Design and Fabrication of Pulse Tube Refrigeration System
David Foster, CERN NorduNet Meeting April 2008 NorduNet 2008 LHCOPN Present and Future David Foster Head, Communications and Networks CERN.
L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities P. Forck et al.,
Preparation of Review R. Assmann et al CWG, 6.6.2011 CWG 6.6.2011 R. Assmann.
Status of GSI-FAIR Project magnets - open issues - G. Moritz GSI CARE HHH AMT November 23 2005.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
12/03/2013MPP Workshop Annecy Update on Beam Failure Scenarios Jan Uythoven Thanks to: T.Baer, R.Schmidt, J.Wenninger, D.Wollmann, M.Zerlauth, other MPP.
Neutrino Factory Target Cryostat Review Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
LHC Update 5/6/2010 D Ingram Photos: CERN unless otherwise noted.
Thoughts on Incorporating HPRF in a Linear Cooling Channel Michael S. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory NuFact09—IIT.
Rencontres de Blois “Particle Physics and Cosmology” Blois, France 31 st May 2011 Stephen Myers Director for Accelerators and Technology, CERN Geneva The.
Name Event Date Name Event Date 1 CERN W. Scandale & F. Zimmermann HHH, CARE 08, CERN, 03.12. 2008 High Energy High Intensity Hadron Beams