Booster Synchrotron Cavities: An Overview in the Context of PIP Mohamed Hassan, Timergali Khabiboulline, Vyacheslav Yakovlev 07/03/2013.
The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009 Update of Control System Plans for the TPS C. Y. Wu, C.H. Kuo, Jenny Chen,
The IR lattice design and optimization of the dynamic aperture for the ring Yiwei Wang, Huiping Geng, Yuan Zhang, Sha Bai, Dou Wang, Tianjian, Jie Gao.
1 The LHC Accelerator Complex Jörg Wenninger CERN Accelerators and Beams Department Operations group Hadron Collider Summer School - June 2007 Part 1:
GSI - 20.08.04P. Lenisa - Univ. Ferrara and INFN 1 PAX Polarized Antiproton Experiment PAX Collaboration Spokespersons: Paolo.
Clinical Neutron Therapy Center Donna Kubik Spring, 2005.
LHC@ATLAS Status and Recent Results Ljiljana Simic Institute of Physics, Belgrade Gravity: New ideas for unsolved problems Divcibare, 2011 In honour of.
LHC Upgrade Part 4: RF systems for the LHC upgrade
Mathilde FAVIER Fellow in BE/BI/QP Mathilde FAVIER BE/BI-QPSCHOTTKY STATUS - BI DAY - December 6th 20121.
Beam Commissioning WG, 10 August 2010 1 Luminosity Scans in the LHC S. White.
Good morning!
Linac Laser Notcher Project in the Proton Improvement Plan (PIP)