T.Eriksson on behalf of the AD-team CERN, BE department, 1211 Geneva 15 September 2011COOL11 T. Eriksson CERN BE/OP.
Electron Cooling in the Accumulator McGinnis Electron Cooling in the Accumulator Dave McGinnis.
CTF3 Laser Status Massimo Petrarca CLIC January 23 2008.
Andrzej Siemko, CERN, GenevaCracow Epiphany Conference 10 – 12 January 2011 The first year of operating the LHC accelerator Andrzej SIEMKO CERN, European.
RESEARCH ON BEAM SIZE MONITORS S. Csorna, Vanderbilt U. LCCOM2, June 30, ’02, Santa Cruz Proposal for Non-Intercepting Beam Size Diagnosis Using Diffraction.
(n)QPS 12-12-2010 LHC status and plans LHC Status and Plans Mike Lamont for the LHC team 1.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
Wakefield Calculations for the ATF2 Beamline 03.04.2013A. Lyapin, Wakefield Calculations for the ATF2 Beamline 1 S. Boogert, J. Snuverink (JAI/RHUL, UK)
CLIC Post-Collision Line
CLIC post-IP beamline
RHIC Accelerator Capability: Present and Future
Physics with CMS