13.4.02, V.Korbel, DESY II. ECFA-DESY LC workshop, St.Malo 1 Status of the Tile-HCAL for the Detector at TESLA 1. Actual project time planning 2. Groups.
Status of the Tile-HCAL for the Detector at TESLA