Fatigue for Engineers
May 31-June 1, 2001 A. R. Raffray, et al., Assessment of Dry Chamber Walls as Preliminary Step in Defining Key Processes for Chamber Clearing Code 1 Assessment.
March 8, 2001 A. R. Raffray, et al., Assessment of Carbon and Tungsten Dry Chamber Walls under IFE Energy Depositions Assessment of Carbon and Tungsten.
March 3-4, 2008/ARR 1 Power Management Technical Working Group: TRL for Heat and Particle Flux Handling A. René Raffray University of California, San Diego.
9665
CVT Without Limits
05.10.20151/38 Lifetime Management of Flash-Based SSDs Using Recovery-Aware Dynamic Throttling Sungjin Lee, Taejin Kim, Kyungho Kim, and Jihong Kim Seoul.
Reliability of fibre-optic data links in the CMS experiment
Reliability of fibre-optic data links in the CMS experiment Karl Gill CERN EP/CME-OE.