The Messenger 145
Astronomy Via the Internet
LSST Scheduler Development Workshop Scheduler Design Francisco Delgado Sr. Software Engineer Telescope & Site.
LSST Telescope and Site Observatory Control System Interface Review Scheduler Design Francisco Delgado.
A goal of the LSST project is to capture the optical sky into a database so effectively that observing the database is a satisfactory, and even superior,
201 st Meeting of the American Astronomical Society Wednesday, January 8, 2003 Session 76.12
Build in 1998 by CNRS. Fully robotized. D=25 cm f=85 cm, CCD Andor 2x2k
Build in 1998 by CNRS. Fully robotized. D=25 cm f=85 cm, CCD Andor 2x2k Field = 1.9x1.9°, sampling 3.3 arcsec/pix About 12 GRBs/year Variable stars Minor.