Geoff Waldschmidt RF Engineer ASD / RF DOE Lehman CD-2 Review of APS-Upgrade 4-6 Decem ber 2012
SCU Magnetic Measurement System Design and SCU0 Measurement Results
SPX - Cavity WBS U1.02.01.02.05, U1.03.03.05, U1.03.03.12
SPX - Technical Integration WBS 1.03.03
Conventional Insertion Devices WBS U1.03.04
SPX Low-level RF System WBS APS-U1.03.03.02 (SPX) WBS APS-U1.02.01.03.02 (SPX0)
SPX - Technical Integration WBS 1.03.03 Ali Nassiri RF Group Leader SPX Technical Lead Accelerator Systems Division DOE CD-2 Review of APS-U 4-6 December.