Project Management
Project Management Fundamentals With Microsoft Project
1 Presented by: Ms. Fatou SIMA Meteorologist Dept. of Water Resources 7, Marina Parade, Banjul Tel: 4377098/7990855 Email: [email protected].
Expedition route. Five weeks, 20 March–26 April 2002, 1050 miles (1700 km), minimum temperature –30 F (–34 C). Figure at right shows the equivalent distance.
Assessment Regular process for global reporting and assessment of the state of the marine environment, socio-economic including socio-economic aspects.
4.6 Creation of 3GPP 4.7 How does 3GPP Operate? 4.11 Beyond 3GPP Release ’99.
EMBA Strategy Implementation. Morning Introduction to project management Work Breakdown Structure Building the Project Plan Implementing the Project Plan.
Dust – Climate Interactions
Collaborative Research on Sunlight and the Arctic Atmosphere-Ice-Ocean System ( AIOS )
Chapter 4 Background and Standardization of WCDMA
World Meteorological Organization Working together in weather, climate and water