4.2 Materials - Subgrade (Modulus and CBR)
Full-Depth Reclamation Pavement Rehabilitation Method existing asphalt, CABC and a pre-determined depth of the subgrade soils are uniformly pulverized.
CBR Test
6. road & highways
Pavement Final Project Raj Naidu Wednesday
f Cpa Design Construction Specifications
Pavement design
Metodos Para Evaluar El Modulo Resiliente (Ingles)
Ws Dot Pavement Policy Final 71211
New Ew Specs for Hal Nov 2009-Sept 2012
WSDOT PPM
Narrow Pavement Widening - Geosynthetic Reinforcement