Results from the 2009 Beam Commissioning of the CERN Multi-Turn Extraction
6/14/11 Collimation Upgrade Plan & Questions R. Assmann, CERN for the collimation team 14/6/2011 LHC Collimation Project Review.
Evian summary 1 24-1-2011 Operational challenges (Feed forward from Evian LHC operation workshop) 7-9 December 2010 Day after last beam Two nights – 7.
Machine Protection during Beam Commissioning
Collimation MD’s and Preparation of Review
The LHC Beam Position System
Operational challenges ( Feed forward from Evian LHC operation workshop)
Technical Board on LHC Injector Start-up Tune Monitors in PSB, PS and AD TT2/TT10 BPMs
Analysis of schemes for doublet production
Peugeot HYbrid3 Evolution Official Info
4 November 2014 Mike Hourican TE/ABT1 LIU-SPS Injection Upgrade With input from Jan Borburgh, Bruno Balhan.
Friday March 4 th