SNiP RK 2.02!05!2002 (E) Fire Safety of Buildings and Structures
Trade of Plumbing – Phase 2 Module 1 – Unit 6 Module 1: Thermal Process and Mild Steel Pipework Unit 6: Mild Steel Pipe, Preparation and Jointing Duration.