Hidden Process Models: Decoding Overlapping Cognitive States with Unknown Timing
LHC Beam Dumping System Status and Readiness for LHC Run II Evian Workshop 2-4 June 2014 Nicolas Magnin – TE/ABT/EC On behalf of TE/ABT team. Thanks to.
Performance Degradation of the Low Level RF Control System for VUV-FEL
The ATLAS Level-1 Central Trigger
1 Timing and RF Distribution NLC -> ILC Josef Frisch.