On Broadway Retail & Theatre Complex
Redwood City, CA
Field Paoli Architects
PROJECT DATASize: 198,000 SFCost: $40 MCompletion: 7/2006
![Page 2: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/2.jpg)
• Project Architect• DD through CA phases• Multiple consultant teams• Complex coordination with
a 2 story underground garage, 16 retail tenants, a 20 screen theatre, and new streetscape
• Type 1 construction• Full city block of downtown
revitalization effort
![Page 3: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/3.jpg)
The On Broadway Retail and Theatre Complex anchors a major revitalization effort in downtown Redwood City. Facades are designed to compliment the scale of adjacent Art Deco buildings. Theatre Way Streetscape allows outdoor dining and public street fairs.
![Page 4: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/4.jpg)
![Page 5: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/5.jpg)
![Page 6: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/6.jpg)
![Page 7: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/7.jpg)
![Page 8: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/8.jpg)
![Page 9: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/9.jpg)
![Page 10: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/10.jpg)
![Page 11: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/11.jpg)
PROJECT DATA Size: 21,000 S.F.Cost: $13.8 mCompletion: 1/2009LEED Certified
Mayfair Community Center San Jose, CA
Field Paoli Architects
![Page 12: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/12.jpg)
The Mayfair Community Center includes a large banquet room, classroom and meeting spaces, child care area, as well as fitness rooms. Site improvements include a new recreational pool, picnic area, spray-ground, tot lot and skate park. LEED certified with a host of sustainable design features including shaded exterior circulation, abundant day lighting, natural ventilation, and a highly efficient mechanical system.
![Page 13: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/13.jpg)
• Senior Project Detailer• Developed building and wall sections• Developed wall, window, and roofing details• DD through CD phases • Type V-1 Hr construction, mixed use
![Page 14: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/14.jpg)
![Page 15: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/15.jpg)
![Page 16: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/16.jpg)
![Page 17: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/17.jpg)
Burgess Park Gymnasium/Gymnastics CenterFacilities Assessment and Conceptual DesignMenlo Park, CA
Field Paoli Architects
• Prepared Existing Facilities Assessment• Led Public Participation process• Conducted meetings for Public Works,
Parks & Rec, and Steering Committee• Conceptual Design Planning for 5 schemes• 40,000 SF facility at Civic Center site• Conceptual Cost Estimate, Specifications
and Budget
![Page 18: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/18.jpg)
![Page 19: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/19.jpg)
![Page 20: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/20.jpg)
Presidio Branch LibrarySan Francisco, CA
Field Paoli Architects
PROJECT DATASize: Presidio 10,000 SFCost: Presidio $2.3 MCompletion: 8/2010Application for LEED Gold CI
![Page 21: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/21.jpg)
• Project Architect for Schematic thru Construction Document phases
• Interior remodel with ADA upgrades• Presentation meetings for public input• Led team meetings with SFPL, Friends of
the Library and consultants• Coordinated historic restoration team• Projected LEED Commercial Interior Gold
![Page 22: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/22.jpg)
Park Branch LibrarySan Francisco, CA
Field Paoli Architects
PROJECT DATASize: 8,500 SFCost: Park $1.1 MCompletion: 8/2010Application for LEED Gold CI
![Page 23: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/23.jpg)
• Project Architect for Schematic thru CD phases
• Interior remodel with ADA upgrades
• Presentation meetings for public input
• Led team meetings with SFPL, Friends of the Library and consultants
• Projected LEED CI Gold
![Page 24: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/24.jpg)
Pleasanton Public LibraryFacilities Assessment and Conceptual DesignPleasanton, CA
Field Paoli Architects
![Page 25: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/25.jpg)
• Prepared Existing Facilities Assessment• Conducted meetings with the Library
Commission and City Staff• Conceptual Design Planning for 3
building and 6 parking schemes• 72,000 SF facility at Civic Center site• Conceptual Cost Estimate,
Specifications and Budget
![Page 26: 2010 Li Portfolio](https://reader033.fdocuments.us/reader033/viewer/2022061210/548e6cd2b479592c3b8b4985/html5/thumbnails/26.jpg)
• Project Architect• Planning through
Construction Phases• Renovation and seismic
upgrade for an existing 300,000 SF building and parking structure
• Type 1 construction
Potrero CenterSan Francisco, CA
SGPA Architecture & Planning