BS 10080-2005
Liquid Argon technique: a pizero identification analysis for T2K beam Paweł Przewłocki, A. Soltan Institute for Nuclear Studies, Warsaw Warsaw Neutrino.
I.Kreslo CHIPP workshop on Detector R&D, University of Geneva, 11-12 June 2008. 1 Development of Liquid Nitrogen Time Projection Chambers A. Ereditato,
N. Morgan, Virginia Tech Qweak meeting,Oct ‘05 Region 2 Drift Chambers Status Report Qweak Collaboration Meeting October 2005.
Balancing Interconnect and Computation in a Reconfigurable Array Dr. André DeHon BRASS Project University of California at Berkeley Why you don’t really.
VLSI Physical Design: From Graph Partitioning to Timing Closure Chapter 7: Specialized Routing © KLMH Lienig Chapter 7 – Specialized Routing VLSI Physical.
CS294-6 Reconfigurable Computing Day 10 September 24, 1998 Interconnect Richness.
The ICARUS T600 LAr TPC Andreas Badertscher, ETH Zurich ICARUS collaboration.
Abstract
11 Development of Cold Electronics for “Giant LAr TPCs” Veljko Radeka BNL for “Cold Electronics Team”: Gianluigi De Geronimo, Sergio Rescia, Hucheng Chen,
Considerations for increasing the single-phase fiducial volume Jim Stewart July 1 2015 EFIG J stewart - EFIG July 1 20151.
The ICARUS T600 LAr TPC