied

    and installed in to working order. ( Including sunk switch). nr 1,897.00

    I-019 3 Nos. of Indoor bracket lamp points to be controlled by one

    switch - point wirings to be carried out with 2 x 1.0 mm2

    PVC insulated PVC sheathed copper cables wired in

    concealed conduit in wall and above ceiling to be supplied

    and installed in to working order. ( Including sunk switch). nr 2,366.00

    I-020 Stairway lamp point wiring - to be carried out with 2 x

    1.0mm

    2

    PVC insulated PVC sheathed copper cables wiredin concealed conduit in wall and above ceiling to be

    supplied and installed in to working order (Including one

    gang two way switch). nr 2,694.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 149

  • 7/22/2019 2014 - Including VAT

    150/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    I-021 Ceiling fan point wiring complete with fan hook - to be

    carried out with 2 x 1.0 mm2PVC insulated PVC sheathed

    copper cables and 2.5mm2earth cable wired in concealed

    conduit in wall and above ceiling to be supplied and

    installed in to working order. nr 1,806.00

    I-022 5 A socket outlet - wiring to be carried out with 2 x 1.0mm2

    PVC insulated PVC sheathed copper cables and 2.5mm2

    earth cable wired in concealed conduit in wall and above

    ceiling to be supplied and installed in to working order. nr 1,728.00

    I-023 2 Nos of 5 A socket outlets - wiring to be carried out with 2

    x 2.5mm2PVC insulated PVC sheathed copper cables and

    2.5mm2earth cable wired in concealed conduit in wall and

    above ceiling to be supplied and installed in to workingorder. nr 4,778.00

    I-024 3 Nos of 5 A socket outlets - wiring to be carried out with 2

    x 2.5mm2 PVC insulated PVC sheathed copper cables and

    2.5mm2 earth cable wired in concealed conduit in wall and

    above ceiling to be supplied and installed in to working

    order. nr 6,561.00

    I-025 4 Nos of 5 A socket outlets - wiring to be carried out with 2

    x 2.5mm2PVC insulated PVC sheathed copper cables and

    2.5mm2earth cable wired in concealed conduit in wall and

    above ceiling to be supplied and installed in to working

    order. nr 8,344.00

    I-026 13 A socket outlet / Grouped socket outlets - wiring to be

    carried out with 2 x 2.5mm2PVC insulated PVC sheathed

    copper cables and 2.5mm2earth cable wired in concealed

    conduit in wall and above ceiling to be supplied and

    installed in to working order. For additional circuit length

    over 10m, Item no I-223 should be added per meter. nr 2,965.00

    I-027 15 A socket outlet - wiring to be carried out with 2 x

    2.5mm2PVC insulated PVC sheathed copper cables and

    2.5mm2earth cable wired in concealed conduit in wall and

    above ceiling to be supplied and installed in to working

    order. For additional circuit length over 10m, Item no I-223

    should be added per meter. nr 2,965.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 150

  • 7/22/2019 2014 - Including VAT

    151/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    I-028 Data socket outlet ( RJ 45 ) wiring be carried out with 5U/

    UTP AWG 24 CAT 5E PVC cables wired in concealed

    conduit in wall and above ceiling to be supplied and

    installed in to working order. nr 1,519.00

    I-029 Data socket outlet ( RJ 45 ) wiring be carried out with 6U/

    UTP AWG 24 CAT 6E PVC cables wired in concealed

    conduit in wall and above ceiling to be supplied and

    installed in to working order. nr 1,750.00

    I-030 Telephone socket outlet ( RJ 11 ) wiring be carried out with

    2X 0.5 mm2 Single Pair - BS 3573 cables wired in

    concealed conduit in wall and above ceiling to be supplied

    and installed in to working order. nr 1,237.00

    I-031 Telephone socket outlet ( RJ 11 ) wiring be carried out with

    2X 0.5 mm2Two Pair - BS 3573 cables wired in concealed

    conduit in wall and above ceiling to be supplied and

    installed in to working order. nr 1,489.00

    I-032 Bell point wiring - to be carried out with 2 x 1.0 mm2PVC

    insulated PVC sheathed copper cables wired with PVC

    casing on wall and on soffit of the slabs to be supplied and

    installed in to working order. (Including sunk switch) nr 1,738.00

    I-033 Pendent type lamp point wiring - to be carried out with 2 x

    1.0 mm2PVC insulated PVC sheathed copper cables wired

    with PVC casing on wall and on soffit of the slabs to be

    supplied and installed in to working order (Including sunk

    switch). nr 1,837.00

    I-034 2 Nos. of Pendent type lamp points to be controlled by one

    switch - point wirings to be carried out with 2 x 1.0 mm2

    PVC insulated PVC sheathed copper cables wired with

    PVC casing on wall and on soffit of the slabs to be supplied

    and installed in to working order (Including sunk switch). nr 2,623.00

    I-035 3 Nos. of Pendent type lamp points to be controlled by one

    switch - point wirings to be carried out with 2 x 1.0 mm2

    PVC insulated PVC sheathed copper cables wired with PVC

    casing on wall and on soffit of the slabs to be supplied and

    installed in to working order (Including sunk switch). nr 3,625.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 151

  • 7/22/2019 2014 - Including VAT

    152/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    I-036 4 Nos. of Pendent type lamp points to be controlled by one

    switch - point wirings to be carried out with 2 x 1.0 mm2

    PVC insulated PVC sheathed copper cables wired with PVC

    casing on wall and on soffit of the slabs to be supplied and

    installed in to working order (Including sunk switch). nr 4,195.00

    I-037 5 Nos. of Pendent type lamp points to be controlled by one

    switch - point wirings to be carried out with 2 x 1.0 mm2

    PVC insulated PVC sheathed copper cables wired with PVC

    casing on wall and on soffit of the slabs to be supplied and

    installed in to working order (Including sunk switch). nr 4,981.00

    I-038 Recessed type / Surface mounted type / Ceiling mounted

    type lamp point wiring - to be carried out with 2 x 1.0 mm2

    PVC insulated PVC sheathed copper cables wired with PVC

    casing on wall and on soffit of the slabs to be supplied andinstalled in to working order (Including sunk switch). nr 1,516.00

    I-039 2 Nos of Recessed type / Surface mounted type / Ceiling

    mounted type lamp point wiring - to be carried out with 2 x

    1.0 mm2PVC insulated PVC sheathed copper cables wired

    with PVC casing on wall and on soffit of the slabs to be

    supplied and installed in to working order (Including sunk

    switch). nr 1,981.00

    I-040 3 Nos of Recessed type / Surface mounted type / Ceiling

    mounted type lamp point wiring - to be carried out with 2 x

    1.0 mm2PVC insulated PVC sheathed copper cables wired

    with PVC casing on wall and on soffit of the slabs to be

    supplied and installed in to working order (Including sunk

    switch). nr 2,447.00

    I-041 4 Nos of Recessed type / Surface mounted type / Ceiling

    mounted type lamp point wiring - to be carried out with 2 x

    1.0 mm2PVC insulated PVC sheathed copper cables wired

    with PVC casing on wall and on soffit of the slabs to be

    supplied and installed in to working order (Including sunk

    switch). nr 2,746.00

    I-042 5 Nos of Recessed type / Surface mounted type / Ceiling

    mounted type lamp point wiring - to be carried out with 2 x

    1.0 mm2PVC insulated PVC sheathed copper cables wired

    with PVC casing on wall and on soffit of the slabs to be

    supplied and installed in to working order (Including sunk

    switch). nr 3,377.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 152

  • 7/22/2019 2014 - Including VAT

    153/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    I-043 Watertight lamp point wiring - to be carried out with 2 x 1.0

    mm2PVC insulated PVC sheathed copper cables wired with

    PVC casing on wall and on soffit of the slabs to be supplied

    and installed in to working order (Including sunk switch). nr 1,516.00

    I-044 2 Nos. of Watertight lamp points to be controlled by one

    switch - point wirings to be carried out with 2 x 1.0 mm2

    PVC insulated PVC sheathed copper cables wired with PVC

    casing on wall and on soffit of the slabs to be supplied and

    installed in to working order (Including sunk switch). nr 1,981.00

    I-045 3 Nos. of Watertight lamp points to be controlled by one

    switch - point wirings to be carried out with 2 x 1.0 mm2

    PVC insulated PVC sheathed copper cables wired with PVC

    casing on wall and on soffit of the slabs to be supplied and

    installed in to working order (Including sunk switch). nr 2,447.00

    I-046 4 Nos. of Watertight lamp points to be controlled by one

    switch - point wirings to be carried out with 2 x 1.0 mm2

    PVC insulated PVC sheathed copper cables wired with PVC

    casing on wall and on soffit of the slabs to be supplied and

    installed in to working order (Including sunk switch). nr 2,912.00

    I-047 5 Nos. of Watertight lamp points to be controlled by one

    switch - point wirings to be carried out with 2 x 1.0 mm2

    PVC insulated PVC sheathed copper cables wired with PVC

    casing on wall and on soffit of the slabs to be supplied andinstalled in to working order (Including sunk switch). nr 3,377.00

    I-048 Indoor bracket lamp point wiring - to be carried out with 2

    x 1.0 mm2PVC insulated PVC sheathed copper cables

    wired with PVC casing on wall and on soffit of the slabs to

    be supplied and installed in to working order (Including

    sunk switch). nr 1,516.00

    I-049 2 Nos. of Indoor bracket lamp points to be controlled by one

    switch - point wirings to be carried out with 2 x 1.0 mm2

    PVC insulated PVC sheathed copper cables wired with PVCcasing on wall and on soffit of the slabs to be supplied and

    installed in to working order (Including sunk switch). nr 1,981.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 153

  • 7/22/2019 2014 - Including VAT

    154/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    I-050 3 Nos. of Indoor bracket lamp points to be controlled by one

    switch - point wirings to be carried out with 2 x 1.0 mm2

    PVC insulated PVC sheathed copper cables wired with PVC

    casing on wall and on soffit of the slabs to be supplied and

    installed in to working order (Including sunk switch). nr 2,447.00

    I-051 Stairway lamp point wiring - to be carried out with 2 x

    1.0mm2PVC insulated PVC sheathed copper cables wired

    with PVC casing on wall and on soffit of the slabs to be

    supplied and installed in to working order (Including sunk

    switch). nr 2,826.00

    I-052 Ceiling fan point wiring complete with fan hook - to be

    carried out with 2 x 1.0 mm2PVC insulated PVC sheathed

    copper cables and 2.5mm2 earth cable wired with PVC

    casing on wall and on soffit of the slabs to be supplied andinstalled in to working order (Including sunk switch). nr 1,894.00

    I-053 5 A socket outlet - wiring to be carried out with 2 x 1.0mm2

    PVC insulated PVC sheathed copper cables and 2.5mm2

    earth cable wired with PVC casing on wall and on soffit of

    the slabs to be supplied and installed in to working order. nr 1,816.00

    I-054 2 Nos of 5 A socket outlets - wiring to be carried out with 2

    x 2.5mm2PVC insulated PVC sheathed copper cables and

    2.5mm2earth cable wired with PVC casing on wall and on

    soffit of the slabs to be supplied and installed in to workingorder. nr 4,880.00

    I-055 3 Nos of 5 A socket outlets - wiring to be carried out with 2

    x 2.5mm2PVC insulated PVC sheathed copper cables and

    2.5mm2earth cable wired with PVC casing on wall and on

    soffit of the slabs to be supplied and installed in to working

    order. nr 6,707.00

    I-056 4 Nos of 5 A socket outlets - wiring to be carried out with 2

    x 2.5mm

    2

    PVC insulated PVC sheathed copper cables and2.5mm

    2earth cable wired with PVC casing on wall and on

    soffit of the slabs to be supplied and installed in to working

    order. nr 8,533.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 154

  • 7/22/2019 2014 - Including VAT

    155/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    I-057 13 A socket outlet / Grouped socket outlets -wiring to be

    carried out with 2 x 2.5mm2PVC insulated PVC sheathed

    copper cables and 2.5mm2earth cable wired with PVC

    casing on wall and on soffit of the slabs to be supplied and

    installed in to working order. For additional circuit length

    over 10m, Item no I-224 should be added per meter. nr 3,053.00

    I-058 15 A socket outlet -wiring to be carried out with 2 x 2.5mm2

    PVC insulated PVC sheathed copper cables and 2.5mm2

    earth cable wired with PVC casing on wall and on soffit of

    the slabs to be supplied and installed in to working order.

    For additional circuit length over 10m, Item no I-224 should

    be added per meter. nr 3,053.00

    I-059 Data socket outlet ( RJ 45 ) wiring be carried out with 5U/

    UTP AWG 24 CAT 5E PVC cables wired with PVC

    casing on wall and on soffit of the slabs to be supplied and

    installed in to working order. nr 1,607.00

    I-060 Data socket outlet ( RJ 45 ) wiring be carried out with 6U/

    UTP AWG 24 CAT 6E PVC cables wired with PVC

    conduits wired with PVC casing on wall and on soffit of

    the slabs to be supplied and installed in to working order. nr 1,837.00

    I-061 Telephone socket outlet ( RJ 11 ) wiring be carried out with

    2X 0.5 mm2Single Pair - BS 3573 cables wired with PVC

    casing on wall and on soffit of the slabs to be supplied andinstalled in to working order. nr 1,325.00

    I-062 Telephone socket outlet ( RJ 11 ) wiring be carried out with

    2X 0.5 mm2Two Pair - BS 3573 cables wired with PVC

    casing on wall and on soffit of the slabs to be supplied and

    installed in to working order. nr 1,577.00

    I-063 Supplying and installing of 2 x 1 mm2 Cu/ PVC/ PVC

    cable Concealed in conduits. m 137.00

    I-064 Supplying and installing of 2 x 1.5 mm2 Cu/ PVC/ PVCcable Concealed in conduits. m 197.00

    I-065 Supplying and installing of 2 x 2.5 mm2 Cu/ PVC/ PVC

    cable Concealed in conduits. m 283.00

    I-066 Supplying and installing of 2 x 4 mm2 Cu/ PVC/ PVC cable

    Concealed in conduits. m 403.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 155

  • 7/22/2019 2014 - Including VAT

    156/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    I-067 Supplying and installing of 2 x 6 mm2 Cu/ PVC/ PVC cable

    Concealed in conduits. m 549.00

    I-068 Supplying and installing of 2 x 10 mm2 Cu/ PVC/ PVC

    cable concealed in conduits. m 873.00

    I-069 Supplying and installing of 2 x 16 mm2 Cu/ PVC/ PVC

    cable Concealed in conduits. m 1,276.00

    I-070 Supplying and installing of 2 x 25 mm2 Cu/ PVC/ PVC

    cable Concealed in conduits. m 1,909.00

    I-071 Supplying and installing of 2 x 1 mm2 Cu/ PVC/ PVC + 2.5

    mm2E cable Concealed in conduits. m 217.00

    I-072 Supplying and installing of 2 x 1.5 mm2 Cu/ PVC/ PVC +2.5 mm

    2E cable Concealed in conduits. m 276.00

    I-073 Supplying and installing of 2 x 2.5 mm2 Cu/ PVC/ PVC +

    2.5 mm2E cable Concealed in conduits. m 363.00

    I-074 Supplying and installing of 2 x 4 mm2 Cu/ PVC/ PVC + 2.5

    mm2E cable Concealed in conduits. m 483.00

    I-075 Supplying and installing of 2 x 6 mm2Cu/ PVC/ PVC + 6

    mm2

    E cable Concealed in conduits. m 742.00

    I-076 Supplying and installing of 2 x 10 mm2 Cu/ PVC/ PVC +

    10 mm2 cable concealed in conduits. m 1,192.00

    I-077 Supplying and installing of 2 x 16 mm2 Cu/ PVC/ PVC +

    16mm2E cable Concealed in conduits. m 1,771.00

    I-078 Supplying and installing of 2 x 25 mm2 Cu/ PVC/ PVC +

    16mm2 E cable Concealed in conduits. m 2,748.00

    I-079 Supplying and installing of 4 x 4 mm2Cu/ PVC/ PVC cable

    Concealed in conduits. m 750.00

    I-080 Supplying and installing of 4 x 6 mm2Cu/ PVC/ PVC cable

    Concealed in conduits. m 1,062.00

    I-081 Supplying and installing of 4 x 10 mm2 Cu/ PVC/ PVC

    cable concealed in conduits. m 1,648.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 156

  • 7/22/2019 2014 - Including VAT

    157/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    I-082 Supplying and installing of 4 x 16 mm2 Cu/ PVC/ PVC

    cable Concealed in conduits. m 2,368.00

    I-083 Supplying and installing of 4 x 25 mm2 Cu/ PVC/ PVC

    cable Concealed in conduits. m 4,149.00

    I-084 Supplying and installing of 4 x 35 mm2 PVC/XLPE/CU

    cable Concealed in conduits. m 4,958.00

    I-085 Supplying and installing of 4 x 4 mm2Cu/ PVC/ PVC + 4

    mm2E cable Concealed in conduits. m 883.00

    I-086 Supplying and installing of 4 x 6 mm2Cu/ PVC/ PVC + 6

    mm2E cable Concealed in conduits. m 1,256.00

    I-087 Supplying and installing of 4 x 10 mm2 Cu/ PVC/ PVC +

    10 mm2 E cable concealed in conduits. m 1,967.00

    I-088 Supplying and installing of 4 x 16 mm2 Cu/ PVC/ PVC +

    16mm2E cable Concealed in conduits. m 2,863.00

    I-089 Supplying and installing of 4 x 25 mm2 Cu/ PVC/ PVC +

    16mm2E cable Concealed in conduits. m 4,149.00

    I-090 Supplying and installing of 4 x 35 mm2 PVC/XLPE/CU +

    16 mm2E cable Concealed in conduits. m 5,454.00

    I-091 Supplying and installing of 2.5 mm2earth cable concealed

    in conduit. m 163.00

    I-092 Supplying and installing of 4 mm2earth cable concealed in

    conduit. m 218.00

    I-093 Supplying and installing of 6 mm2earth cable concealed in

    conduit. m 278.00

    I-094 Supplying and installing of 10 mm2 earth cable concealed inconduit. m 403.00

    I-095 Supplying and installing of 16 mm2earth cable concealed in

    conduit. m 589.00

    I-096 Supplying and installing of 25 mm2earth cable concealed in

    conduit. m 933.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 157

  • 7/22/2019 2014 - Including VAT

    158/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    I-097 Supplying and installing of 35 mm2earth cable concealed in

    conduit. m 1,178.00

    I-098 Supplying and installing of 2 x 1 mm2 Cu/ PVC/ PVC cable

    with casin . m 155.00

    I-099 Supplying and installing of 2 x 1.5 mm2 Cu/ PVC/ PVC

    cable with casin . m 214.00

    I-100 Supplying and installing of 2 x 2.5 mm2 Cu/ PVC/ PVC

    cable with casin . m 301.00

    I-101 Supplying and installing of 2 x 4 mm2 Cu/ PVC/ PVC cable

    with casin . m 421.00

    I-102Supplying and installing of 2 x 6 mm

    2

    Cu/ PVC/ PVC cablewith casin . m 574.00

    I-103 Supplying and installing of 2 x 10 mm2 Cu/ PVC/ PVC

    cable with casin . m 850.00

    I-104 Supplying and installing of 2 x 16 mm2 Cu/ PVC/ PVC

    cable with casin . m 1,242.00

    I-105 Supplying and installing of 2 x 25 mm2 Cu/ PVC/ PVC

    cable with casin . m 1,875.00

    I-106 Supplying and installing of 2 x 1 mm2 Cu/ PVC/ PVC + 2.5

    mm2E cable with casing. m 234.00

    I-107 Supplying and installing of 2 x 1.5 mm2 Cu/ PVC/ PVC +

    2.5 mm2E cable with casing. m 294.00

    I-108 Supplying and installing of 2 x 2.5 mm2 Cu/ PVC/ PVC +

    2.5 mm2E cable with casing. m 380.00

    I-109 Supplying and installing of 2 x 4 mm2 Cu/ PVC/ PVC + 2.5

    mm2

    E cable Concealed in casing. m 500.00

    I-110 Supplying and installing of 2 x 6 mm2Cu/ PVC/ PVC + 6

    mm2E cable Concealed in casing. m 768.00

    I-111 Supplying and installing of 2 x 10 mm2 Cu/ PVC/ PVC +

    10 mm2 cable with casing. m 1,169.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 158

  • 7/22/2019 2014 - Including VAT

    159/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    I-112 Supplying and installing of 2 x 16 mm2 Cu/ PVC/ PVC +

    16mm2E cable with casin . m 1,737.00

    I-113 Supplying and installing of 2 x 25 mm2 Cu/ PVC/ PVC +

    16mm2E cable with casing. m 2,714.00

    I-114 Supplying and installing of 4 x 4 mm2Cu/ PVC/ PVC cable

    with casing. m 775.00

    I-115 Supplying and installing of 4 x 6 mm2Cu/ PVC/ PVC cable

    with casing. m 1,039.00

    I-116 Supplying and installing of 4 x 10 mm2 Cu/ PVC/ PVC

    cable with casing. m 1,608.00

    I-117 Supplying and installing of 4 x 16 mm2 Cu/ PVC/ PVC

    cable with casing. m 2,328.00

    I-118 Supplying and installing of 4 x 25 mm2 Cu/ PVC/ PVC

    cable with casing. m 3,612.00

    I-119 Supplying and installing of 4 x 4 mm2Cu/ PVC/ PVC + 4

    mm2E cable with casing. m 4,917.00

    I-120 Supplying and installing of 4 x 4 mm2Cu/ PVC/ PVC + 4

    mm2

    E cable with casing. m 909.00

    I-121 Supplying and installing of 4 x 6 mm2Cu/ PVC/ PVC + 6

    mm2E cable with casing. m 1,232.00

    I-122 Supplying and installing of 4 x 10 mm2 Cu/ PVC/ PVC +

    10 mm2 cable with casing. m 1,927.00

    I-123 Supplying and installing of 4 x 16 mm2 Cu/ PVC/ PVC +

    16mm2 E cable with casin . m 2,823.00

    I-124 Supplying and installing of 4 x 25 mm2 Cu/ PVC/ PVC +

    16mm2E cable with casing. m 4,108.00

    I-125 Supplying and installing of 4 x 35 mm2

    PVC/XLPE/CU +

    16 mm2E cable with Casing. m 5,413.00

    I-126 Supplying and installing of 2.5 mm2earth cable with casing. m 181.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 159

  • 7/22/2019 2014 - Including VAT

    160/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    I-127 Supplying and installing of 4 mm2earth cable with casing. m 235.00

    I-128 Supplying and installing of 6 mm2earth cable with casing. m 295.00

    I-129 Supplying and installing of 10 mm2earth cable with casing. m 421.00

    I-130 Supplying and installing of 16 mm2earth cable with casing. m 614.00

    I-131 Supplying and installing of 25 mm2earth cable with casing. m 958.00

    I-132 Supplying and installing of 35 mm2earth cable with casing. m 1,204.00

    I-133 Supplying and installing of 4X35mm2CU/XLPE/SWA/PVC

    - Armourd cable (Excluding Floor excavation, Civil works

    or Cable ladder installation) m 5,556.00

    I-134 Supplying and installing of 4X25mm2CU/XLPE/SWA/PVC

    - Armourd cable (Excluding Floor excavation, Civil works

    or Cable ladder installation) m 4,596.00

    I-135 Supplying and installing of 2X25mm2CU/XLPE/SWA/PVC

    - Armoured cable (Excluding Floor excavation, Civil works

    or Cable ladder installation) m 3,336.00

    I-136 Supplying and installing of 2X35mm2CU/XLPE/SWA/PVC

    - Armourd cable (Excluding Floor excavation, Civil worksor Cable ladder installation) m 4,416.00

    I-137 Supplying and installing of 2X4 mm2CU/PVC/SWA/PVC -

    Armourd cable (Excluding Floor excavation, Civil works or

    Cable ladder installation) m 1,176.00

    I-138 Supplying and installing of 2X6 mm2CU/PVC/SWA/PVC -

    Armourd cable (Excluding Floor excavation, Civil works or

    Cable ladder installation) m 1,416.00

    I-139 Supplying and installing of 2X10 mm2

    CU/PVC/SWA/PVC -Armourd cable (Excluding Floor excavation, Civil works or

    Cable ladder installation) m 1,776.00

    I-140 Supplying and installing of 2X16 mm2CU/PVC/SWA/PVC

    cable (Excluding Floor excavation, Civil works or Cable

    ladder installation) m 2,496.00

    Q.S.BRANCH, DEPARTMENT OF ENGINEERING SERVICES, KANDY. 2014 INCLUDING VAT 160

  • 7/22/2019 2014 - Including VAT

    161/252

    ITEM NO DESCRIPTION UNIT

    RATES

    INCLUDING

    VAT

    I-141 Supplying and installing of 4X2.5 mm2CU/PVC/SWA/PVC

    - Armourd cable (Excluding Floor excavation, Civil works

    or Cable ladder installation) m 876.00

    I-142 Supplying and installing of 4X4 mm2CU/PVC/SWA/PVC -

    Armourd cable (Excluding Floor excavation, Civil works or

    Cable ladder installation) m 1,296.00

    I-143 Supplying and installing of 4X6 mm2CU/PVC/SWA/PVC -

    Armourd cable (Excluding Floor excavation, Civil works or

    Cable ladder installation) m 1,716.00

    I-144 Supplying and installing of 4X10 mm2CU/PVC/SWA/PVC -

    Armourd cable (Excluding Floor excavation, Civil works or

    Cable ladder installation) m 2,676.00

    I-145 Supplying and installing o