e1theory
Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
Considerations About UN38.3 T4 Test, and its Applicability to Large Lithium Batteries. How to improve this test? 1.
1 Recent (selected) results from CloudSat and the A-Train Graeme L Stephens Co-op Institute for Res. Atmosphere (CIRA) and Dept Atmospheric Sciences Colorado.
Luginsland - Plasma and Electro-energetic Physics - Spring Review 2012
Tissue engineering with light
A career in the process industry - Sharon Louch
Introduccion a Small Basic
The Current T2K Beam Window Design and Upgrade Potential Oxford-Princeton Targetry Workshop Princeton, Nov 2008 Matt Rooney.
5/15/06H. Ray : Pheno 06 MiniBooNE Results worth waiting for Heather Ray [email protected] Los Alamos National Laboratory.
31.March.2004 C. A. Martins, CERN AB/PO 1 Analysis of the possibility of using of a ALICE/LHCb type power converter in TT2A target test by Carlos DE ALMEIDA.