On Broadway Retail & Theatre Complex

Redwood City, CA

Field Paoli Architects

PROJECT DATASize: 198,000 SFCost: $40 MCompletion: 7/2006

• Project Architect• DD through CA phases• Multiple consultant teams• Complex coordination with

a 2 story underground garage, 16 retail tenants, a 20 screen theatre, and new streetscape

• Type 1 construction• Full city block of downtown

revitalization effort

The On Broadway Retail and Theatre Complex anchors a major revitalization effort in downtown Redwood City. Facades are designed to compliment the scale of adjacent Art Deco buildings. Theatre Way Streetscape allows outdoor dining and public street fairs.

PROJECT DATA Size: 21,000 S.F.Cost: $13.8 mCompletion: 1/2009LEED Certified

Mayfair Community Center San Jose, CA

Field Paoli Architects

The Mayfair Community Center includes a large banquet room, classroom and meeting spaces, child care area, as well as fitness rooms. Site improvements include a new recreational pool, picnic area, spray-ground, tot lot and skate park. LEED certified with a host of sustainable design features including shaded exterior circulation, abundant day lighting, natural ventilation, and a highly efficient mechanical system.

• Senior Project Detailer• Developed building and wall sections• Developed wall, window, and roofing details• DD through CD phases • Type V-1 Hr construction, mixed use

Burgess Park Gymnasium/Gymnastics CenterFacilities Assessment and Conceptual DesignMenlo Park, CA

Field Paoli Architects

• Prepared Existing Facilities Assessment• Led Public Participation process• Conducted meetings for Public Works,

Parks & Rec, and Steering Committee• Conceptual Design Planning for 5 schemes• 40,000 SF facility at Civic Center site• Conceptual Cost Estimate, Specifications

and Budget

Presidio Branch LibrarySan Francisco, CA

Field Paoli Architects

PROJECT DATASize: Presidio 10,000 SFCost: Presidio $2.3 MCompletion: 8/2010Application for LEED Gold CI

• Project Architect for Schematic thru Construction Document phases

• Interior remodel with ADA upgrades• Presentation meetings for public input• Led team meetings with SFPL, Friends of

the Library and consultants• Coordinated historic restoration team• Projected LEED Commercial Interior Gold

Park Branch LibrarySan Francisco, CA

Field Paoli Architects

PROJECT DATASize: 8,500 SFCost: Park $1.1 MCompletion: 8/2010Application for LEED Gold CI

• Project Architect for Schematic thru CD phases

• Interior remodel with ADA upgrades

• Presentation meetings for public input

• Led team meetings with SFPL, Friends of the Library and consultants

• Projected LEED CI Gold

Pleasanton Public LibraryFacilities Assessment and Conceptual DesignPleasanton, CA

Field Paoli Architects

• Prepared Existing Facilities Assessment• Conducted meetings with the Library

Commission and City Staff• Conceptual Design Planning for 3

building and 6 parking schemes• 72,000 SF facility at Civic Center site• Conceptual Cost Estimate,

Specifications and Budget

• Project Architect• Planning through

Construction Phases• Renovation and seismic

upgrade for an existing 300,000 SF building and parking structure

• Type 1 construction

Potrero CenterSan Francisco, CA