Tom Wiener, P.E. MnDOT Project Controls Engineer Matt Reid, P.E. HDR Engineering, Inc.
2015 Consulting Services Agreement EPSI
. Standard Contract Forum 6 July 2005 14.00 Customer Suite, BT Centre, London.
Dr. SangHyun Lee
Administering Lump Sum P/T Contracts via a Cost Loaded Schedule
Ladysmith Chronicle, September 17, 2013
July Member Newsletter