April 28th, 2011Timing Workshop, Chicago Paul Scherrer Institute The role of analog bandwidth and signal-to-noise in timing for waveform digitizing Stefan.
April 28th, 2011Timing Workshop, Chicago Paul Scherrer Institute Limiting factors in Switched Capacitor Arrays Sampling speed, Timing accuracy, Readout.
SLAC XFEL Short Bunch Measurement and Timing Workshop 1 Current status of the FERMI project (slides provided by Rene Bakker) Photoinjector laser system.