ObjectivesAfter this module the delegate shall be able to:-Understand the importance of cluster preparation in: Cluster planning Cluster health checks based on RNW measurements Neighbour list verification and parameter audit

Transcript of 0 - Intro_RAS51

1 © Nokia Siemens Networks Presentation / Author / DateFor internal use

3G RANOP 1Module 0 - Introduction

2 © Nokia Siemens Networks Presentation / Author / DateFor internal use

RANOP 1 - Introduction

• RANOP 1 – Pre-Optimisation material Contains

• Module 1 – Cluster Preparation

• Module 2 – RF Optimisation and Neighbour Planning

• Module 3 – Signalling

• Module 4 – Drive Test Analysis

• Module 5 – Inter-System Handover (ISHO) Optimisation

• Module 6 – Parameter Optimisation

• Module 7 – HSDPA Optimisation

3 © Nokia Siemens Networks Presentation / Author / DateFor internal use

Module 1 – Cluster Preparation

Objectives

After this module the delegate shall be able to:-

•Understand the importance of cluster preparation in:

• Cluster planning

• Cluster health checks based on RNW

measurements

• Neighbour list verification and parameter audit

4 © Nokia Siemens Networks Presentation / Author / DateFor internal use

Module 2 – RF Optimisation and Neighbour Planning

Objectives

After this module the delegate shall be able to

perform:-

•RF Verification and Optimisation actions

•Understand how new Sites should be integrated to

the network

•Neighbour Plan Verification

5 © Nokia Siemens Networks Presentation / Author / DateFor internal use

Objectives

After this module the delegate shall be able to:-

• Describe the signalling flows for AMR calls, PS calls, HSDPA calls, ISHO, SHO and SRNC relocation procedures

• Understand the key pieces of information contained in the messages

• Understand the protocols and transport mechanisms used for the various messages

Module 3 – Signalling Flows

6 © Nokia Siemens Networks Presentation / Author / DateFor internal use

Module 4 – Drive Test Analysis

Objectives

After this module the delegate shall be able to:-

•Understand the different elements required for an effective drive test program

•Understand how all aspects of drive data can be used to obtain a view of network performance

•Differentiate between genuine (RF) and non-genuine (system) failures

•Understand the KPIs that can be obtained

7 © Nokia Siemens Networks Presentation / Author / DateFor internal use

Module 5 – ISHO Optimisation

• To be added

8 © Nokia Siemens Networks Presentation / Author / DateFor internal use

Module 6 – Parameter Optimisation

Objectives

After this module the delegate shall be able to:-

• List some of the parameters that can be tuned for

improved performance

• Match these parameters to Call Setup and Call

Retention improvement areas

• Understand how new RAS05 & RAS51 PS features

effect for the throughput, file download time & PS

Call setup success

HSDPA parameter optimisation is included to module 7- HSDPA optimisation

9 © Nokia Siemens Networks Presentation / Author / DateFor internal use

Module 7 – HSDPA Optimisation

Objectives

After this module the delegate shall be able to:-

• Understand HSDPA optimisation areas

• Understand main HSDPA KPIs and how to different

HSDPA parameter settings effect for the

performance