Cern Acceleator School Chios 2011 High Brilliance Beam Diagnostic A. Cianchi University of Rome “Tor Vergata” and INFN.
ERHIC design status V.Ptitsyn for the eRHIC design team.
Massimo GiovannozziCAS - 2-14 October 20051 Sources of emittance growth M. Giovannozzi CERN- AB Department Summary: Introduction Emittance growth in.
IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1.
Ionization Cooling for a Collider
Thomas Roser EIC collaboration workshop MIT, April 6, 2007 eRHIC Design eRHIC Schemes R&D Items Cost and Schedule.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Beam-Beam Simulations for RHIC and LHC J. Qiang, LBNL Mini-Workshop on Beam-Beam Compensation July 2-4, 2007, SLAC, Menlo Park, California.
eRHIC Design
Working Group 2 Closing Summary
Ionization Cooling for a Collider David Neuffer Fermilab 7/15/06.
1. Simulation - space charge and beam loading 2. Implementation of 2.5 MHz Acceleration