Now that we are all in detention, what next? AYP Rollout, 8_8_14.
Themis Bowcock
CMX Hardware Status Chip Brock, Dan Edmunds, Philippe Laurens@MSU Yuri Ermoline, Duc Bao Ta @CERN Wojciech Fedorko @ UBC Michigan State University 25-Oct-2013.
Silicon Front End Electronics and Data Acquisition System for PHOBOS experiment at RHIC
Tracker Week October 2004 0 CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
ALPIDE status and future plans CERN, INFN, NIKHEF, CCNU (China) and YONSEI (Korea)
Status of CMX design studies
26 th Annual MIS Conference February 13, 2013 Washington, DC
LKr readout system specifications
Ad Hoc Reports on the Fly - Dare to Dream It!
The Great Recession