What is Plaster?

Plaster is a building material used for coating walls and ceilings. Sand-cement plaster is used extensively in building work as a decorative or protective coating for concrete and masonry walls .

Plaster is one of the oldest building materials, the most primitive form was mud plaster, used to hold together structures made of branches or wood for example. Today internal plastering is used more as a way of smoothing out surfaces and preparing them for decoration, it also adds strength to the wall or ceiling and helps seal together building materials.

Page 3: Manual plastering

04/10/2023

Materials Required

Cement Sand Water Masonry Trowel Smoothening Trowel Metal Float Measuring Tape Plumb Bob Mud Pan Chicken Mesh Hairs Recron Fibre

Page 4: Manual plastering

04/10/2023

Know your Materials!

Cement Sand Recron Fibre

Final Mortar mix (made from mixing Cement,sand,water and recron fibre) present in a Mudpan

Page 5: Manual plastering

04/10/2023

Procedure

1. After the masonry wall made of bricks or aerated blocks is ready, it is first cleaned properly before starting the plastering wall using brushes and trowels.

Brick wall Aerated Block wall

Page 6: Manual plastering

04/10/2023

2. The scaffold is prepared for provide the labour a platform to stand and materials required for plastering are transported at the site of plastering.

3. Cement Mortar is prepared by mixing cement and sand in ratio specified. For ex-In our case the ratio specified is 1:4.So we use

1 unit volume of cement for 4 unit volume of sand. The normal cement bag is 50 kg in mass 0.035 m3. So we prepare a container of volume 0.035 m3 and pour 4 containers of cement.

Scaffolding

Container for

measuring sand

Page 7: Manual plastering

04/10/2023

4. Recron fibre is added to it as it helps in avoiding cracks in plaster. We use 125 gm fibre for 1 bag of cement.

5. Water is added .As per as IS standards 0.025 m3 of water is added to 1 bag of cement, but at site it is subjected to the workability requirements.

Note: The mortar mix should be used within it’s initial setting time = 45 min6. Chicken mesh is used at the joint of Lintel and masonry wall to avoid cracks at

the joint in future.

Chicken Mesh Labour putting Chicken Mesh

Page 8: Manual plastering

04/10/2023

7. Making of Level Pads : Level pads are used for maintaining the thickness of plaster coat required.They act as a reference for checking thickness of plaster.

- First we lay a reference line using rope and nails - We check the distance of wall from this reference line and note it(say D1) - Now we put the mortar of wall and smoothen it. We now calculate the distance between the reference line and level

pad’s surface(say D2) D1-D2= Thickness of coat required - If the thickness doesn’t matches then adjust the thickness of level pad

- Now make one level pad above the first level pad and check if it’s in line with the help of plumb bob.It might happen the wall is not exactly vertical either inwards or outwards which can be checked with help of plumb bob hence thickness of level pad can be adjusted accordingly.

Page 9: Manual plastering

04/10/2023

Labourers checking the distance of wall from reference line

Making of level pad

Page 10: Manual plastering

04/10/2023Level Pad

Labourers checking distance of level pad from reference line

Page 11: Manual plastering

04/10/2023

Plumb Bob

No gap between wall and plumb bob, signifying that wall is straight

Gap between wall and plumb bob indicating that wall is

“Inwards”

Page 12: Manual plastering

04/10/2023

- After checking for vertical alignment of level pads, check for horizontal alignment with the help of a rope( pin a rope parallel to the first level pad also vertical with adjacent wall).Adjust the level pads in thickness if the wall is tilted sideways.

Checking for vertical alignment of pads

Horizontally laid level pads

Page 13: Manual plastering

04/10/2023

8. After making the level pads, wet the wall with help of diluted cement water slurry to provide better adhesion with mortar.

9. The mason then applies the mortar on the walls with the help of trowel.

Masonry Trowel

Page 14: Manual plastering

04/10/2023

10. With the help of metal float the mason creates a smooth reference plain of required thickness by pressing the float against two vertical level pads.The additional mortar is scrapped of with the help of float.

Metal Float

Reference Plain

Page 15: Manual plastering

04/10/2023

11. The finishing of the plaster is done with the help of finishing trowel.

Removing excess material with float

Finishing Trowel

Page 16: Manual plastering

04/10/2023

12. After smoothening, the plaster is roughened up for providing better adhesion in case of a second coat. A hair is used for it or sometimes labour also uses chicken mesh only.

Hair used for roughening surface

Rough Plaster coat

Page 17: Manual plastering

04/10/2023

Challenges in Manual Plastering

1. A proper hierarchical system is not present on site. Ideally the engineer should teach the supervisor as in what he requires and the supervisor should convey it to the labour.But due to lack of number and agility of supervisors the engineer has to do that part.

2. Due to above point, the engineer is not able to perform his main task efficiently which is Quality Checks .Two examples in this regard are:-

(a) Amount of water is not as per as standards and the labour puts water according to his will. This in turn degrades the quality of the mix. (b) Checking of the thickness and alignment of level pads is not proper which leads to lack of uniformity of plaster. Plumb checking is not also proper.3. The mortar is not used within it’s initial setting time of 45 Minutes and sometimes

used beyond 4 hours. This again degrades the quality.4. The floor is not cleaned properly before starting plaster and sacks are not always

laid down to collect the fallen mortar. So the mortar gets mixed with the mud and is then used again which has serious implications on the quality.

Page 18: Manual plastering

04/10/2023

5. Due to lack of supervision the labour is idle for a lot of time.Also due to the fear of loosing labour the supervisor also doesn’t say much to them as his performance is judged by the way he handles the labourers.This leads to slow pace of work.

Fallen Mortar getting mixed with mud