Avatorproject1
Progress and Plans for Solenoid-free Plasma Start-up and Ramp-up R. Raman D. Mueller, S.C. Jardin and the NSTX-U Research Team NSTX-U PAC-35 Meeting PPPL.
Commas and Their Use ENGL 3100 Dr. Shelley Thomas.
Commas and Their Use
Sat 18/3 - Ramp to 4 TeV
Monday 11.04 07h34: beam (1020b) lost after 10 Hz RF trim. Fill 1694. 07h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
Tuesday
Monday 11.04
Very Preliminary proton MD summary G. Arduini – BE/ABP
Vacuum observations during the 7 5 and 50 ns bunch spacing operation (MD 17-20 Nov 2010)
MD#3 Progress
MD#2 News & Plan Tue – Wed (19. – 20.6.)