1. Arumeru District Council
P.1.1 : RR_SI and RR_PM Gombe Estate Mmbogo and Mlalua‐Nduruma‐Bwawani
P 1.1 : RR_SI and RR_PM Gombe Estate‐Mmbogo and Mlalua‐Nduruma‐Bwawani
P 1.2 : Construction of Materninty Ward at Oltrumet Health Centre
P 1. 3 : Construction of Materninty Ward at Oltrumet Health Centre
P 1.5 : Construction of Materninty Ward at Oltrumet Health Centre
P 1. 4 : Construction of Sekei Bridge
P.1. 5 : Construction of Sekei Bridge
P 1. 6 : Construction of Boundary Fence around ADC
2. BAHI DISTRICT COUNCIL
P 2.1: Aditors at contractor's site office reviewing drawings
P2.2: Uncompacted fill and poor concrete workmanship on Kongogo Dam
P 2.3: Un‐cemented Riprap at Kongogo Dam P 2.4: Poorly trimmed borrow pit at Kongogo
P 2.5: Auditors checking dimensions compliance at Bahi DC Servant Quarters P 2.6: Completed Kigwe Mnadani Drift
P 2.7: Auditors confirming a borehole at Mchito Borehole P 2.8: Auditors discussing with village leader at
Mundemu on the way forward - dry borehole
3. Bukoba District Council
P. 3.1: Cracks can be seen on the floor and walls of a newly constructed Agricultural Centre at Kikomelo
P. 3.2: A newly constructed small bridge P 3.3: Oversize, dirty, sand stone coarse aggregates used for bridges/box culverts along Kalebe-Nyakibimbili road
P 3.4: A bridge whose width was increased a day after casting without engineer’s approval along Kalebe-Nyakibimbili road
4. Geita District Council
P 4.1: Poorly constructed pavement at the New Geita Bus Stand
P 4.2: An auditor and PE Technician carrying out measurements at the New Geita Bus Stand
P 4.3: Well constructed headwalls and wingwalls and poorly compacted approaches along Geita Town – Katoma Area Roads
P 4.4 Poor workmanship on constructed headwall and wing walls along Sungusira – Nyakaduha Road
P 4.5 One of the existing “Bridges” along Sungusira Road
5. Igunga District Council P 5.1 ‐ Igunga Town ‐ Pipe culvert length
measurement
P 5.2 ‐ Igunga Town ‐ Compaction checking, gravel wearing course
P 5.3 ‐ Igunga Town ‐ Pav. thickness measurement
P 5.4 ‐ Igunga Town ‐ Poor concrete for wingwall
P 5.5 ‐ Borehole at Bulangamilwa Village ‐ 150m drilled/dry
P 5.6 ‐ Borehole at Matinje Village ‐ 200m drilled/successful
P 5.7:‐ Washed out bridge to Mwanzugi village
P 5.8:‐Washed out bridge to Mbutu village
6. Ilala Municipal Council
P 6.1: Rusted Handrails at Ulongoni Culvert P 6.2: Rusted Gabions at Ulongoni Box Culvert
P 6.3: CIUP Project Signboard P 6.4: Obstructions within construction area - CIUP
P 6.5: Effects of Leaking Roof on Ceiling board P 6.6: Cracks on walls and rusting wire mesh atat Msongola Secondary School Buyuni Secomndary School
7. Kinondoni Municipal Council
P. 7.1: Failed pavement on Kagera - 1st Inn Road P. 7.2: Siltation on Open Drain at India Embassy
P. 7.3: Cracks below the foundation on classroom at Mbeniteta Secondary
P. 7.4: Water Tank Riser and SIMTANK for X-Ray Room at Magomeni Health Centre
P. 7.5: Water Tank Riser at Makuburi P. 7.6: Disputed location of Water Tank Riser at Mburahati
8. Local Authorities Pension Fund
P. 8.1: Block work as per specification
P. 8.2: Column 1000mm wide as per drawings
P. 8.3: Sub Contractors offices
P. 8.4: Ongoing plastering works
9. Magu District Council
Badugu – Nyangiri Road
P. 9.1: A borrow pit adjacent to the road P. 9.2: Verifications of dimensions on site
P. 9.3: A newly constructed road stretch without proper compaction
P. 9.4: Poor workmanship on constructed culvert
P. 9.5: Massive erosion on raised embankment P. 9.6: Concrete deck is nowhere to be found
P. 9.7: Box culvert under construction P. 9.8: Exit Meeting
10. Masasi District Council
P. 10.1 - Masasi Town - Conference hall concreting work
P. 10.2 - Masasi Town - Conference hall sand and aggregate stoke pile
P. 10.3 - Nagaga to Ng'uni Rd - Compaction checking, gravel wearing course
P. 10.4 - Lulindi to Mkundi Rd - Pav. thickness measurement
P. 10.4 - Masasi Town - Pipe culvert length inspection
P. 10.6 - Exit meeting - Findings Explanation
11. Morogoro Urban Water Supply and Sewerage Authority (MORUWASA) in Turiani Township
Annex 6: Photographic Documentation
P. 11.1: Supplied UvP Pipes
P. 11.2: Discussions on excvated trench ready for pipe laying
P. 11.3: Poor Concrete on Guard House Column P. 11.4: Project Signboard
12. Mtwara Mikindani Municipal Council
P 12.1 - PM works, Width measurement - Singino road
P 12.2 - Completed pipe culvert - Cast insitu
P 12.3 - Fish Market:-roofing and beams inspection
P 12.4 - Fish Market:-Front view after roofing completed
P 12.5 - Completed gravel wearing course - Tanu to Tandika Road 1.2km
P 12.6 - Exit Meeting - Finding and recommendation discussion
13. Mtwara Urban Water Supply and Sewarage Authority (Mtuwasa)
P 13.1 - entry meeting - objective and methodology explanation
P 13.2 - water conduit pipes stockpiles
P 13.3 - aggregate stockpile for concrete P 13.4 - test pit for geotechnical investigation
P 13.5 - resident site office under construction P 13.6 - exit meeting - finding and recommendation discussion
14. Muleba District Council Secondary School Construction in Bumbire Island
P 14.1: Boarding the Boat to the island P 14.2: The 90 Minutes journey is ready to begin
P 14.3: Some of the newly constructed buildings of Bumbire Secondary School
P 14.4: Are they really happy or simply fighting with fear and worries from the unknown?
BUHANGAZA IRRIGATION SCHEME PROJECT
P 14.5: Auditors listening to the contractor’s site supervisor while seated in site “office”
P 14.6: The construction is ongoing but far from completion
PERIODIC MAINTENANCE OF NSHAMBA
P 14.7: Verification of Road width P 14.8: Hips of gravel ready to be spread on the Road
15. Mvomero District Council
P 15.1 : Inadequate Septic Tank and poor workmanship P 15.2: Inadequate Soak Pit for Livestock Training
P 15.3: Inadequate Septic Tank
P 15.6: Over flooded Mjonga Drift
P 15.5: Auditors taking measurements
P 15.8: taking measurements at Mjonga Drift
P 15.7: Roofed Livestock Training Building
P 15.4: Well constructed Mvomero Town Road
16. National Health Insurance Fund
(a) The pictures below shows Medical Centre of Excellence in Dodoma
P 16.1(a): Entrance of the building
P 16.2(a): Steel truss for Roofing
P 16.3(a): Plumbing works
P 16.4(a): Reinforcement are not stored properly and a completed water storage tank
P 16.5(a): Aluminium Windows Installed at Site
(b) The pictures below shows Medicare Centre at Dodoma University
P 16.1(b): Entrance of the building
P 16.2(b): Building Columns
P 16.3(b): Reinforcement covered as per requirement
4.17 Public Service Pension Fund (PSPF)
18. Same District Council
P. 18. 1: Placing of gravel on poorly compacted heavy black‐cotton on Kwasakwaa Roads
P. 18. 2 :Cracked culvert/chipped before placement on Msikitini road drain works
P. 18. 3 : Ongoing Relini drift construction P. 18. 4 : Narrow formation on Same‐Ruvu‐Mferejini
P. 18. 5 : Thickness measurement on Makanya‐Mvungwe
P. 18. 6 : Inspection of drainage structures on Majevu‐Dido‐Njoro
P. 18. 7 : Inspection of drainage structures on Minyal‐Mbono‐Mgagao
P. 18. 8 : Exit meeting with SDC DED and head of sections P. 18. 9: Entry meeting with SDC DED and head of sections
19. Sengerema District Council
P. 19. 1: Kick Off Meeting
P. 19. 2: Nyakasunga Water Supply Scheme
P. 19. 3: Gravel on approach road was quoted for and paid but not expedited
P. 19. 4: This is a severe crack on the deck of a newly constructed drift
20. Singida Municipal Council
P. 20.1: ‐ PM works, Project Signboard ‐ Mwenge street road
P. 20.2 ‐ Completed CRR base course layer ‐ Msikitini road
P. 20.3‐ PM:‐Width measurement, Msikitini road
P. 20.4‐ Spot improvement work:‐Heavy grading checking , Mandewa road
P. 20.5 ‐ Width measurement ‐ Majengo ward road
P. 20.6 ‐ Spot improvement work:‐Heavy grading checking , Mughanga road
21. TANROADS – Arusha
P.21.1 : PM on TCA Jct‐Minjingu road, overaly and shoulder graveling near Mondolu Jct
P.21.2 : PM on Tengeru ‐ Mererani
P.21.3 : Bridge Major Repair on KIA‐TCA Jct ‐ Kikatiti CBC
P.21.4 : Bridge Major Repair on KIA‐TCA Jct ‐ Kikatiti CBC
P.21.5: Site for new CBC on USA River‐Oldonyo Sambu road
P.21.6 : Field Density measurement on Oldonyo Sambu road
P.21.7 : Entry meeting with TRD‐Kilimnjaro Heads of Departments and RM
P.21.7 : Exit meeting with TANROADS ‐Manager Arusha and Heads of Departments
22. TANROADS – Kilimanjaro
P.22.1: Overlay of Himo‐KIA Jct Maili Sita Area
P.22.2 : Headwall to be with the new Contractor after M/s Absolute wa terminated on Kasadala‐Lemira
P.22.3 : Grouted stone pitching works to be finished by the new Contractor after M/s Absolute wa terminated on Kasadala‐Lemira
P.22.4 : Same‐Kisiwa‐Mkomazi East
P.22.5 : Drainage and protection works on Mwembe‐Ndungu
P.22.6 : Entry meeting with TRD‐Kilimnjaro Heads of Departments
P.22.7 : Exit meeting with TRD‐Kilimnjaro Heads of Departments and RM
23. TANROADS ‐ Dodoma
P.23.5: Erosion caused by undirected water into culvert inlet
P.23.1: Auditors taking measurements on Nzali – Dabalo
P.23.2: Side view of a well done Msagali Vented Drift
P.23.3: Flood on Nzali River P.23.4: A well constructed Msagali Vented Drift
P.23.6: Erosion and ponding caused by not directing water into culvert inlet
24. TANROADS ‐ Morogoro
P.24.1: Measuring road width Mikumi ‐ Kidatu Section
P.24.2: Pot hole at Km 3.5 on Mikumi ‐ Kidatu Section
P.24.3: A well done Single surface dressing at Mikumi ‐Kidatu Section
P.24.4: Lined Drain in progress at Mlimba wa Simba
P.24.5: Poorly trimmed borrow pit at Km 33.8 on Miyombo ‐ Lumuma Road
P.24.6: Well completed Box culverts on both sides of Makutano Bridge
P.24.7: Seriously eroded culvert at Km 41.6 on Lumuma P.24.8: Unprotected reinforcement steel at Makutano Bridge
25. TANROADS – Singida P.25.2 ‐ Completed DBST:‐ Misigiri – Kiomboi P.25.2 ‐ Rehab work:‐Compaction checking Ulemo ‐
Gumanga ‐ Sibiti
P.25.3 ‐ Rehab work:‐Width measurement Ulemo ‐ Gumanga ‐ Sibiti
P.25.4 ‐ Rehab work:‐Pav. thickness measurement Ulemo ‐ Gumanga ‐ Sibiti
P.25. 5 ‐ Periodic Maintenance work:‐Width measurement Rungwa‐Itigi Mkiwa
P.25.6 ‐ Spot improvement:‐Pav. thickness measurement Rungwa‐Itigi Mkiwa
P.25.7 :‐Entry Meeting in RM office
27
26 TANROADS – Tabora P.26.1 ‐ PM Works ‐ Width Measurement Rungwa ‐
Ipole P.26.2 ‐ PM works ‐ Compaction checking Rungwa ‐
Ipole
P.26.3 ‐ PM works ‐ Pav. thickness measurement ‐Rungwa ‐ Ipole
P.26.4 ‐ PM Works ‐ Width Measurement Kahama boarder ‐ Nzega
P.26.5 ‐ PM Works ‐ Compaction checking Kahama boarder ‐ Nzega
P.26.6‐ PM Works ‐ Pav. thickness measurement Kahama boarder ‐ Nzega
P.26.7 ‐ Rehab works ‐ Silted pipe culvert Puge ‐ Ziba
P.26.8 ‐ Rehab works ‐ pipe culvert length measurement ‐ Puge ‐ Ziba
28
27. TANROADS – Mtwara P.27.1 - Entry Meeting in RM office P.27.2 - PM work:-Cut section, Mpapura-Mikao-
Kinolombedo
P.27.3 - PM work:-Width measurement Mpapura-Mikao- Kinolombedo
P.27.4 - Routine work:-grass cutting Mtwara - Mtegu
P.27.5 - Routine work:-bridge preventive Mtwara - Mtegu
P.27.6 - Major repair of Magomeni I bridge:-completed box 2x2.0x1.5m
P.27.7 - Rehab work:- Compaction checking Mnongodi - Kilimahewa
P.27.8 - Rehab work:-Pav. thickness measurement Mnongodi - Kilimahewa
P.27.9:-Exit Meeting in RM office
29
28. Tanzania Eclectic Supply Co. Limited (TANESCO)
P.28.1: Electric Pole in someone’s plot P.28.2: A new Madale Substation
P.28.3: Askari House at Temeke Office P.28.4: Debris at culvert at outlet – Access from Kilwa Road
P.28.5: Main Entrance Gate to Temeke Office
P.28.6: Painted wall to the house at Ursino Estate
P.28.8: Renovated Kitchen Wardrobe P.28.7: Renovated house at Ursino
30
29. Temeke Municipal Council
P.29.1: Completed Malawi Box Culvert P.29.2: Audit team verifying road width at Km 0+400 on Kurasini Road
P.29.3: Lined side ditch at Km 0+450 RHS on Kurasini Road P.29.4: Road sign on Kurasini Road
P.29.5: Rusted wire mesh at Keko Secondary School
P.29.6: Cracks on constructed classroom at Pendamoyo Sec. School
31
30. Tunduru District Council P.30.1‐ Tunduru Urban ‐ carriageway width measurement
P.30.2 ‐ Tunduru Urban ‐ False information signboard
P.30.3 ‐ Tunduru Urban ‐ Compaction checking, gravel wearing course
P.30.4 ‐ Tunduru Urban ‐ Pav. thickness measurement
P.30.5 ‐ Masonya Bridge ‐ Top slab Rebars inspection
P.30.6 ‐ Dormitory Block at Masonya Sec School ‐ Painting and roofing works
P.30.7:‐ SI works along Tunduru‐Namasaka Rd
P.30.8:‐ Exit meeting ‐ Findings Explanation