1. Application of rendering coat>>>
The mortar is forcibly applied with mason’s trowel and pressed well into joints and over the surface.
The thickness of the coat is about 12 mm.
This is allowed to slightly harden.
The surface is left to set at least for 7 days.
Page 17
2. Application of floating coat>>>>>>>>
The rendering coat is cleaned off all dust.
It is lightly wetted.
The mortar is the spread and rubbed to the required plain surface.
After the floating coat is applied, it is then allowed to set for at least 10 days.
The thickness of the coat varies from 6 mm to 9mm