1. Arumeru District Council P.1.1 : RR_SI and RR_PM Gombe Estate Mmbogo and MlaluaNdurumaBwawani P 1.1 : RR_SI and RR_PM Gombe EstateMmbogo and MlaluaNdurumaBwawani P 1.2 : Construction of Materninty Ward at Oltrumet Health Centre P 1. 3 : Construction of Materninty Ward at Oltrumet Health Centre P 1.5 : Construction of Materninty Ward at Oltrumet Health Centre P 1. 4 : Construction of Sekei Bridge P.1. 5 : Construction of Sekei Bridge P 1. 6 : Construction of Boundary Fence around ADC

Transcript of 1. Arumeru District Council - PPRA

Page 1: 1. Arumeru District Council - PPRA

1.  Arumeru District Council  

    

 

P.1.1 : RR_SI and RR_PM Gombe Estate Mmbogo and Mlalua‐Nduruma‐Bwawani 

 

P 1.1 : RR_SI and RR_PM Gombe Estate‐Mmbogo and Mlalua‐Nduruma‐Bwawani 

 

P 1.2 : Construction of Materninty Ward at Oltrumet Health Centre 

 

P 1. 3 : Construction of Materninty Ward at Oltrumet Health Centre 

 

P 1.5 : Construction of Materninty Ward at Oltrumet Health Centre 

 

P 1. 4 : Construction of Sekei Bridge 

 

P.1. 5 : Construction of Sekei Bridge 

 

P 1. 6 : Construction of Boundary Fence around ADC 

Page 2: 1. Arumeru District Council - PPRA

 2.  BAHI DISTRICT COUNCIL  

   

 

P 2.1: Aditors at contractor's site office reviewing drawings 

P2.2: Uncompacted fill and poor concrete  workmanship on Kongogo Dam  

           

         

P 2.3: Un‐cemented Riprap at Kongogo Dam P 2.4: Poorly trimmed borrow pit at Kongogo 

   

P 2.5: Auditors checking dimensions compliance at Bahi DC Servant Quarters  P 2.6: Completed Kigwe Mnadani Drift 

     

 

           P 2.7: Auditors confirming a borehole at Mchito Borehole P 2.8: Auditors discussing with village leader at

Mundemu on the way forward - dry borehole

Page 3: 1. Arumeru District Council - PPRA

3. Bukoba District Council

 

  

 

 

P. 3.1: Cracks can be seen on the floor and walls of a newly constructed Agricultural Centre at Kikomelo  

  

 

 

P. 3.2: A newly constructed small bridge  P 3.3:  Oversize, dirty, sand stone coarse aggregates used for bridges/box culverts along Kalebe-Nyakibimbili road

 

  

 

 

P 3.4:   A bridge whose width was increased a day after casting without engineer’s approval along Kalebe-Nyakibimbili road 

Page 4: 1. Arumeru District Council - PPRA

4. Geita District Council

P 4.1: Poorly constructed pavement at the New Geita Bus Stand

P 4.2: An auditor and PE Technician carrying out measurements at the New Geita Bus Stand

P 4.3: Well constructed headwalls and wingwalls and poorly compacted approaches along Geita Town – Katoma Area Roads

P 4.4 Poor workmanship on constructed headwall and wing walls along Sungusira – Nyakaduha Road

P 4.5 One of the existing “Bridges” along Sungusira Road

   

Page 5: 1. Arumeru District Council - PPRA

5.  Igunga District Council P  5.1  ‐  Igunga  Town  ‐  Pipe  culvert  length  

measurement  

 

P  5.2 ‐ Igunga  Town  ‐ Compaction  checking,  gravel wearing course 

 

P 5.3 ‐ Igunga Town ‐ Pav. thickness measurement

 

P 5.4 ‐ Igunga Town ‐ Poor concrete for wingwall  

 

P  5.5  ‐  Borehole  at  Bulangamilwa  Village    ‐ 150m drilled/dry 

 

P  5.6 ‐ Borehole  at  Matinje  Village    ‐  200m drilled/successful 

 

P 5.7:‐ Washed out bridge to Mwanzugi village

 

P 5.8:‐Washed out bridge to Mbutu village   

 

 

Page 6: 1. Arumeru District Council - PPRA

6.  Ilala Municipal Council 

 

 

P 6.1: Rusted Handrails at Ulongoni Culvert P 6.2: Rusted Gabions at Ulongoni Box Culvert

 

 

P 6.3: CIUP Project Signboard  P 6.4: Obstructions within construction area - CIUP 

 

P 6.5: Effects of Leaking Roof on Ceiling board P 6.6: Cracks on walls and rusting wire mesh atat Msongola Secondary School Buyuni Secomndary School

Page 7: 1. Arumeru District Council - PPRA

7.  Kinondoni Municipal Council 

 

 

P. 7.1: Failed pavement on Kagera - 1st Inn Road P. 7.2: Siltation on Open Drain at India Embassy

 

 

P. 7.3: Cracks below the foundation on classroom at Mbeniteta Secondary

P. 7.4: Water Tank Riser and SIMTANK for X-Ray Room at Magomeni Health Centre

 

 

P. 7.5: Water Tank Riser at Makuburi P. 7.6: Disputed location of Water Tank Riser at Mburahati

Page 8: 1. Arumeru District Council - PPRA

 8.  Local Authorities Pension Fund  

 

 P. 8.1: Block work as per specification   

P. 8.2: Column 1000mm wide as per drawings   

  P. 8.3: Sub Contractors offices 

 

  P. 8.4: Ongoing plastering works 

    

Page 9: 1. Arumeru District Council - PPRA

 9. Magu District Council

Badugu – Nyangiri Road

P. 9.1: A borrow pit adjacent to the road P. 9.2: Verifications of dimensions on site

P. 9.3: A newly constructed road stretch without proper compaction

P. 9.4: Poor workmanship on constructed culvert

P. 9.5: Massive erosion on raised embankment P. 9.6: Concrete deck is nowhere to be found

P. 9.7: Box culvert under construction P. 9.8: Exit Meeting

Page 10: 1. Arumeru District Council - PPRA

  10.  Masasi District Council

P. 10.1 - Masasi Town - Conference hall concreting work

P. 10.2 - Masasi Town - Conference hall sand and aggregate stoke pile

P. 10.3 - Nagaga to Ng'uni Rd - Compaction checking, gravel wearing course

P. 10.4 - Lulindi to Mkundi Rd - Pav. thickness measurement

P. 10.4 - Masasi Town - Pipe culvert length inspection

P. 10.6 - Exit meeting - Findings Explanation

     

Page 11: 1. Arumeru District Council - PPRA

  11.  Morogoro Urban Water Supply and Sewerage Authority (MORUWASA) in Turiani Township 

Annex 6: Photographic Documentation    

 

  

 

P. 11.1: Supplied UvP Pipes  

P. 11.2: Discussions on excvated trench ready for pipe laying 

 

    P. 11.3: Poor Concrete on Guard House Column  P. 11.4: Project Signboard 

 

Page 12: 1. Arumeru District Council - PPRA

12.  Mtwara Mikindani Municipal Council

P 12.1 - PM works, Width measurement - Singino road

P 12.2 - Completed pipe culvert - Cast insitu

P 12.3 - Fish Market:-roofing and beams inspection

P 12.4 - Fish Market:-Front view after roofing completed

P 12.5 - Completed gravel wearing course - Tanu to Tandika Road 1.2km

P 12.6 - Exit Meeting - Finding and recommendation discussion

Page 13: 1. Arumeru District Council - PPRA

 13. Mtwara Urban Water Supply and Sewarage Authority (Mtuwasa)

P 13.1 - entry meeting - objective and methodology explanation

P 13.2 - water conduit pipes stockpiles

P 13.3 - aggregate stockpile for concrete P 13.4 - test pit for geotechnical investigation

P 13.5 - resident site office under construction P 13.6 - exit meeting - finding and recommendation discussion

Page 14: 1. Arumeru District Council - PPRA

14.  Muleba District Council Secondary School Construction in Bumbire Island

P 14.1: Boarding the Boat to the island P 14.2: The 90 Minutes journey is ready to begin

P 14.3: Some of the newly constructed buildings of Bumbire Secondary School

P 14.4: Are they really happy or simply fighting with fear and worries from the unknown?

BUHANGAZA IRRIGATION SCHEME PROJECT

P 14.5: Auditors listening to the contractor’s site supervisor while seated in site “office”

P 14.6: The construction is ongoing but far from completion

PERIODIC MAINTENANCE OF NSHAMBA

P 14.7: Verification of Road width P 14.8: Hips of gravel ready to be spread on the Road

Page 15: 1. Arumeru District Council - PPRA

15.  Mvomero District Council  

   

                 

                                                                                                                P 15.1 : Inadequate Septic Tank and poor workmanship  P 15.2: Inadequate Soak Pit for Livestock Training  

         

 

                                                        P 15.3: Inadequate Septic Tank                          

     

                    P 15.6:  Over flooded Mjonga Drift 

                                                 

P 15.5: Auditors taking measurements    

                      

P 15.8: taking measurements at Mjonga Drift 

                                                        P 15.7: Roofed Livestock Training Building

 

 

P 15.4: Well constructed Mvomero Town Road

Page 16: 1. Arumeru District Council - PPRA

 16.  National Health Insurance Fund 

(a)  The pictures below shows Medical Centre of Excellence in Dodoma 

 

P 16.1(a): Entrance of the building 

 

P 16.2(a): Steel truss for Roofing

 

P 16.3(a): Plumbing works 

 

P 16.4(a): Reinforcement are not stored properly and a completed water storage tank 

 

P 16.5(a): Aluminium Windows Installed at Site 

 

          

Page 17: 1. Arumeru District Council - PPRA

   

   (b)  The pictures below shows Medicare Centre at Dodoma University  

 

P 16.1(b): Entrance of the building  

 

P 16.2(b): Building Columns 

 

P 16.3(b): Reinforcement covered as per requirement 

        

Page 18: 1. Arumeru District Council - PPRA

 4.17  Public Service Pension Fund (PSPF)  

Page 19: 1. Arumeru District Council - PPRA

18.  Same District Council  

  P. 18. 1: Placing of gravel on poorly compacted heavy black‐cotton on Kwasakwaa Roads 

P. 18. 2 :Cracked culvert/chipped before placement on Msikitini road drain works

 P. 18. 3 : Ongoing Relini drift construction  P. 18. 4 : Narrow formation on Same‐Ruvu‐Mferejini 

 P. 18. 5 : Thickness measurement on Makanya‐Mvungwe  

  

 

P. 18. 6 : Inspection of drainage structures on Majevu‐Dido‐Njoro 

P. 18. 7 : Inspection of drainage structures on Minyal‐Mbono‐Mgagao

  

  

P. 18. 8 : Exit meeting with SDC DED and head of sections P. 18. 9: Entry meeting with SDC DED and head of sections

   

Page 20: 1. Arumeru District Council - PPRA

19.  Sengerema District Council  

P. 19. 1:  Kick Off Meeting

P. 19. 2:  Nyakasunga Water Supply Scheme

P. 19. 3:  Gravel on approach road was quoted for and paid but not expedited

P. 19. 4:  This is a severe crack on the deck of a newly constructed drift

Page 21: 1. Arumeru District Council - PPRA

20. Singida Municipal Council

P.  20.1:      ‐  PM  works,  Project  Signboard  ‐ Mwenge street road  

 

P.  20.2  ‐ Completed CRR base  course  layer  ‐ Msikitini road 

 

P. 20.3‐ PM:‐Width measurement, Msikitini road  

 

P.  20.4‐  Spot  improvement  work:‐Heavy  grading checking , Mandewa road 

 

P. 20.5 ‐ Width measurement ‐ Majengo ward road 

 

P.  20.6  ‐  Spot  improvement  work:‐Heavy  grading checking , Mughanga road 

 

 

Page 22: 1. Arumeru District Council - PPRA

21.  TANROADS – Arusha 

 

P.21.1 : PM on TCA Jct‐Minjingu road, overaly and shoulder graveling near Mondolu Jct 

 

P.21.2 : PM on Tengeru ‐ Mererani 

 

P.21.3 : Bridge Major Repair on KIA‐TCA Jct ‐ Kikatiti CBC 

 

P.21.4 : Bridge Major Repair on KIA‐TCA Jct ‐ Kikatiti CBC 

 

P.21.5: Site for new CBC on USA River‐Oldonyo Sambu road 

 

P.21.6 : Field Density measurement on Oldonyo Sambu road 

 

P.21.7 : Entry meeting with TRD‐Kilimnjaro Heads of Departments and RM 

 

 

P.21.7 : Exit meeting with TANROADS ‐Manager Arusha and Heads of Departments 

 

Page 23: 1. Arumeru District Council - PPRA

22.  TANROADS – Kilimanjaro 

 

P.22.1: Overlay of Himo‐KIA Jct Maili Sita Area 

 

 

P.22.2 : Headwall to be with the new Contractor after M/s Absolute wa terminated on Kasadala‐Lemira 

 

P.22.3  : Grouted stone pitching works  to be  finished by  the  new  Contractor  after  M/s Absolute  wa  terminated  on  Kasadala‐Lemira 

 

 

P.22.4 : Same‐Kisiwa‐Mkomazi East 

 

P.22.5 : Drainage and protection works on Mwembe‐Ndungu 

 

 

P.22.6  :  Entry meeting with  TRD‐Kilimnjaro Heads  of Departments 

 

P.22.7  :   Exit meeting with  TRD‐Kilimnjaro Heads of Departments and RM 

 

 

Page 24: 1. Arumeru District Council - PPRA

23.  TANROADS ‐ Dodoma  

P.23.5: Erosion caused by undirected water into culvert inlet

P.23.1: Auditors taking measurements on Nzali – Dabalo

P.23.2: Side view of a well done Msagali Vented Drift

P.23.3: Flood on Nzali River P.23.4: A well constructed Msagali Vented Drift

P.23.6: Erosion and ponding caused by not directing water into culvert inlet

Page 25: 1. Arumeru District Council - PPRA

  24.  TANROADS ‐ Morogoro      

      

       

                   

                   

                   

                   

                   

                   

                   

                   P.24.1: Measuring road width Mikumi ‐ Kidatu Section 

 P.24.2: Pot hole at Km 3.5 on Mikumi ‐ Kidatu Section 

 

   

     

 

         

         

         

         

         

         

         

         P.24.3: A well done Single surface dressing at  Mikumi ‐Kidatu Section 

P.24.4: Lined Drain in progress at  Mlimba wa Simba 

   

     

 

         

         

         

         

         

         

         

         

         P.24.5: Poorly trimmed borrow pit at Km 33.8 on Miyombo ‐ Lumuma Road 

P.24.6: Well completed Box culverts on both sides of Makutano Bridge 

   

     

 

         

         

         

         

         

         

         

         

         

P.24.7: Seriously eroded culvert at Km 41.6 on Lumuma P.24.8: Unprotected reinforcement steel at Makutano Bridge 

Page 26: 1. Arumeru District Council - PPRA

25.  TANROADS – Singida  P.25.2 ‐ Completed DBST:‐ Misigiri – Kiomboi  P.25.2  ‐  Rehab  work:‐Compaction  checking  Ulemo  ‐ 

Gumanga ‐ Sibiti 

P.25.3 ‐ Rehab work:‐Width measurement Ulemo ‐ Gumanga ‐ Sibiti  

 

P.25.4  ‐  Rehab work:‐Pav.  thickness measurement Ulemo  ‐ Gumanga ‐ Sibiti 

 

P.25.  5  ‐  Periodic Maintenance work:‐Width measurement Rungwa‐Itigi Mkiwa 

 

P.25.6  ‐  Spot  improvement:‐Pav.  thickness  measurement Rungwa‐Itigi Mkiwa 

P.25.7 :‐Entry Meeting in RM office 

Page 27: 1. Arumeru District Council - PPRA

27 

26 TANROADS – Tabora P.26.1  ‐  PM Works  ‐ Width Measurement  Rungwa  ‐

Ipole  P.26.2  ‐ PM  works  ‐ Compaction  checking  Rungwa  ‐

Ipole 

 

P.26.3  ‐  PM  works  ‐  Pav.  thickness  measurement  ‐Rungwa ‐ Ipole 

P.26.4 ‐ PM  Works  ‐ Width  Measurement  Kahama boarder ‐ Nzega 

P.26.5  ‐  PM  Works  ‐  Compaction  checking  Kahama boarder ‐ Nzega 

 

P.26.6‐ PM  Works  ‐ Pav.  thickness  measurement Kahama boarder ‐ Nzega 

 

P.26.7 ‐ Rehab works ‐ Silted pipe culvert Puge ‐ Ziba

 

P.26.8 ‐ Rehab  works  ‐ pipe  culvert  length measurement ‐ Puge ‐ Ziba 

Page 28: 1. Arumeru District Council - PPRA

28 

27. TANROADS – Mtwara P.27.1 - Entry Meeting in RM office P.27.2 - PM work:-Cut section, Mpapura-Mikao-

Kinolombedo

P.27.3 - PM work:-Width measurement Mpapura-Mikao- Kinolombedo

P.27.4 - Routine work:-grass cutting Mtwara - Mtegu

P.27.5  - Routine work:-bridge preventive Mtwara - Mtegu

P.27.6 - Major repair of Magomeni I bridge:-completed box 2x2.0x1.5m

P.27.7  - Rehab work:- Compaction checking Mnongodi - Kilimahewa

P.27.8  - Rehab work:-Pav. thickness measurement Mnongodi - Kilimahewa

P.27.9:-Exit Meeting in RM office

Page 29: 1. Arumeru District Council - PPRA

29 

28. Tanzania Eclectic Supply Co. Limited (TANESCO)

 

 

             

P.28.1: Electric Pole in someone’s plot  P.28.2: A new Madale Substation  

 

             

P.28.3: Askari House at Temeke Office  P.28.4: Debris at culvert at outlet – Access from Kilwa Road 

              

 

               

 P.28.5: Main Entrance Gate to Temeke Office 

P.28.6: Painted wall to the house at Ursino Estate 

 

 

       

P.28.8: Renovated Kitchen Wardrobe P.28.7: Renovated house at Ursino 

Page 30: 1. Arumeru District Council - PPRA

30 

29. Temeke Municipal Council

        

P.29.1:  Completed Malawi Box Culvert P.29.2:  Audit team verifying road width at Km 0+400 on Kurasini Road 

 

 

               

P.29.3:  Lined side ditch at Km 0+450 RHS on Kurasini Road  P.29.4:  Road sign on Kurasini Road  

 

 

                 

 P.29.5:  Rusted wire mesh at Keko Secondary    School 

P.29.6:  Cracks on constructed classroom at Pendamoyo Sec. School 

Page 31: 1. Arumeru District Council - PPRA

31 

30. Tunduru District Council P.30.1‐ Tunduru Urban ‐ carriageway width  measurement 

 

P.30.2 ‐ Tunduru Urban ‐ False information signboard

 

P.30.3  ‐  Tunduru  Urban  ‐  Compaction  checking,  gravel wearing course 

 

P.30.4 ‐ Tunduru Urban ‐ Pav. thickness measurement 

 

P.30.5 ‐ Masonya Bridge ‐ Top slab Rebars inspection 

 

P.30.6  ‐ Dormitory  Block  at Masonya  Sec  School  ‐  Painting and roofing works 

 

P.30.7:‐ SI works along Tunduru‐Namasaka Rd

 

P.30.8:‐ Exit meeting ‐ Findings Explanation